











Steel building accessories is an ideal elastic body with good homogeneity and isotropy, which is most in line with the basic assumptions of general engineering mechanics; The material has good plasticity and toughness, can have large deformation, and can well bear dynamic load; Short construction period; It has a high degree of industrialization and can carry out professional production with a high degree of mechanization.
What are the Steel building accessories we often need?
What are the materials of Steel building accessories?
What should the construction personnel of Steel building accessories pay attention to?
1. Ceiling connection accessories
Ceiling connection accessories are also one of the important accessories of Steel building accessories. It is suitable for fixing accessories between the wall and ceiling connection accessories in the ceiling installation method. The ceiling connection accessories can be divided into different types according to the cable length and type. Different parts of the unit are used.
2. Branch chain plate accessories
Regardless of the installation method, the branch chain plate accessory is one of the necessary accessories, because it needs to connect the steel structure horizontally. This is the secondary reinforcement of the aluminum alloy frame. At the same time, straight chain plate accessories can also be used. To the role of integration and optimization.
1. Purchasing materials according to Steel building accessories design drawings. Steel materials, profiled steel plates, welding materials, high-strength bolts, insulation materials and other materials must meet the specifications, varieties, and performance required by the design, and have a material certificate. Welding electrodes, welding wires, fluxes, etc. should match the base metal. Make re-inspection records for the imported materials as required, and keep track of the use of main materials.
2. The steel is stored in a dry and dedicated place, and it is not allowed to store it in the open air.
3. For steel surface damage, after grinding and trimming, the local thickness reduction should not be greater than the rolling thickness tolerance.
4. Welding electrodes, wires, and fluxes should meet the relevant technical requirements of the current national standard and be compatible with the strength of the main metal.
1. Special procedures with complex technology, high difficulty and high precision should be completed by skilled and experienced personnel.
2. All types of welders engaged in structural production must pass the examination and obtain a certificate issued by the national agency accreditation department. The certificate indicates the content of welding and the expiration date.
3. The non-destructive testing personnel who check the quality of the welds shall hold the corresponding level range testing qualification certificate.
4. All positions personnel should hold a certificate to work.
Knowing this, do you also need to order Steel building accessories? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Steel building accessories with high quality for all customers from all over the world.
Industrial steel building is easy to move and recycle without pollution. These are stronger than traditional workshops, and the walls of the steel structure workshops can also be filled with bricks, which are completely load-bearing. All future plant constructions will be steel structure plants. Here we are going to introduce the steps of installing Industrial steel building.
What are the raw materials used in industrial steel building?
What is the main installation process of industrial steel building?
What is the production and installation process of industrial steel building?
In addition to iron and carbon, the raw materials of industrial steel building also contain other elements. Divided into permanent elements; occasional elements; hidden elements and alloying elements. The common elements are manganese, silicon, sulfur, and phosphorus. Incidental elements are due to the different origins of ore (there are intergrowth ore mixed with iron) and scrap steel as raw materials, such as copper, titanium, vanadium, rare earth elements, etc., are brought into steel during smelting and process operations. The cryptic elements refer to non-metal elements with a small atomic radius, such as oxygen and hydrogen. Alloying elements refer to elements specially added to change the composition, such as chromium, nickel, tungsten, molybdenum, vanadium, etc.
Carbon steel (referred to as carbon steel) is an iron-carbon alloy with a carbon content of more than 0.0218% and less than 2.11%. Because carbon steel has good mechanical properties and process properties, and is large in output and low in price, it is a metal material that is widely used in mechanical engineering. However, carbon steel also has some shortcomings, such as low hardening energy, poor temper softening resistance, and low yield ratio. The strength potential of carbon steel cannot be fully utilized even after heat treatment. In order to meet the continuous development of modern industry and science and technology, alloy steel was developed.
