Prefab house is a structure mainly made of steel, which is one of the main building structure types. The characteristics of steel are high strength, light weight, and high rigidity, so it is especially suitable for the construction of large-span, super-high and super-heavy buildings.
Compared with traditional concrete buildings, what are the advantages of Prefab house?
What are the advantages of Prefab house?
What is the installation process of Prefab house?
Compared with prefabricated concrete buildings, Prefab houses have the following advantages:
1. There is no on-site cast-in-place node, the installation speed is faster, and the construction quality is easier to be guaranteed;
2. The steel structure is a ductile material with better seismic performance;
3. Compared with concrete structure, steel structure has lighter weight and lower foundation cost;
4. The steel structure is a recyclable material, which is more green and environmentally friendly;
5. Well-designed steel structure prefabricated buildings are more economical than prefabricated concrete buildings.
6. The cross-section of beams and columns is smaller, and more usable area can be obtained.
Save heating costs
Prefab house is more energy-efficient and environmentally friendly when used in the home, such as a new type of thermal insulation layer that has a better thermal insulation effect. When a household measurement is implemented and the heating has the same temperature, the room temperature of the "assembled" space is higher. The head of household may consider lowering the heating temperature, saving heating costs and, at the same time, reducing energy consumption.
Save energy
Finished house is of great benefit for energy saving and environmental protection. Through factory production and on-site assembly, it can significantly reduce building protection and waste water, reduce building noise, reduce harmful gas and dust emissions and reduce building and management personnel on site.
The assembly procedure for the steel construction of the Prefab house: steel column assembly -Installation of the supports between the columns -temporary installation of the steel bearer -roof bearings, roof bearings -correction and fixing of the steel bearer -Installation of the maintenance structure.
1. Contamination protection: Avoid rain water entering the metal roof from the outside. Rainwater enters the metal roof mainly through overlapping joints or knots. In order to achieve the function of the centrifuge, it is necessary to use a sealing disc at the screw connection and to make a concealed fixation. Use sealants or welds on the top of the plate. Best use a long board to remove the overlap. Close water-tight treatment for bleeding.
2. Moisture resistant: Avoid condensation of water vapour in the soil and metal wax layer and drain the water vapour in the metal wax layer. The solution is to fill the metal roof with thermal insulation cotton, place a waterproof membrane on the metal floor plate and have ventilated knots on the metal roof.
3. Daylight: Improve indoor lighting during the day by means of skylights and save energy. When installing daylight panels or daylight glass at certain points on the metal roof, the duration of use of the daylight should be aligned with the metal ceiling panel and the connection between the daylight and the metal ceiling panel should be treated watertight.
Seeing this, do you also want to order an Prefab House? If necessary, you can contact Qingdao Xinguangzheng Steel Structure Co., Ltd. they will provide the Prefab House of the best quality.
Mexico galvanized prefab steel layer house building with cages Project
Project address: Mexico
Area: 120m * 16m * 7m
Detailed parameters: Hot-dipped galvanized steel beam, steel column with zinc thickness 100um. Purlins are 275g/m² zinc which
life span can reach 15-20 years.The reasonable design of the feeding regulator ensures the regulator move stably, and the birds will not run away and get stuck.
Steel building accessories has the advantages of overall light weight, saving foundation, less materials, low cost, short construction period, large span, safety and reliability, beautiful appearance and stable structure. Steel structure workshop is widely used in construction industries such as long-span industrial workshop, warehouse, cold storage, high-rise building, office building, multi-storey parking lot and residential house.
How to use the machine to remove the rust spots on the surface of Steel building accessories?
What are the main Steel building accessories?
How to remove the rust spots on the surface of Steel building accessories?
For Steel building accessories that have been used for a period of time, there are inevitably some attachments on the surface, such as rust, dirt, dust, old paint film, etc. Before painting the surface of Steel building accessories, if these attachments are not completely removed, although they can be temporarily covered after painting, they play a role of isolation, which makes the coating and the component substrate bond If the strength is severely reduced, the paint film will fall off prematurely, which will eventually reduce the corrosion resistance of the surface coating and fail to play the protective role of the coating. Therefore, before painting the surface of the component, the attachments on the surface of Steel building accessories should be thoroughly cleaned.
In order to improve the quality of rust removal and work efficiency. To improve the working conditions of construction workers, the current Steel building accessories derusting work has adopted a large number of wind-driven or electric small equipment. The main rust removal methods using equipment are:
(1) Angle grinder: This small pneumatic equipment is mainly used to clean flat areas. It can use sandpaper, grinding wheels and wire brushes as needed.
