15-03-2025 Recently, the main pre-assembly of the irregular truss space structure project constructed by our company was successfully completed.►As a complex 3D curved surface engineering project, it features high technical requirements: covering an area of over 2,200 m² with a roof elevation of 8.9 meters, ea