Foundation → production and installation foundation is divided into (foundation ground survey → foundation excavation → embedded screws → foundation casting → later foundation grouting → outdoor water dispersion → outdoor drainage ditch (some factory design indoor drainage ditch or cable ditch suggestion Completed simultaneously with installation)→Enclosure masonry→tiling tiles, etc.)
The production and installation are divided into (processing production→component painting→structural pre-assembly→steel component hoisting→main structure adjustment→purlin installation→door and window column installation→gutter downpipe installation→steel component painting (some are fireproof, some are Anti-corrosion, according to design requirements) → roof panel (some with steel mesh, some with insulation layer, completed at the same time) → wall panel installation → door and window installation → water supply and drainage installation → electrical equipment installation)
Qingdao Xinguangzheng Steel Structure Co., Ltd., as a Chinese pioneer in producing Industrial steel buildings, can ensure the products’ quality and the after-sales service.
The light steel structure of commercial steel building is a structure composed of steel materials, and each component or part is connected by welding, bolts or rivets.
commercial steel building is mainly used for low-rise or multi-storey buildings: the prefabricated wall panels are transported to the construction site by special vehicles, hoisted by cranes, connected with the foundation by anchor bolts and connectors, and the wall panels are connected by screws and connectors, and then the light steel floor is installed. The light steel floor is composed of floor beams, profiled steel plates Steel wire mesh and concrete. The construction of the main structure can be completed by constructing the upper floor according to the construction method of one floor and finally installing the roof. The system is applicable to buildings with 6 floors and below. It has the advantages of high assembly rate, short construction cycle, earthquake resistance and typhoon resistance, thermal insulation, large use area in the sleeve, no exposed beams and columns, and recyclable materials.
1. The construction period is short. The construction period of commercial steel building can be shortened by more than 50%;
2. The project quality is stable. The quality of parts and components produced in commercial steel building factory is more stable, which solves many common quality problems of on-site construction technology and human errors in on-site construction, and ensures the project quality;
3. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
4. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. commercial steel building completes the pre functional conditions, pipeline installation, wall decoration and component installation in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of secondary decoration.
1. Variability
The construction quality problems of commercial steel building will continue to evolve and change with external changes and the extension of time, and quality defects will gradually manifest. For example, the welds of steel components cause cracks in the welds that did not originally have cracks due to changes in stress: delayed cracks can occur due to the activity of hydrogen in the welds after welding. In addition, if the component is subjected to long-term overload, the steel component will be bent and deformed under the arch, which will cause hidden dangers.
2. Frequent
When faced with the relatively unfamiliar construction and construction techniques of steel structures, managers and technicians engaged in construction must be very careful and trained before they can take up their posts.
Knowing this, do you also want to order a commercial steel building? Qingdao Xinguangzheng Steel Structure Co., Ltd., which has been a Chinese pioneer in commercial steel building for many years. Their skilled staff can use the best solution for anything, particularly when a custom product is required.
What is the purpose of isolation?
The purpose of isolation is to cut off the route of transmission in the infection chain,protect susceptible persons, and ultimately control or eliminate the source of infection.
Therefore, it is an important measure to prevent the spread of infectious diseases.
From a medical point of view, the goal of "isolation" is to prevent the spread of infection and ultimately eliminate or control the source of infection.
That is to prevent and limit the infectious factors of infected patients directly
or indirectly to susceptible persons,
or to those who may pass on such factors to others, and at the same time, enable infected patients to receive timely treatment under control and return to health as soon as possible.
Why choose container house?
In the construction field, it is called an assembled modular container house, also known as a container building or a container house.
It is a single room as a prefabricated unit.
The external wall panels and interior decoration of each unit are shipped to the factory after completion.
A building structure to be installed on site.
Compared with the traditional building structure, the container house has the following advantages:
(1) Convenient transportation, installation and movement, flexible combination;
(2) The cost is low and it can be completed quickly;
(3) The house can be recycled, and no construction waste is generated during use;
(4) The interior is completely renovated and can be used immediately.
