Industrial steel building mainly refers to that the main load-bearing components are composed of steel. Including steel column, steel beam, steel structure foundation, steel roof truss (of course, the span of the plant is relatively large, and they are basically steel structure roof truss now), steel roof. Note that the wall of steel structure can also be maintained by brick wall.
What should be taken into account in the day-to-day maintenance of industrial steel buildings?
What are the arrangements for the planning of industrial steel buildings?
What should be taken into account when selecting industrial steel building?
After the installation of our industrial steel building, the owner is not allowed to change its structure privately, not to remove screws and other parts, and not to increase or reduce the partition wall. If you need to change a part, you need to negotiate with the manufacturer. It is up to the manufacturer to decide whether it can be changed. After approximately three years of use, the steel structure must be maintained with colour to give the building beauty and safety. industrial steel buildings are connected by steel construction components, so electrical devices such as wires should be insulated by cable channels in order to avoid accidents involving electric shocks.
The maintenance of industrial steel buildings is closely linked to the durability of the steel structure. That is why the industry pays enough attention to it. If you have problems with maintenance and maintenance, you should contact a professional steel construction manufacturer for help.
1. Insurance: Avoid rain water from the outside entering the metal roof of the industrial steel building. Rainwater enters the metal roof mainly through overlapping joints or knots. In order to achieve the function of the centrifuge, it is necessary to use a sealing disc at the screw connection and to make a concealed fixation. Use sealants or welds on the top of the plate. Best use a long board to remove the overlap. Close water-tight treatment for bleeding.
2. Fire protection: The metal material does not burn in the event of fire and the flame does not penetrate the metal roof plate.
3. Wind pressure resistance: industrial steel building can withstand the maximum local wind pressure and the metal roof plate is not removed by negative wind pressure. The wind resistance depends on the strength of the metal roof plate and the fixing seat and the density of the fixing seat.
Sound protection: industrial steel building prevents sound transmission from the outside to the inside or from the inside to the outside. Fill the metal sheet with sound insulation material (mostly insulated cotton) and the sound insulation effect is expressed by the sound intensity difference on both sides of the metal sheet. The sound insulation effect depends on the density and thickness of the sound insulating agent. Note that sound insulating agents have different locking effects on sounds of different frequencies.
After reading these words, do you also want to order an industrial steel building? If necessary, you can contact Qingdao Xinguangzheng Steel Structure Co., Ltd., which is an advanced industrial steel manufacturer.
The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.
Steel structure workshop is composed of frame, beam, wall and weighing column, etc. In the design of single-layer steel structure workshop, the first thing to ensure that the structure of the workshop does not affect the use of the second in the design time to calculate the bearing force of the beam, the selection of materials to meet the relevant standards.
Composition of single-layer steel structure workshop:
1. Transverse frame: composed of columns and the roof truss or roof beam supported by it, it is the main load-bearing system of the steel structure of single-storey workshop. It bears the dead weight of the structure, the wind and snow loads and the vertical and horizontal loads of the crane, and transfers these loads to the foundation.
2. Roof structure: structural system bearing roof load, including transverse frame beam, bracket, middle roof frame, skylight frame, purlin and so on.
3. Support system: including the support of the roof part and the support between columns. On the one hand, it forms the longitudinal frame of the steel structure of the single-storey workshop with columns and crane beams to bear the longitudinal horizontal load; On the other hand, the main load-bearing system is connected by individual plane structure into the whole structure of space, so as to ensure the necessary stiffness and stability of the steel structure of the single-storey workshop.
4. Crane beam and brake beam (or brake truss) : mainly bear the vertical and horizontal load of the crane, and transfer the load to the transverse frame and longitudinal frame.
5. Wall frame: Bear the dead weight and wind load of the wall.
Single-layer steel structure plant design points:
1. In the column network arrangement of single-storey steel structure buildings, when column spacing is not equal, especially the column spacing of each longitudinal column column, the columns should be arranged on the common horizontal positioning axis to ensure the stiffness requirements of the workshop, so that the workshop can be used normally.
