Industrial steel building is a great invention. All components are prefabricated in the factory, and the site only needs to be assembled simply, thus greatly shortening the construction period. For a building of 6000 square meters, the basic installation can be completed in only 40 days.
What should I pay attention to when using Industrial steel building?
What are the reasons why Industrial steel building is used more and more widely?
What are the steps involved in the general process of Industrial steel building installation?
1. Industrial steel building construction has strict requirements for construction measurement. When the steel structure workshop stops the structural calculation, the mechanical model is very clear, and the size change has an obvious influence on the model. Therefore, during the manufacturing and installation stages, construction measurement is a more important issue. For example, inaccurate blanking will result in deformation of components; failure to be placed in place during installation will affect the load-bearing effect of the environmental characteristics of the construction site welding of steel structure workshops.
2. The steel of Industrial steel building has the characteristics of thermal expansion and contraction, and it is sensitive to weather, temperature and other conditions during the installation process. Industrial steel building welding has its own special technical requirements. In practice, when natural conditions cannot meet the work requirements, manual measures are often taken to create conditions for construction, such as preheating of welding rods and preheating and heating of steel plates. If the size of the steel structure factory building changes greatly during the construction process, the temperature is too high or too low will affect the accuracy of the device.
3. The Industrial steel building is easy to rust and has poor fire resistance, so it needs to be painted and maintained. Paint the steel structure factory building fireproof coating on the exterior of the Industrial steel building to play the role of fire protection and heat insulation maintenance, to prevent the steel from rapidly heating up in the fire and reducing its strength, and to prevent the steel structure factory building from losing its support ability and causing the building to collapse.
The grid structure of Industrial steel building has the advantages of reasonable stress, large stiffness, light weight, single member and convenient fabrication and installation. In recent years, it has been widely used in public and industrial buildings with large span and large column network. It can be used not only for roof structure, but also for floors, walls and special structures.
1. The main structure hoisting of Industrial steel building,
2. Secondary structure installation of Industrial steel building,
3. Installation of roof panel and insulation layer of Industrial steel building,
4. Wall maintenance and installation,
5. Finally, the detailed structure of Industrial steel building.
After reading this, have you also had the idea of ordering Industrial steel buildings. At Qingdao Xinguangzheng Steel Structure Co., Ltd., you can get the best quality Industrial steel buildings and the most intimate after-sales service.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
Mexico galvanized prefab steel layer house building with cages Project
Project address: Mexico
Area: 120m * 16m * 7m
Detailed parameters: Hot-dipped galvanized steel beam, steel column with zinc thickness 100um. Purlins are 275g/m² zinc which
life span can reach 15-20 years.The reasonable design of the feeding regulator ensures the regulator move stably, and the birds will not run away and get stuck.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Steel structures are a new type of construction system that offers the benefits of low weight, easy installation, short construction time, good seismic performance, fast investment recovery and low environmental pollution. It is therefore generally preferred by all parties in the industry. Under the call for green construction, energy saving, environmental protection and resource recycling, steel structures have gradually become widespread in agricultural steel building and the scale of the steel construction industry has expanded further.
What are the requirements for the operating equipment of agricultural steel building?
What are the technical requirements for agricultural steel building?
What are the construction requirements for agricultural steel building?
1. The machinery and equipment of the agricultural steel building are operated and maintained by designated personnel, and the operating certificates are complete.
2. Mechanical operation part and on-site electricity requirements:
a. The rotation and dangerous parts of various machines and electric machinery must be equipped with protective devices.
b. Electrical equipment and wiring must be well insulated, with rain-proof and moisture-proof facilities.
c. The electrical box has a door, color code and number, which meet the installation height. The high-voltage leakage protector and zero grounding are complete. The switch box and electrical equipment must be "one machine, one switch, one leakage", and the fuse and actual equipment load Match.
d. When installing electrical equipment, the switches, circuits, grounding devices, etc. must be inspected, and they must be intact and undamaged, with good insulation.