Admittedly, it is precisely because of the advantages of rapid assembly and baggage check-in that the container house can be delivered to the Huoshenshan (Fire God Mountain) hospital within 10 days.
The main material of commercial steel building is light steel keel synthesized from hot-dip galvanized steel strip through cold rolling technology. After accurate calculation and support and combination of auxiliary parts, it has reasonable bearing capacity and can replace traditional houses.
What are the progress of commercial steel building?
What is the future development of commercial steel building?
What are the necessary steps in the commercial steel building construction process?
1. The house has good safety performance. commercial steel building is anti-seismic, anti-typhoon, fire-proof and anti-insect and ants. The service life of the main building body can reach 90 years, the overall performance is good, it is not easy to be destroyed by earthquake force, and the building quality and safety performance are better.
2. The house is low-carbon, energy-saving, green and environmentally friendly, and can be reused. The steel of commercial steel building can be recycled and has little impact on the environment during construction and dismantling. Most of the other supporting materials can also be recycled, which meets the requirements of environmental protection; moreover, most of the materials are green building materials, which can meet the requirements of the ecological environment and are beneficial to health.
The steel structure used in commercial steel building will continue to develop into high-strength steel, which will greatly increase its yield point strength; in addition, new types of steel must be rolled, such as H-shaped steel (also known as wide flange steel) and T-shaped steel and profiled Steel plates, etc. to meet the needs of large-span structures and super high-rise buildings.
Steel structure is divided into light steel and heavy steel. There is no uniform standard for judging, and many experienced designers or project managers often cannot fully explain. They can be comprehensively considered and judged based on some data.
1. Purge device
This device uses a high-pressure fan, and multiple sets of elastic blowing nozzles with different angles are arranged in the auxiliary chamber of the chamber to blow and clean the projectiles remaining on the surface of the workpiece.
2. Import and export sealing
The inlet and outlet sealing devices of the workpiece are all made of rubber spring steel plate. In order to prevent the projectile from splashing out of the cleaning room during shot blasting, there are multiple reinforced seals at the inlet and outlet of the workpiece, which are characterized by strong elasticity, long life, and sealing effect. Superb.
3. Dust removal system
The dust removal system is mainly composed of a bag filter, a fan, and a dust removal pipeline. The dust removal efficiency can reach 99.5%.
This is the relevant knowledge about the commercial steel building for you to get more information about it. If you want to order a commercial steel building, you must choose Qingdao Xinguangzheng Steel Structure Co., Ltd., because they can provide the commercial steel building with most high-quality and suitable price.
Nowadays, more and more industrial parks prefer to build workshop, warehouse, office and other buildings by steel structures. Why are steel structures so popular with the public? It is mainly due to the four excellent functions of steel structure "light, fast, good properties and economical".
1. Light: The steel structure has the characteristics of light weight and excellent stress function.
Steel has the smallest ratio of density to strength compared with concrete and wood. For example, the weight of steel roof trusses is only 30% or even 25% of the same concrete roof truss under the same load and strength conditions. The weight of the steel structure house is about 50% of the reinforced concrete house, but the usable area is about 4% higher than that of the reinforced concrete house.
2. Fast.
The steel structure is prefabricated in the factory then bolts contacted installation on site. It has the characteristics of mass production of large pieces and high-level precision of finished products, which effectively shorten the construction period and reducing the cost to give high investment returen. Compared with the construction period of reinforced concrete structure engineering, the steel structure is only 1/3 to 1/2 of the reinforced concrete structure under the same conditions .
3. Good properties: The steel structure has good properties and high reliability.
Steel has uniform of texture, isotropy, large elastic modulus, good plasticity ,good resistance and is an ideal elastic plastic body. Therefore, the steel structure will not suddenly break due to occasional overloading or partial overloading, it can adapt to the oscillating load, and the calculation model can reflect the mechanical properties of the steel well, so the analysis is accurate and reliable.
