Introduction of Ethiopian Prefabricated steel structural water bottling processing workshop
Located: Ethiopia
Construction area: 2000㎡
Cladding: 0.5mm galvanized sheet (No insolution)
XGZ provide design,fabrication and installation guidance as client's required.
Company information of Ethiopian Prefabricated steel structural water bottling processing workshop
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one
hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global
valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Introduction of Zhongjie era Steel Structure Frame Overpass Project
Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.
After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.
The components or parts are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large factories, venues, super high-rise buildings and other fields. The steel structure is easy to rust. Generally, the Steel building accessories shall be derusted, galvanized or coated, and shall be maintained regularly.
For maintenance personnel, the daily maintenance of Steel building accessories should first be the maintenance of the surface coating of the components. The maintenance of the coating directly affects the service life of the steel structure. Therefore, to do a good job in daily maintenance, you should start with the following points:
1. The surface of the steel structure must be kept clean and dry, and the places where the steel structure is easy to accumulate dust (such as the steel column foot and the gusset plate) should be cleaned regularly.
2. Regularly check the integrity of the protective coating of Steel building accessories. If one of the following occurs, it should be maintained in time:
1) It is found that the area of the coating surface loses its luster to 90%;
2) The area of roughness, weathering and dry cracking of the coating surface reaches 25%;
3) The paint film bulges in the coating and the slightly rusted area of the components reaches 40%;
3. The steel structure parts affected by high temperature and high temperature should be equipped with protective plates to protect the coating from high temperature damage.
4. Try to avoid contact of Steel building accessories with corrosive substances, and clean up those that have been in contact.
1. According to the principles of production applicability, reliable performance, safe use, and convenient operation, a variety of Steel building accessories should be selected reasonably.
2. The inspection and measurement equipment should ensure the unity, accuracy and reliability of the value transmission. Various measuring tools such as steel tape, board, square, level, spring force gauge and so on used in the construction shall be verified before storage to ensure that the measuring instruments entering the construction site are qualified. The tools used in the construction shall be checked regularly . Ensure that each tool always meets the measurement accuracy requirements in the same project.
Steel building accessories must weld the cracks between the two drill holes. During welding, the edges of the cracks can be gas-cut into different types of grooves according to the thickness of the component to ensure the quality of the welding. When the thickness is less than 6mm, use 1 shape (that is, without beveling); when the thickness is greater than 6mm and less than 14mm, use the V-shaped bevel; when the thickness is greater than 14mm, you need to use the X-shaped bevel.
As technology advances, Steel building accessories are increasingly used in everyday life. Qingdao Xinguangzheng Steel Structure Co., Ltd. is known for high precision Steel building accessories. And you can connect them.
Introduction for Low Price Construction Material Steel Structure Showroom Building Metal Mall Design
Aruba exhibition hall project is a renewal project of Aruba stadium customers, with a building area of 1585 square meters. The exhibition hall is a two-story frame structure, and the warehouse is a portal steel frame structure. Some walls of the exhibition hall are made of glass curtain wall and others. The storehouse is made of cement foam board, and the roof is a polyurethane composite board.
Project location: Aruba
Area: 1585 square meters
Span: 127m
Eaves height: 8.4m
Number of floors: 2
Wind speed: 148km / h
Shapes: Framing
Steel consumption: 92t
Name | Low Price Construction Material Steel Structure Workshop Building Metal Factory Shed Design |
Material | Q235B,Q345B galvanized or painted steel |
Main frame | H-section steel column and steel beam |
Purlin | C/ Z- section steel purlin |
Roof and wall | a) Color-coated corrugated steel sheet, |
Door | a)Rolling up door, |
Window | PVC /Steel or Aluminum Alloy frame window |
Down spout | Round PVC pipe |
Usage | All kinds of industrial workshop, warehouse, poultry shed, supermarket, hangar, etc |
Service life | 50Years |
Detail Information
Roof with a single layer of galvanized steel plate sea blue crown Island, its structure and technical requirements are as follows:
1.V820 type 0.50mm thick galvanized roof panel (sea blue) crown Island
2.75mm thick glass wool with aluminum foil
3.200 * 200 coated steel mesh
4.Q235B C-type steel roof purlin
5.Q345B steel beam
Wall:
1.YX-840 plate type 0.40mm thick galvanized wall panel white gray crown Island
2.Q235B C steel wall purlins
3.Q345B steel column
Paint coating:
1. Shot blasting, rust level Sa2.5
2. In the gray anti-corrosion primer two, each 30 um
Other:
1. Roof panel - sea blue
2. Wall panel - white gray
3. Steel components - medium gray
Specification
Project address: Argentina
Area: 5930m2
Time: 2009
Introduction: the project covers a total area of 5930 square meters, with three attached spans in the main workshop and eight two ton cranes. The construction started in October 2009, and the project site is not suitable for canuelas in North Aires, Argentina. It took more than two months to complete, and the project is in good condition at present.
We supply designing, manufacturing and installationabout the whole steel structure workshop building project.
