The light steel structure of commercial steel building is a structure composed of steel materials, and each component or part is connected by welding, bolts or rivets.
commercial steel building is mainly used for low-rise or multi-storey buildings: the prefabricated wall panels are transported to the construction site by special vehicles, hoisted by cranes, connected with the foundation by anchor bolts and connectors, and the wall panels are connected by screws and connectors, and then the light steel floor is installed. The light steel floor is composed of floor beams, profiled steel plates Steel wire mesh and concrete. The construction of the main structure can be completed by constructing the upper floor according to the construction method of one floor and finally installing the roof. The system is applicable to buildings with 6 floors and below. It has the advantages of high assembly rate, short construction cycle, earthquake resistance and typhoon resistance, thermal insulation, large use area in the sleeve, no exposed beams and columns, and recyclable materials.
1. The construction period is short. The construction period of commercial steel building can be shortened by more than 50%;
2. The project quality is stable. The quality of parts and components produced in commercial steel building factory is more stable, which solves many common quality problems of on-site construction technology and human errors in on-site construction, and ensures the project quality;
3. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
4. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. commercial steel building completes the pre functional conditions, pipeline installation, wall decoration and component installation in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of secondary decoration.
1. Variability
The construction quality problems of commercial steel building will continue to evolve and change with external changes and the extension of time, and quality defects will gradually manifest. For example, the welds of steel components cause cracks in the welds that did not originally have cracks due to changes in stress: delayed cracks can occur due to the activity of hydrogen in the welds after welding. In addition, if the component is subjected to long-term overload, the steel component will be bent and deformed under the arch, which will cause hidden dangers.
2. Frequent
When faced with the relatively unfamiliar construction and construction techniques of steel structures, managers and technicians engaged in construction must be very careful and trained before they can take up their posts.
Knowing this, do you also want to order a commercial steel building? Qingdao Xinguangzheng Steel Structure Co., Ltd., which has been a Chinese pioneer in commercial steel building for many years. Their skilled staff can use the best solution for anything, particularly when a custom product is required.
The components or parts are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large factories, venues, super high-rise buildings and other fields. The steel structure is easy to rust. Generally, the Steel building accessories shall be derusted, galvanized or coated, and shall be maintained regularly.
For maintenance personnel, the daily maintenance of Steel building accessories should first be the maintenance of the surface coating of the components. The maintenance of the coating directly affects the service life of the steel structure. Therefore, to do a good job in daily maintenance, you should start with the following points:
1. The surface of the steel structure must be kept clean and dry, and the places where the steel structure is easy to accumulate dust (such as the steel column foot and the gusset plate) should be cleaned regularly.
2. Regularly check the integrity of the protective coating of Steel building accessories. If one of the following occurs, it should be maintained in time:
1) It is found that the area of the coating surface loses its luster to 90%;
2) The area of roughness, weathering and dry cracking of the coating surface reaches 25%;
3) The paint film bulges in the coating and the slightly rusted area of the components reaches 40%;
3. The steel structure parts affected by high temperature and high temperature should be equipped with protective plates to protect the coating from high temperature damage.
4. Try to avoid contact of Steel building accessories with corrosive substances, and clean up those that have been in contact.
1. According to the principles of production applicability, reliable performance, safe use, and convenient operation, a variety of Steel building accessories should be selected reasonably.
2. The inspection and measurement equipment should ensure the unity, accuracy and reliability of the value transmission. Various measuring tools such as steel tape, board, square, level, spring force gauge and so on used in the construction shall be verified before storage to ensure that the measuring instruments entering the construction site are qualified. The tools used in the construction shall be checked regularly . Ensure that each tool always meets the measurement accuracy requirements in the same project.
Steel building accessories must weld the cracks between the two drill holes. During welding, the edges of the cracks can be gas-cut into different types of grooves according to the thickness of the component to ensure the quality of the welding. When the thickness is less than 6mm, use 1 shape (that is, without beveling); when the thickness is greater than 6mm and less than 14mm, use the V-shaped bevel; when the thickness is greater than 14mm, you need to use the X-shaped bevel.
As technology advances, Steel building accessories are increasingly used in everyday life. Qingdao Xinguangzheng Steel Structure Co., Ltd. is known for high precision Steel building accessories. And you can connect them.
Introduction of Zhongjie era Steel Structure Frame Overpass Project
Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.
After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.
The project of steel structure hangar for African market constructed by Xinguangzheng Group has been completed smoothly. The Niger hangar project need comprehensive consideration, and a severer designing demand. The client has also a higher requirement for the portal.
Given the strictly demand for portal, Xinguangzheng has offered the most specialized blue print as well as installation services, and has finished the project excellently. We have thus gained our clients' trust and support.
Xinguangzheng will continuously seek for technical breakthroughs and new products, offer integrated settlements, and provide our clients with best products and best services, to give our clients more happiness.
Steel building accessories include steel components such as steel wall trusses, steel trusses, steel windshields, steel roof trusses, steel beams, steel columns, steel supports, etc.; specific requirements are corresponding to the quota sub-items, which are calculated separately, and different sub-items are set.
What are the advantages of using Steel building accessories to build houses?
What are the common Steel building accessories on the market?
Why do Steel building accessories need to be fireproofed?
1. The total weight of the building using Steel building accessories is light, which is about half of the concrete structure. At the same time, it can greatly reduce the foundation cost of the house.
2。 The construction speed of Steel building accessories is fast, and the construction period is at least one third shorter than that of the traditional residential system. A 1000 square meter building can be completed in only 20 days and five workers.
3. The house with Steel building accessories has good environmental protection effect. This is because the consumption of sand, stone and ash is greatly reduced during the construction of the residential buildings built by Steel building accessories. The materials used are mainly green, 100% recycled or degraded materials. When the buildings are demolished, most of the materials can be reused or degraded without causing garbage.
4. Steel building accessories is welcomed by everyone for its flexibility and abundance. Large bay design, indoor space can be divided by multiple schemes, which can meet the different needs of users.
5. The use of Steel building accessories meets the requirements of housing industrialization and sustainable development. The steel structure is suitable for mass production in the factory with a high degree of industrialization. It can integrate advanced finished products such as energy saving, waterproof, heat insulation, doors and windows, and apply them in a complete set, integrating design, production and construction, so as to improve the level of construction industry.
1. u-shaped bracket
The u-shaped bracket is also one of the important accessories of Steel building accessories. The bracket is used for the connection between the ground and the main material. In addition to the fixing function, the u-shaped bracket can also balance the overall bearing force.
2. Fishing rod bracket
The fishing rod bracket of the steel structure frame is a single-unit fixing device accessory, which is used for the initial fixing of the single-unit room.
The temperature resistance of steel is poor, and many of its properties change with the rise and fall of temperature. When the temperature reaches between 430-540℃, the yield point, tensile strength and elastic modulus of the steel will drop sharply, and the load-bearing capacity will be lost. Steel building accessories must be maintained with refractory materials.
Qingdao Xinguangzheng Steel Structure Co., Ltd., as a Chinese pioneer in producing Steel building accessories, can ensure the products’ quality and the after-sales service
Pictures for Prefab Metal Workshop Steel Structure Construction Workshop House in Costa Rica
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients,we will supply different designs and steel products.In order to give you an exactly quotation and drawings, please let us know the following informations. We will quote for you promptly.
Basic design requirements of steel structure warehouse
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.
Cheap prefab structural steel warehouse prefabricated outdoor storage shed building design price steel structure warehouse
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.