4.Economical.
The cost of steel structure is higher than concrete structure from the raw materials only, but the construction speed of steel structure is about 50% faster than concrete structure, which will save a lot of time and cost. The steel structure is more than 50% lighter than the overall weight of the concrete structure house, so that the cost of basic treatment and transportation will be reduced. Building is a systematic project includes many items, such as planning, manufacturing, transportation, installation, maintenance and management. Therefore, from the overall point of view, the steel structure is more cost saving.
A lot of work is needed to promote and improve the design specifications and construction technical standards of different types of structures, and to develop new types of lightweight insulation wall materials and the supporting issues of residential components. At the same time, it is necessary to widely publicize the advantages of the development of Residential steel building, so that more developers, designers and users can understand and understand steel structure housing.
What are the main forms of Residential steel building?
What are the structural characteristics of these Residential steel buildings?
What should I pay attention to when using Residential steel building?
Judging from the Residential steel building that has been built, the king has:
1) Thin-walled steel composite wall panel form;
2) Pure frame form;
3) Frame support form;
4) Form of steel-concrete combination;
5) Steel frame-concrete seismic wall form and so on.
The structural forms of Residential steel building have their own characteristics. Among them, the thin-walled steel composite wall panel is particularly suitable for finalized products. The Residential steel building system evolved from the wall panel structure, that is, the thin-walled steel column members are arranged at a distance of about 600mm. The vertical load-bearing structure and section steel have a support system to resist horizontal forces. The floor slab is arranged as a multi-rib support structure according to the position of the vertical section steel. Because the upper structure is a wall-like structure, the foundation is set as a strip foundation according to the force. The foundation requirements are not high.
The thin-walled steel composite wallboard residence is affected by the dense structure, and there are certain restrictions on the size of the partitions, door, door and window openings, and pick-out components.
The latter several forms of Residential steel building can meet the design requirements of multi-story residential buildings, but there is a common problem from the perspective of use, that is, the impact of the prominent beams and columns on the interior look and feel of the residence.
Compared with other buildings, Residential steel building has its particularity. Offices and workshops can use a relatively fixed column network, and the storey height is also higher. The space occupied by the beams and columns is suitable for people. The rules of the column network are conducive to the beams. Layout. On the contrary, the residence is a product with many changes. According to the requirements of the building, a regular column network is rarely arranged. The interior space of the house is relatively small and changes a lot, which is not conducive to the layout of the steel frame.
After seeing this and learning so much information about residential steel structures, I believe you must also want to order a Residential steel building. Qingdao Xinguangzheng Steel Structure Co., Ltd. can provide the best Residential steel building you need. At the same time, their after-sales service is also very considerate.
1. The positioning axis and supporting surface elevation of the foundation are out of tolerance:
The positioning axis of the foundation and the elevation of the supporting steel cylinder exceed the allowable deviation.
The reasons are as follows:
There are errors and deviations in foundation survey control network, foundation survey setting out and elevation finding.
The foundation formwork is not firmly set up, the pouring concrete blanking is too high, and the concrete is vibrated and impacted, which makes the formwork displacement and causes the datum line deviation.
Or the use of steel ruler, theodolite, level without calibration, there are errors.
Or construction wrong drawings, axis wrong, without strict inspection.
Or if the foundation bearing surface is not plastered and leveled twice, the concrete will shrink and sink.
Or the embedded steel plate (or support) is not fixed.
Because the foundation positioning axis and bearing surface are out of tolerance, the column installation axis and bearing elevation will be out of tolerance, which will affect the quality of the whole structural steel construction installation project.
Avoiding measures:
(1) The accuracy of basic survey control network, instruments and measuring tools used for basic survey setting out and leveling shall be accurate. Before use, they must be checked or verified by the measurement department. If problems are found, they shall be adjusted in time to prevent errors or accumulated errors, resulting in axis and elevation exceeding the allowable deviation.
