Reducing on‑site labor by 40% with modular petrochemical platform solutions, 100% factory pre‑assembled pipe racks and vessel support systems; this modular petrochemical platform cuts field installation workload while ensuring stable structural performance for industrial projects.

Engineering Challenges & Solutions

Piping & Structural Clash
Pain Point: Dense refinery piping often leads to structural clashes during site installation for the modular petrochemical platform, causing costly project delays.
Solution:Utilizing BIM (Tekla/Revit) full‑model design, we perform 100% clash detection before fabrication, ensuring every penetration and support point for the modular petrochemical platform is accurate.

Corrosion & Fire Safety
Pain Point: Petrochemical zones often feature high salt-spray or chemical corrosion, directly threatening structural integrity.
Solution: Offering C5-M level anti-corrosion coating or hot-dip galvanizing (≥85μm), with integrated fireproof coating options per process requirements.
Technical Specifications
System Integration Capabilities
Technical Dimensions | XGZ Petrochemical Standards |
Design Codes | AISC 360, EN 1993, SNI Compliant |
| Erection Tech | 100% Bolted, No On-site Welding |
| Corrosion Grade | C5-M Level, ISO 12944 Industrial Grade |
Fabrication Accuracy | BIM-driven Laser Cutting, Millimeter Precision |
Support Load | Custom Reinforcement for Reactors & Exchangers |
Case Study: Qingdao Major Refinery Pipe Network



Frequently Asked Questions