Detail Information
Roof with a single layer of galvanized steel plate sea blue crown Island, its structure and technical requirements are as follows:
1.V820 type 0.50mm thick galvanized roof panel (sea blue) crown Island
2.75mm thick glass wool with aluminum foil
3.200 * 200 coated steel mesh
4.Q235B C-type steel roof purlin
5.Q345B steel beam
Wall:
1.YX-840 plate type 0.40mm thick galvanized wall panel white gray crown Island
2.Q235B C steel wall purlins
3.Q345B steel column
Paint coating:
1. Shot blasting, rust level Sa2.5
2. In the gray anti-corrosion primer two, each 30 um
other:
1. Roof panel - sea blue
2. Wall panel - white gray
3. Steel components - medium gray
Commercial steel building, the preferred steel and metal building in construction, has quickly become the first choice for residential and commercial building safety. Here we are going to talk more about the Commercial steel building !
What are the advantages of Commercial steel building?
Why do more and more people choose Commercial steel building?
What are the advantages of Commercial steel building?
In this field of commercial construction, Commercial steel building has greatly exceeded the normal construction capabilities of its competitors.
Because Commercial steel building has a quality guarantee of up to 40 years, the steel structure of the building is durable.
For the daily maintenance of wall panels, roofs and metal buildings, steel structure owners may pay a huge price for this, because steel structure houses are more resistant to wear and tear than other materials every day.
Commercial steel building is safe in extreme weather. When your country/region is under extreme climatic conditions, such as earthquakes, tornadoes, ice storms, or just a strong thunderstorm, this Commercial steel building is proven to be more resistant than others because it is made of steel .
Because of this, government agencies and municipalities always choose Commercial steel building to protect their most important property from severe weather.
Because of this, more and more residential customers choose to use steel to build their houses for maximum protection.
With a steel structure, you can have many advantages, such as economy, beauty and reliability.
In addition to these eye-catching features, Commercial steel building also has great flexibility for customers who want to configure ideal buildings to meet their precise requirements and satisfy their aesthetics.
Compared with other buildings, customized Commercial steel buildings and residences provide users with more versatility, and metal buildings are also a very economical choice for new buildings.
The steel structure of Commercial steel building has a series of advantages, such as high strength, light weight, good seismic performance, high degree of industrialization, fast construction speed, small floor area and so on. Steel has good mechanical processing performance, which is most easy to realize modular, standardized, industrialized, assembled and mechanized production of buildings, realize no fire, no water, no dust and no garbage on the construction site, have good recycling of steel, and most easy to realize the concept of full-life green building. Due to the strong plasticity of steel structure, it can be widely used in civil buildings, public buildings and commercial buildings. Such fields as industrial plants, low rise, multi-storey and super high-rise buildings, civil residences, large public buildings, terminal buildings, thermal power plants and boiler steel frames, highway and railway bridges and offshore oil platforms.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is a Commercial steel building manufacturer established for more than several years. Please consult our company for details through https://www.steelstructureonline.com/! Customer requirements are our pursuit.
Agricultural steel building has low cost, short construction time, and less pollution. Therefore, it has become the best choice for new-style construction.
Structural parts: material, surface roughness, tolerance, surface treatment, straightness (or radian)
Connection: hole position deviation, bolt grade; welding method, welding standard, welding material; air tightness, non-destructive testing, liquid penetration testing, etc. are required
Overall structure: verticality, horizontality, etc.
Packaging: packaging materials, packaging methods
Storage: ambient temperature, ambient humidity
Transportation: loading and unloading, placing in vehicles, placing in containers, etc.
Fire protection technology. One of the most critical issues in agricultural steel building is the application of fire protection technology. The fire resistance rating of light steel structure houses is level 4. For light steel structure residential buildings, fire-resistant gypsum boards are pasted on both sides of the wall and the ceiling of the floor. For ordinary firewalls and household walls, 25.4 mm thick (1 inch) gypsum boards are used to protect them to meet the 1-hour fire protection requirement. The glass fiber filled between the wall columns and the floor joists also plays an active role in protecting fire and heat transfer.
Sound insulation technology. The agricultural steel building is filled with glass wool between the inner and outer walls and the floor joists, which effectively prevents the audio part transmitted through the air. For the impact sound transmitted through the solid, the following construction is performed: the partition wall is composed of two wall columns. There are two walls with intermediate spaces; for the small keel used to fix the gypsum board for the suspended ceiling, an elastic structure with small cut grooves is used to effectively reduce the transmission of structure-borne sound between floors.
If an agricultural steel building is damaged, we must immediately recognise and remedy the problem. The main factors of steel structural damage are:
(1) the structural viability of agricultural steel buildings is insufficient due to changes in load, overdue service and changes in rules and regulations;
2) The components of agricultural steelworks are deformed, twisted, damaged, deformed, etc., due to various accidents; which results in a weakening of the cross-section of the component, a twisting of the rod and a tearing of the connection;
(3) deformation, cracking and retardation of agricultural steel components or connections due to temperature differences;
4) The agricultural steel structure corrodes due to the erosion of chemical substances and electrochemical corrosion leads to a weakening of the cross-section of the steel structure;
5) Other include errors in design, production, construction and illegal use and operation during the service period.
There are three main technical reinforcement measures for agricultural steel construction:
1) Cross-section defences: Apply the element locally or over the entire length of the element with steel and connect it to a whole to carry the force together;
2) Change the calculation diagram: add additional supports, adjust load distribution, reduce cutting force level, force displacement of static indefinite structural support and reduce peak voltage;
3) Pre-tensioned cable method: use high-strength cables to strengthen the weak links of the structure or to improve the overall durability, stiffness and stability of the structure.