(2) The foundation formwork for steel structure construction must be firmly supported with sufficient strength and rigidity. When pouring concrete, cutting and vibrating, it is necessary to prevent from striking the formwork and causing displacement. In the process of concrete pouring, the positioning axis and elevation shall be checked regularly with measuring tools or suspension lines. If any deviation is found, the pouring and vibration shall be stopped, and the work shall be carried out after reinforcement and adjustment. Before the final setting of concrete, the surface of foundation concrete shall be plastered and leveled twice. For the embedded steel plate or bearing, the elevation and levelness shall be aligned twice, and the concrete at the bottom shall be dense. The steel plate or support of foundation support column shall be provided with necessary fixing devices to ensure correct position and elevation.
(3) When the elevation and levelness of the steel plate or support on the vertical and horizontal axis of the foundation and column bearing surface are out of tolerance, measures shall be taken according to the degree of deviation. When the out of tolerance is not serious, it can be solved by shifting the column base, reaming and packing the base plate. If the deviation is serious and cannot be adjusted, it should be studied with relevant departments to work out a feasible correction scheme before treatment.
2. Foundation anchor bolt thread damage:
The foundation anchor bolt thread is damaged, and the nut cannot be screwed and tightened during the column installation.
The causes of bolt thread damage are as follows:
Anchor bolts are impacted or improperly kept during transportation, loading and unpacking, resulting in serious thread corrosion.
Or the bolts were not protected after burying and were damaged by outside.
Or the bolt is used as electric welding zero line on site, and the thread is damaged due to arc burn.
Or the bolt is used as the binding point of the pulling force of the traction rope.
Due to the damage of bolt thread, it is impossible to screw in nuts to fasten steel columns and other components, which affects the transmission and stability of structural force.
Avoiding measures:
(1) When the anchor bolts are transported, packed and unpacked, the thread protection shall be strengthened. After being smeared with industrial vaseline oil, they shall be wrapped and bound with plastic film to prevent thread damage and corrosion. And should be stored separately, should not be mixed with other parts and components, so as to avoid mutual impact damage thread.
(2) After the anchor bolt is embedded, it shall not be used as the fulcrum of bending processing, the neutral line of electric welding machine, or the binding point of traction force. When lifting components, proper operation shall be carried out to prevent the thread from being damaged by horizontal lateral impact force.
(3) The screw thread of the bolt has been damaged, and the following treatment methods can be adopted: when the damaged length of the screw thread does not exceed its effective length, the steel file can be used to trim the screw thread, so as to smoothly screw in the nut. When the length of thread damage of local foot bolt exceeds the specified effective length, the length of original thread section can be cut by gas cutting; Then, with the same material and specification as the original bolt, one end of the bolt is processed into thread, and the butt end section is made into 30º-- 45º. After butt welding with the lower end of the groove, the corresponding diameter specification and length of the steel casing sleeve into the joint, welding reinforcement. After casing reinforcement for steel work in construction, the diameter of the bolt will be larger than that of the base plate, which can be solved by appropriately enlarging the diameter of the base plate.
3. The setting of mortar base plate of column base does not meet the requirements:
The mortar base plate of column base is set randomly, and the elevation, levelness and position do not meet the design and specification requirements.
The reasons are as follows:
The surface of the foundation is not treated and leveled, so that the base plate can not bear the force smoothly, and the surface is uneven and uneven;
The base plate is not reasonably arranged according to the stress requirements, so that the base, base plate and foundation can not bear uniform pressure, so that the settlement of base slurry is uneven, and the elevation and levelness can not meet the requirements.
If the setting of open base plate does not meet the requirements, it can not transfer the load evenly, which will reduce the mechanical performance of the column and affect the stability of the superstructure.