(2) Needle Bundle Derusting Machine: This kind of small pneumatic equipment is generally equipped with 30-40 needle bundles, which can be adjusted with different working surfaces, which are mainly suitable for curved, narrow, uneven and cracked places.
(3) Single-head cold air gun: This small pneumatic equipment is also called zinc knocking. It uses the impact of the knocking head to remove rust. The diameter of the shovel head is generally 25-40mm, and it can impact 1000 to 6000 times per minute. Suitable for relatively narrow places.
1. Two-hole connection accessories
One of the main accessories of Steel building accessories is the double-hole connection accessory, which is mainly used to connect with the corners. The corners on both sides of the right-angle connection can reduce the pressure on the alloy. At the same time, the recesses of the building materials can be based on the aluminum alloy frame.
2. Single hole connector
Steel building accessories also has an important accessory, the single-hole connector, which has a completely different function from the double-pipe connector. It is mainly used for the affinity connection between the aluminum alloy frame and the ground in the ground installation. Therefore, the single-hole connector has The role of anchor bolts.
The Steel building accessories have been widely used in daily life and industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. can provide the best Steel building accessories for their customers.
Steel structure workshop is composed of frame, beam, wall and weighing column, etc. In the design of single-layer steel structure workshop, the first thing to ensure that the structure of the workshop does not affect the use of the second in the design time to calculate the bearing force of the beam, the selection of materials to meet the relevant standards.
Composition of single-layer steel structure workshop:
1. Transverse frame: composed of columns and the roof truss or roof beam supported by it, it is the main load-bearing system of the steel structure of single-storey workshop. It bears the dead weight of the structure, the wind and snow loads and the vertical and horizontal loads of the crane, and transfers these loads to the foundation.
2. Roof structure: structural system bearing roof load, including transverse frame beam, bracket, middle roof frame, skylight frame, purlin and so on.
3. Support system: including the support of the roof part and the support between columns. On the one hand, it forms the longitudinal frame of the steel structure of the single-storey workshop with columns and crane beams to bear the longitudinal horizontal load; On the other hand, the main load-bearing system is connected by individual plane structure into the whole structure of space, so as to ensure the necessary stiffness and stability of the steel structure of the single-storey workshop.
4. Crane beam and brake beam (or brake truss) : mainly bear the vertical and horizontal load of the crane, and transfer the load to the transverse frame and longitudinal frame.
5. Wall frame: Bear the dead weight and wind load of the wall.
Single-layer steel structure plant design points:
1. In the column network arrangement of single-storey steel structure buildings, when column spacing is not equal, especially the column spacing of each longitudinal column column, the columns should be arranged on the common horizontal positioning axis to ensure the stiffness requirements of the workshop, so that the workshop can be used normally.
2. For the temperature expansion joint section length of single-storey steel structure building, it is better to set the expansion joint when the plant structure exceeds the designed value under special circumstances. This has the advantage of being separated into independent structures, making temperature changes negligible after a drop.
3. The transverse frame calculation of single-storey steel structure building. The transverse frame structure transfers the load and action of the plant structure to the foundation, which is the main load-bearing structure of the plant.
4. Calculation of longitudinal force transmission system of single-storey steel structure building, steel column, column.
Qingdao Xinguangzheng steel structure group is a leading manufacture in China. With 25 years experience, we have confidence to provide you the highest cost performance.
The light steel structure of commercial steel building is a structure composed of steel materials, and each component or part is connected by welding, bolts or rivets.
commercial steel building is mainly used for low-rise or multi-storey buildings: the prefabricated wall panels are transported to the construction site by special vehicles, hoisted by cranes, connected with the foundation by anchor bolts and connectors, and the wall panels are connected by screws and connectors, and then the light steel floor is installed. The light steel floor is composed of floor beams, profiled steel plates Steel wire mesh and concrete. The construction of the main structure can be completed by constructing the upper floor according to the construction method of one floor and finally installing the roof. The system is applicable to buildings with 6 floors and below. It has the advantages of high assembly rate, short construction cycle, earthquake resistance and typhoon resistance, thermal insulation, large use area in the sleeve, no exposed beams and columns, and recyclable materials.
1. The construction period is short. The construction period of commercial steel building can be shortened by more than 50%;
2. The project quality is stable. The quality of parts and components produced in commercial steel building factory is more stable, which solves many common quality problems of on-site construction technology and human errors in on-site construction, and ensures the project quality;
3. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
4. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. commercial steel building completes the pre functional conditions, pipeline installation, wall decoration and component installation in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of secondary decoration.