2. For the temperature expansion joint section length of single-storey steel structure building, it is better to set the expansion joint when the plant structure exceeds the designed value under special circumstances. This has the advantage of being separated into independent structures, making temperature changes negligible after a drop.
3. The transverse frame calculation of single-storey steel structure building. The transverse frame structure transfers the load and action of the plant structure to the foundation, which is the main load-bearing structure of the plant.
4. Calculation of longitudinal force transmission system of single-storey steel structure building, steel column, column.
Qingdao Xinguangzheng steel structure group is a leading manufacture in China. With 25 years experience, we have confidence to provide you the highest cost performance.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Introduction for Low Price Construction Material Steel Structure Showroom Building Metal Mall Design
Aruba exhibition hall project is a renewal project of Aruba stadium customers, with a building area of 1585 square meters. The exhibition hall is a two-story frame structure, and the warehouse is a portal steel frame structure. Some walls of the exhibition hall are made of glass curtain wall and others. The storehouse is made of cement foam board, and the roof is a polyurethane composite board.
Project location: Aruba
Area: 1585 square meters
Span: 127m
Eaves height: 8.4m
Number of floors: 2
Wind speed: 148km / h
Shapes: Framing
Steel consumption: 92t
Name | Low Price Construction Material Steel Structure Workshop Building Metal Factory Shed Design |
Material | Q235B,Q345B galvanized or painted steel |
Main frame | H-section steel column and steel beam |
Purlin | C/ Z- section steel purlin |
Roof and wall | a) Color-coated corrugated steel sheet, |
Door | a)Rolling up door, |
Window | PVC /Steel or Aluminum Alloy frame window |
Down spout | Round PVC pipe |
Usage | All kinds of industrial workshop, warehouse, poultry shed, supermarket, hangar, etc |
Service life | 50Years |
Detail Information
Roof with a single layer of galvanized steel plate sea blue crown Island, its structure and technical requirements are as follows:
1.V820 type 0.50mm thick galvanized roof panel (sea blue) crown Island
2.75mm thick glass wool with aluminum foil
3.200 * 200 coated steel mesh
4.Q235B C-type steel roof purlin
5.Q345B steel beam
Wall:
1.YX-840 plate type 0.40mm thick galvanized wall panel white gray crown Island
2.Q235B C steel wall purlins
3.Q345B steel column
Paint coating:
1. Shot blasting, rust level Sa2.5
2. In the gray anti-corrosion primer two, each 30 um
Other:
1. Roof panel - sea blue
2. Wall panel - white gray
3. Steel components - medium gray
Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
Project Area: 23408 sqm
Project Usage:Pakistan Cola workshop
Project Location: Lahore, Pakistan
Project weight of steel structures: 760 tons.
Project Detail:
Wall & Roof:0.5mm galvanized steel sheet +50mm glass wool+0.4mm galvanized steel sheet.
Span: Multi-Span 100m and 50m
Total Height: 12m
Project picture of Pakistan Prefabricated Steel Structure Construction Cola Workshop :
Company information
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Introduction of Product:
Steel structure building has a history of several decades in Europe and the United States. It develops rapidly with the
advantages of good seismic resistance, environmental protection and rapid installation. After more than 20 years of
steady development, xinguangzheng steel structure has continuously improved the "turnkey" ability of steel structure
product project from design, construction to decoration completion, providing systematic solutions for enterprises.
Take xinguangzheng apartment building as an example to show the new face of industrial enterprise apartment building.
Xinguangzheng steel structure apartment building
Project structure system:Steel structure light steel structure
Project area:270 square meters
Project size:20*13.5*16m
Project detail: The whole apartment building has 5 floors, from the foundation to the external wall insulation, including water and
electricity system and decoration, are all completed by xinguangzheng steel structure, and equipped with independent
energy-saving central air conditioning.
One is the staff dining room, the other is cement foam board for maintenance. The two - five story is the employee dormitory, the
two outer wall maintenance material is the cement foam board, and the three to five layers of external wall maintenance material
is composite board. There are 4 suites on each floor. The bathroom and toilet of each room are independent rooms. The specific
configuration is 2 rooms, 1 kitchen, 1 hall,1 bath and 1 toilet.