Avoiding measures:
(1) In order to make the base plate group transmit the force to the foundation smoothly, the base plate should be closely combined with the base slurry on the foundation surface. The uneven foundation surface shall be chiseled and leveled.
(2) The location and distribution of the base plate should be correct. Generally, according to the stress area of the steel column base plate, the base plate, the base plate and the foundation should be arranged in the center of the steel plate and the stress concentration position on both sides or near the two sides of the anchor bolt, so that the base plate, the base plate and the foundation can fully bear the pressure load, and bear the force uniformly together to avoid partial bias Concentrated stress or deformation of the base plate occurs when the anchor bolts are tightened.
(3) The area of the base plate directly bearing the load should meet the needs of the stress, which should be determined by calculation, and the area should not be too large or too small. Too large will cause waste, too small will cause local concentrated overload of foundation and affect the overall and uniform stress of foundation. The thickness of the base plate is generally within the range of 4 ~ 25 mm, each group is no more than 3 pieces. The base plate has a 10 ~ 12 mm thick steel plate, the length of the base plate is 100 ~ 300 mm, and the width is 50 ~ 120 mm. When setting the mortar, use non shrinkage cement mortar with strength not lower than 30MPa. As the steel column is mainly installed with cushion plate to adjust the elevation and levelness, the elevation and levelness shall be found when grouting, and the allowable deviation shall comply with the specification, and the supervision shall be strengthened. Before the base plate is grouted, the rust, oil stain and burr on the surface of the base plate shall be cleaned, so that the base plate can be firmly combined with the concrete when grouted and grouted; The length of the base plate group exposed to the outside of the base plate edge is about 10 ~ 20 mm.
4. Before the installation of steel column, the foundation is directly installed without inspection:
Before the installation of steel column, the axis and elevation of the foundation, the position and elevation of the anchor bolt and the concrete quality of the foundation are not checked in advance, so the installation is carried out directly. In this way, there may be out of tolerance without repair, which will cause structural installation difficulties, increase the steel column installation stress and affect the installation accuracy, and even cause quality hazards.
Avoiding measures:
Before the installation of steel column, the positioning control line, foundation axis, elevation, anchor bolt position, elevation and concrete quality of foundation shall be pre checked. If the deviation is found, measures shall be taken to correct and adjust to the allowable deviation range of the specification. For elevation inspection, the measured data shall be compared with the pre inspection data of steel column size and elevation, and the error of the two shall be eliminated when the support base slurry pad or anchor bolt nut is adjusted. The allowable deviation of foundation support surface, anchor bolt position and base slurry pad shall meet the requirements of the specification. The quality of foundation concrete shall be dealt with in accordance with relevant regulations.
5. Don't check the dimension of steel members, deal with deformation and quality defects before installation
Before the installation of the structure, the external dimensions of the steel members are not checked, and the deformation and quality defects of the members are handled.
Although the steel components have passed the quality inspection before they are processed in the factory, they may fail to be inspected, or new deformation and damage may occur in the transportation and stacking of the components. If the review is not carried out before the installation, these problems can not be dealt with in time before the installation, which will affect the installation quality of the steel structure and cause installation difficulties or permanent quality defects.
Avoiding measures:
Before the installation of steel members, the steel members shall be carefully checked in advance:
It includes checking the model and quantity of the component, the overall dimension of the component, the relevant dimensions between the supporting surfaces and the installation holes, and marking the datum line of the axis of the component. Check whether the component is deformed, and correct and repair the deformation error if there is any.
Whether the connecting plate, splint and other accessories of the component are complete and whether the position and size are accurate. Inspect whether the surface quality of the welding area of the component and the friction surface of the high-strength bolt connection meet the requirements and whether it is polluted.
Whether the member nodes are complete and whether the center of gravity of main components is marked.
Whether the surface of the component is polluted, whether the paint falls off, etc.