1. Variability
The construction quality problems of commercial steel building will continue to evolve and change with external changes and the extension of time, and quality defects will gradually manifest. For example, the welds of steel components cause cracks in the welds that did not originally have cracks due to changes in stress: delayed cracks can occur due to the activity of hydrogen in the welds after welding. In addition, if the component is subjected to long-term overload, the steel component will be bent and deformed under the arch, which will cause hidden dangers.
2. Frequent
When faced with the relatively unfamiliar construction and construction techniques of steel structures, managers and technicians engaged in construction must be very careful and trained before they can take up their posts.
Knowing this, do you also want to order a commercial steel building? Qingdao Xinguangzheng Steel Structure Co., Ltd., which has been a Chinese pioneer in commercial steel building for many years. Their skilled staff can use the best solution for anything, particularly when a custom product is required.
Step 1: Cutting
Cut steel plate into pieces and connections by flame cutting machines (CNC, Semi-automatic flame cutting machines). Long strips will be used as web and flange plate, connections will be used as connected, reinforced or stiffening plate.
Step 2: Assembly
Combine web and flange plate together through H-beams assembly machine, make tack welding. Keep the web plate in the middle line, do not be off the center line.
Step 3: Gantry automatic submerged arc welding
Make welding by gantry submerged arc welding machine. Make sure the welding sequence and reduce the welding deformation.
Step 4: Flange plate of straightening
Start straightening on welding-finished H steel beams by straightening machine.
Step 5: Connections process
Make holes on connected pieces by drilling machines. Make sure the hole size and precision.
Step 6: Welding
Welding with CO2. Make sure the weld quality without welding flaw.
Step 7: Shot blasting
Make shot blasting on steel profiles. Make sure the blasting grade and quality.
Step 8: Spray painting
Painting or other anti-corrosion surface treatment.
Step 9: Package & Loading
Pack steel structure profiles on steel pallet, which will be easy for loading, transportation and unloading jobs.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Prefab House refers to the use of industrial production methods to build houses, that is, the stairs, exterior walls, balconies, air-conditioning panels, etc. of the house are all prefabricated in the factory outside the construction site, and then shipped to the construction site for "assembly", and the interior of the house will be refined at one time. Handed over after renovation. That is, the huge external walls, stairs, and balconies from the factory are "assembled" on the construction site into houses and buildings.
What are the advantages of a Prefab House?
What are the structural types of Prefab Houses?
What should we be careful about when selecting a Prefab House?
1. Safe and reliable
The Prefab House with steel as the main building material has a high capacity per volume unit, is more stable and solid than the traditional brick and brick concrete technology, has a better seismic performance, wind resistance, water density and refractory performance and also has thermal insulation and sound protection functions. Steel has good ductility and can better use the energy brought in by earthquakes, so it has good seismic performance and a high structural security t hat guarantees the safety of stay.
2. Easy construction and short construction time
All components are prefabricated in the factory and only have to be installed on site, which greatly shortens the construction cycle. A 6000-square-metre-long building can basically be installed in 40 days.
1. Structural system
The structure of the Prefab House can be divided into: steel frame system, steel frame support system, steel frame-core tube system, steel frame-module-core tube system and steel frame-shear-wall system. With the continuous development of the technology, newer steel construction systems will also appear.
2. Peripheral protection system
The outer protective system of the Prefab House can be divided into blocks, plates, cans and other types.
3. Internal system
Traditional construction has many disadvantages. For example, the traditional rough decoration method does not separate the interior system and the structural system, which makes it difficult to adapt to the modern development of the housing industry; the house technology lines are not separated and the water and power lines are buried in the support layer, which the "century residence" cannot realize." The waste of social resources is serious.
1.The costs are relatively higher than in the traditional Prefab House made of brick concrete and concrete.
2. The steel structure of the Prefab House, with its unique steel structure, walls, roofs and other materials, as well as the standardized and final internal distribution and support facilities, is difficult to adapt to the habits of people "arbitrarily handling the house".
3. Corrosion of steel: Al-galvanized steel must be used for maximum corrosion protection and the main steel structure can reach fifty years.
4. There are many requirements for new materials. The structure of steel houses is equipped with materials such as thermal insulation and heat protection, usually using new lightweight materials.
Prefab Houses produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. feature attractive appearance, excellent performance, user-friendly operation, easy maintenance, and internationally advanced performance indicators, and are exported to more than 10 countries and regions.