How much do you know about the Agricultural steel building?
When you consider the building materials used in a new construction project, you will feel uneasy. In fact, by choosing steel (rather than wood, stone, brick, etc.), you have already taken the first step to ensure that the completed project produces the best results. Steel is attractive because of its unparalleled strength-to-weight ratio, ductility, price, aesthetics, and consistency of composition from the beginning. There are more and more applications of agricultural steel building in agricultural production. Let’s take a look below.
What is the significance of the development of agricultural steel building?
How to set the power supply in agricultural steel building?
What are the components of the agricultural steel building organization?
What is the significance of the development of agricultural steel building?
The economic benefits of the development of agricultural steel building are good. First of all, the entire building does not require beams and bars, and the cost is only two-thirds of the light steel structure, and the larger the span, the lower the cost. In addition, the construction of agricultural steel building can greatly shorten the construction period, and the daily construction area can reach 1000m, which greatly saves the construction of machinery and labor costs.
The social effect of the development of agricultural steel building is significant. The construction period of modern large-scale projects is closely linked to economic benefits. Because we have adopted agricultural steel building development, the construction of the project is completed ahead of schedule, which creates good conditions for agricultural production units to put into use in advance, and the social effect is significant.
How to set the power supply in agricultural steel building?
1. The main distribution box in the agricultural steel building should be installed near the power source, and the distribution box should be installed near the electrical equipment or power-using area.
2. The distribution box in the agricultural steel building is made of iron plate.
3. The distribution box in the agricultural steel building should be equipped with a working neutral terminal board and a protective neutral terminal board.
4. The metal box, metal base and shell must be protected and connected to zero. The distribution box must be protected from rain and moisture. There must be a secondary leakage protector in the distribution box, and each electrical equipment should have its own dedicated switch box, which must implement "one machine, one switch, one leakage, one box", equipment and lighting are disconnected, all power distribution The boxes are all equipped with doors and locks, and a dedicated person is responsible for keeping them, and a regular inspection and maintenance system is implemented.
What are the components of the agricultural steel building organization?
(1) Structure made of cold-formed thin-walled steel;
(2) Structure made of hot-rolled light section steel;
(3) Structure composed of welded and high-frequency welded lightweight steel;
(4) Structure made of round tube, square tube, rectangular tube, etc.;
(5) Structure made of components welded from thin steel plates;
(6) The structure made by the combination of the above various components.
Qingdao Xinguangzheng Steel Structure Co., Ltd.. has been committed to providing customers with agricultural steel buildings and perfect after-sales service so that customers can invest easily, use them with confidence, and have no worries.
Industrial steel building mainly refers to that the main load-bearing components are composed of steel. Including steel column, steel beam, steel structure foundation, steel roof truss (of course, the span of the plant is relatively large, and they are basically steel structure roof truss now), steel roof. Note that the wall of steel structure can also be maintained by brick wall.
What should be taken into account in the day-to-day maintenance of industrial steel buildings?
What are the arrangements for the planning of industrial steel buildings?
What should be taken into account when selecting industrial steel building?
After the installation of our industrial steel building, the owner is not allowed to change its structure privately, not to remove screws and other parts, and not to increase or reduce the partition wall. If you need to change a part, you need to negotiate with the manufacturer. It is up to the manufacturer to decide whether it can be changed. After approximately three years of use, the steel structure must be maintained with colour to give the building beauty and safety. industrial steel buildings are connected by steel construction components, so electrical devices such as wires should be insulated by cable channels in order to avoid accidents involving electric shocks.
The maintenance of industrial steel buildings is closely linked to the durability of the steel structure. That is why the industry pays enough attention to it. If you have problems with maintenance and maintenance, you should contact a professional steel construction manufacturer for help.
1. Insurance: Avoid rain water from the outside entering the metal roof of the industrial steel building. Rainwater enters the metal roof mainly through overlapping joints or knots. In order to achieve the function of the centrifuge, it is necessary to use a sealing disc at the screw connection and to make a concealed fixation. Use sealants or welds on the top of the plate. Best use a long board to remove the overlap. Close water-tight treatment for bleeding.
2. Fire protection: The metal material does not burn in the event of fire and the flame does not penetrate the metal roof plate.
3. Wind pressure resistance: industrial steel building can withstand the maximum local wind pressure and the metal roof plate is not removed by negative wind pressure. The wind resistance depends on the strength of the metal roof plate and the fixing seat and the density of the fixing seat.
Sound protection: industrial steel building prevents sound transmission from the outside to the inside or from the inside to the outside. Fill the metal sheet with sound insulation material (mostly insulated cotton) and the sound insulation effect is expressed by the sound intensity difference on both sides of the metal sheet. The sound insulation effect depends on the density and thickness of the sound insulating agent. Note that sound insulating agents have different locking effects on sounds of different frequencies.
After reading these words, do you also want to order an industrial steel building? If necessary, you can contact Qingdao Xinguangzheng Steel Structure Co., Ltd., which is an advanced industrial steel manufacturer.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Introduction of Qingdao Jiaodong International Steel Structure Building Airport
Qingdao Jiaodong International Airport (comprehensive transportation center and parking building) project is constructed by open cut method. The buried depth of the structure bottom is about 2.5m, and the wall wrapping surface is about 3.5m * 0.85m.
The column is made of Φ 850 * 25 / φ 700 * 16 straight seam concrete-filled steel tubular column, and the upper and lower columns are welded by variable diameter (φ 850 ~ φ 700). The total height is about 30 meters, and the total weight is about 20 tons. It is transported to the construction site in 17m + 13m sections. Each steel pipe column is made of 25 mm or 16 mm thick steel plate.