Pre inspection records of components shall be made; For the components with deformation and defects exceeding the allowable deviation, they shall be corrected and repaired on the ground before installation, and can be installed after they are qualified.
6. The perpendicularity of steel column installation is out of tolerance:
The verticality deviation of steel column exceeds the allowable value in design or code
When the steel column is manufactured, the deformation control measures are not taken or the bending deformation is not straightened.
Or the length of the column is large, the rigidity is poor, and the elastic or plastic deformation occurs under the action of external force.
Or due to the unreasonable hoisting technology and procedure, the roof panel is bent and deformed under the action of temperature, wind and external force.
Or there is deviation in the span size of the roof truss, the external force is used to force the connection during the installation, resulting in the over deviation of the verticality of the steel column.
This will lead to the deflection of the steel column and affect the bearing capacity and stability.
Avoiding measures:
(1) Anti deformation measures shall be taken for assembly and welding of steel column, and the deformation during fabrication shall be corrected in time. When transporting and stacking steel columns, the supporting points should be appropriate to prevent bending deformation under the action of self weight. The out of plane stiffness of long column is poor, so the lifting point should be selected at 2 / 3 of the total length of the column to prevent deformation. If the span size of steel roof truss exceeds the deviation, it should be corrected before installation to prevent forced connection and bending deformation of column body.
(2) When the steel column is hoisted to the foundation plane in place, the vertical and horizontal axis above the column base plate should be aligned with the foundation line, so as to prevent the deviation of span size, which will lead to the horizontal tension or thrust when the column head is installed and connected with the roof truss, so as to make the column body bending and deformation, and carry out appropriate control.
(3) When the roof slab is hoisted after the connection and installation of the steel column and the tail-stock, it should be carried out symmetrically and synchronously from the edge of the two slopes in the center of the top chord to the middle, so as to prevent the bending deformation of the steel column caused by the lateral concentrated pressure generated by the one slope. Without the permission of the design, the steel column and other connected components shall not be used for horizontal dragging or vertical hoisting of heavy components and equipment, and the column bending deformation or damage to the connecting structure shall be prevented.
(4) If the bending steel column is elastic deformation, it can be restored to its original state after the external pressure is removed; If it is plastic deformation, it can be corrected by adding temporary support above or at the top of the bending part of the steel column before correction, so as to reduce the load-bearing gravity, and then fixing one side reaction frame at the bending part, and using jack for correction. If the rigidity of the steel column is large, it can be corrected by heating the bending convex surface with oxyacetylene flame, and then applying jacking force.
7. Steel column installation height is out of tolerance:
Height dimension or relative position of steel column after installation (±) The elevation dimension is out of tolerance, which makes the difference between the total height of each column and the height deviation of the bracket.
The reasons are as follows
Foundation elevation is incorrect or deviation occurs.
The length and dimension of steel column during the production stage are out of tolerance.
Or when the foundation elevation is adjusted and treated during installation, it is not combined with the actual length (height) of steel column, which will cause the positive or negative difference of the height dimension or elevation dimension of the steel column after installation.
Because of the over tolerance, it is difficult to install and adjust the components connected with it, which makes it difficult to correct and takes time.
Avoiding measures:
(1) During the foundation construction, the elevation size should be strictly controlled to ensure the accuracy of elevation. The elevation dimension of the upper surface of the foundation shall be adjusted according to the actual length of the steel column or the elevation dimension of the bracket supporting surface, so as to make it consistent with the height and elevation dimension of the steel column after installation.
(2) During the manufacturing process of steel column, the length and size (including the total length and the length of each position specified in the design, the length and size within the allowable positive and negative deviation range, and the positive excess value not allowed) and the correct size of the total length and bracket of the steel column without contact point shall be strictly controlled. The latter can be adopted to weld the column body first, and the column base plate and column head plate shall not be welded temporarily, In case of out of tolerance, adjust before welding the base plate or upper column head plate of the column, and finally weld the base plate and column head plate of the column.