(1) The agricultural steel building has a reasonable structure, a 360-degree undercut connection, and no bolts on the roof, which completely avoids water seepage and water leakage.
(2) Adopt self-fixing bolts to fix, simplify the operation and greatly reduce the labor intensity of workers. There is no need to set up a scaffold fixing nut, which improves the safety of operation.
(3) The boom of agricultural steel building is detachable and the angle can be adjusted freely, which is suitable for simultaneous construction of arch roofs with multiple spans.
1. First, according to the functional requirements of agricultural steel building, adopt a corresponding reasonable structure system. Achieve advanced technology, novel structure, and achieve the unity of architecture and structure.
2. The agricultural steel building is mostly based on rods, so the size of the rods is as modular and standardized as possible, which is convenient for mechanized manufacturing, transportation, installation, and improves productivity.
3. The agricultural steel building adopts high-efficiency steel with high economic indicators.
4. The nodes of agricultural steel building are very important. Appropriate connection methods should be adopted to make the node design consistent with the simplified structural calculation model. In the past, most of the structural damage occurred at the nodes, so the nodes must be carefully designed and constructed. Advanced and reliable connection methods are used.
Qingdao Xinguangzheng Steel Structure Co., Ltd. employs more than 100 workers, through the efforts of their entire staff, the agricultural steel buildings of high quality, widely used in a variety of architecture, have shared the broad masses of the worldwide market for over a decade.
Introduction of Zhongjie era Steel Structure Frame Overpass Project
Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.
After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.
The advantages of industrial steel building are high seismic performance, good fire resistance, short construction period, and durability. Compared with traditional factory buildings, industrial steel building has improved a lot, so it is strongly welcomed by the market.
What are the types of single-structure industrial steel building?
What are the advantages of single-structure industrial steel building?
What are the advantages of industrial steel building construction?
1. From the height:
The height of the drip level of a single-storey factory building is very important. Some factory buildings are 4-5 meters high, some are 6-7 meters, and some can be as high as 11-12 meters or higher. Generally, the taller the factory building, the more difficult it will be to build, and the more expensive the material costs will be.
2. From the external building structure:
Simple iron sheet: It is the simplest, a factory built with iron sheet relatively freely.
Steel structure workshop: The steel structure workshop is divided into steel structure or ordinary steel structure. Color steel structure is more than ordinary
much better.
Concrete structure: The wall is built with bricks and the roof is sealed with concrete. This structure has better safety and heat insulation than the previous two.
3. From the internal structure:
It is divided into those with corbels and those without corbels. Only the workshops with corbels can install cranes (also called cranes). This is an important part of industrial production. If there are machinery and equipment to install cranes, just Must have corbels to use.
industrial steel building has the characteristics of forming a large space for use, easily meeting the requirements of the production process, and convenient internal transportation organization, which is conducive to the placement of heavier production equipment and products, and can realize the industrialization of the production of plant building components and the mechanization of on-site construction. Therefore, industrial steel building has been widely used in industrial buildings such as metallurgy, machinery manufacturing, motor manufacturing, chemical and textile industries. Common structural forms of reinforced concrete single-story factory buildings include bent frame structure and rigid frame structure.
1. industrial steel building has good structural performance, light weight, high strength, and good seismic performance.
2. The steel used in industrial steel building is recyclable, which is more energy-efficient and environmentally friendly than masonry and concrete.
3. The industrial steel building is processed by the factory, so the quality of the industrial steel building is guaranteed.
4. industrial steel building materials have light weight and low base cost.
5. The on-site construction period of industrial steel building is short. There is basically no wet work on site, and no dust, sewage and other pollution will be generated.
6. The cross-section of structural components is small, the pillars are very thin, the walls are very thin, and the building area is large.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been committed to providing customers with reliable industrial steel buildings and perfect after-sales service so that customers can invest easily, use them with confidence, and have no worries.