Factory processing assembly with an error of ± 2mm to meet the requirements, the construction site using a 250t crane for installation.
Generally speaking, Steel building accessories include: steel column systems, steel beam systems, support systems, connection systems, purlin systems, and brace stairs. This is a part and an indispensable part of every steel structure project.
What are the advantages of using Steel building accessories?
How to paint Steel building accessories?
What may cause the deformation of Steel building accessories?
1. Health
In the process of using Steel building accessories, dry construction is used to reduce the environmental pollution caused by waste. The Steel building accessories of the house can be 100% recycled, and most of other supporting materials can also be recycled, which is in line with the current awareness of environmental protection; All materials are green building materials, which meet the requirements of ecological environment and are conducive to health.
2. Comfort
The wall is built by Steel building accessories, and the high-efficiency energy-saving system is adopted, which has breathing function and can adjust the dry humidity of indoor air; The roof has ventilation function, which can form a flowing air room over the house to ensure the ventilation and heat dissipation requirements inside the roof.
3. Fast
All dry operations shall be carried out without being affected by environmental seasons. A building of about 300 square meters only needs 5 workers and 30 working days to complete the whole process from foundation to decoration.
4. Environmental protection
Materials can be 100% recycled, truly green and pollution-free.
5. Energy saving
All adopt high-efficiency and energy-saving walls, with good thermal insulation, heat insulation and sound insulation effects, which can reach the energy-saving standard of 50%.
(1) Method of painting construction:
There are two commonly used methods in Steel building accessories maintenance engineering, namely, painting method and spraying method.
(2) Matters needing attention:
1) The base layer should be thoroughly cleaned before painting, and kept dry, and the first coat of primer should be applied as soon as possible within no more than 8h.
2) When applying the primer, choose an appropriate painting method according to the size of the area.
3) When painting the top coat, it should be painted according to the color and variety requirements of the design, and the painting method is the same as the primer painting method.
4) Painting environment
5) The thinner should be used correctly.
(1) The actual dynamic load of Steel building accessories exceeds the maximum load (commonly known as "overload") allowed during the design of the steel structure.
(2) Bearing the impact of dynamic load for a long time.
(3) The impact of natural disasters (such as earthquakes) or uneven settlement of foundations.
(4) Improper use and maintenance or breakage of Steel building accessories due to mechanical damage and withdrawal from work, resulting in an abnormal deformation of the steel structure due to unbalanced forces.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is known for high precision Steel building accessories. And you can connect them.
The main material of commercial steel building is light steel keel synthesized from hot-dip galvanized steel strip through cold rolling technology. After accurate calculation and support and combination of auxiliary parts, it has reasonable bearing capacity and can replace traditional houses.
What are the progress of commercial steel building?
What is the future development of commercial steel building?
What are the necessary steps in the commercial steel building construction process?
1. The house has good safety performance. commercial steel building is anti-seismic, anti-typhoon, fire-proof and anti-insect and ants. The service life of the main building body can reach 90 years, the overall performance is good, it is not easy to be destroyed by earthquake force, and the building quality and safety performance are better.
2. The house is low-carbon, energy-saving, green and environmentally friendly, and can be reused. The steel of commercial steel building can be recycled and has little impact on the environment during construction and dismantling. Most of the other supporting materials can also be recycled, which meets the requirements of environmental protection; moreover, most of the materials are green building materials, which can meet the requirements of the ecological environment and are beneficial to health.
The steel structure used in commercial steel building will continue to develop into high-strength steel, which will greatly increase its yield point strength; in addition, new types of steel must be rolled, such as H-shaped steel (also known as wide flange steel) and T-shaped steel and profiled Steel plates, etc. to meet the needs of large-span structures and super high-rise buildings.
Steel structure is divided into light steel and heavy steel. There is no uniform standard for judging, and many experienced designers or project managers often cannot fully explain. They can be comprehensively considered and judged based on some data.
1. Purge device
This device uses a high-pressure fan, and multiple sets of elastic blowing nozzles with different angles are arranged in the auxiliary chamber of the chamber to blow and clean the projectiles remaining on the surface of the workpiece.
2. Import and export sealing
The inlet and outlet sealing devices of the workpiece are all made of rubber spring steel plate. In order to prevent the projectile from splashing out of the cleaning room during shot blasting, there are multiple reinforced seals at the inlet and outlet of the workpiece, which are characterized by strong elasticity, long life, and sealing effect. Superb.
3. Dust removal system
The dust removal system is mainly composed of a bag filter, a fan, and a dust removal pipeline. The dust removal efficiency can reach 99.5%.
This is the relevant knowledge about the commercial steel building for you to get more information about it. If you want to order a commercial steel building, you must choose Qingdao Xinguangzheng Steel Structure Co., Ltd., because they can provide the commercial steel building with most high-quality and suitable price.
Project Area: 25000 sqm
Project Detail:
Xinguangzheng Prefabricated Steel Sports Stadium is single span maximum fish belly type box beam, the maximum span is 50 meters.
The maximum weights of a single piece is 109.5 tons
The web height of the maximum box member is 3.6 meters and the wing width is 0.9 meter.
The maximum thickness of the wing plate is 70m.
Project Spotlight:
The overall performance is a horn shape with great tension, and the architecturat form is landsccape architecture.
The roof of the building is full of greening, integrating the building with the park
The building is equipped with children's natatorium, basketball court, gym, study, culturalcenter and so on.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.