Agricultural steel building has low cost, short construction time, and less pollution. Therefore, it has become the best choice for new-style construction.
Structural parts: material, surface roughness, tolerance, surface treatment, straightness (or radian)
Connection: hole position deviation, bolt grade; welding method, welding standard, welding material; air tightness, non-destructive testing, liquid penetration testing, etc. are required
Overall structure: verticality, horizontality, etc.
Packaging: packaging materials, packaging methods
Storage: ambient temperature, ambient humidity
Transportation: loading and unloading, placing in vehicles, placing in containers, etc.
Fire protection technology. One of the most critical issues in agricultural steel building is the application of fire protection technology. The fire resistance rating of light steel structure houses is level 4. For light steel structure residential buildings, fire-resistant gypsum boards are pasted on both sides of the wall and the ceiling of the floor. For ordinary firewalls and household walls, 25.4 mm thick (1 inch) gypsum boards are used to protect them to meet the 1-hour fire protection requirement. The glass fiber filled between the wall columns and the floor joists also plays an active role in protecting fire and heat transfer.
Sound insulation technology. The agricultural steel building is filled with glass wool between the inner and outer walls and the floor joists, which effectively prevents the audio part transmitted through the air. For the impact sound transmitted through the solid, the following construction is performed: the partition wall is composed of two wall columns. There are two walls with intermediate spaces; for the small keel used to fix the gypsum board for the suspended ceiling, an elastic structure with small cut grooves is used to effectively reduce the transmission of structure-borne sound between floors.
If an agricultural steel building is damaged, we must immediately recognise and remedy the problem. The main factors of steel structural damage are:
(1) the structural viability of agricultural steel buildings is insufficient due to changes in load, overdue service and changes in rules and regulations;
2) The components of agricultural steelworks are deformed, twisted, damaged, deformed, etc., due to various accidents; which results in a weakening of the cross-section of the component, a twisting of the rod and a tearing of the connection;
(3) deformation, cracking and retardation of agricultural steel components or connections due to temperature differences;
4) The agricultural steel structure corrodes due to the erosion of chemical substances and electrochemical corrosion leads to a weakening of the cross-section of the steel structure;
5) Other include errors in design, production, construction and illegal use and operation during the service period.
There are three main technical reinforcement measures for agricultural steel construction:
1) Cross-section defences: Apply the element locally or over the entire length of the element with steel and connect it to a whole to carry the force together;
2) Change the calculation diagram: add additional supports, adjust load distribution, reduce cutting force level, force displacement of static indefinite structural support and reduce peak voltage;
3) Pre-tensioned cable method: use high-strength cables to strengthen the weak links of the structure or to improve the overall durability, stiffness and stability of the structure.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been developing agricultural steel buildings for many years, and is known as "the national brand leader in the Chinesesteel building industry". Therefore, customers can choose their products with confidence.
Plant Introduction of Sri Lanka Prefabricated Steel Structure Material for Power Plant
Project Brief Description: Lakvijaya power plant, the largest power plant in Sri Lanka, is the company that undertakes the steel structure materials of wind barrier project. Designed and fabricated by Qingdao Xinguangzheng Steel Structure Co., Ltd. in 2019.
Qingdao Xinguangzheng steel structure Group is a public company with 1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.
The advantages of industrial steel building are high seismic performance, good fire resistance, short construction period, and durability. Compared with traditional factory buildings, industrial steel building has improved a lot, so it is strongly welcomed by the market.
What are the types of single-structure industrial steel building?
What are the advantages of single-structure industrial steel building?
What are the advantages of industrial steel building construction?
1. From the height:
The height of the drip level of a single-storey factory building is very important. Some factory buildings are 4-5 meters high, some are 6-7 meters, and some can be as high as 11-12 meters or higher. Generally, the taller the factory building, the more difficult it will be to build, and the more expensive the material costs will be.
2. From the external building structure:
Simple iron sheet: It is the simplest, a factory built with iron sheet relatively freely.
Steel structure workshop: The steel structure workshop is divided into steel structure or ordinary steel structure. Color steel structure is more than ordinary
much better.
Concrete structure: The wall is built with bricks and the roof is sealed with concrete. This structure has better safety and heat insulation than the previous two.
3. From the internal structure:
It is divided into those with corbels and those without corbels. Only the workshops with corbels can install cranes (also called cranes). This is an important part of industrial production. If there are machinery and equipment to install cranes, just Must have corbels to use.
industrial steel building has the characteristics of forming a large space for use, easily meeting the requirements of the production process, and convenient internal transportation organization, which is conducive to the placement of heavier production equipment and products, and can realize the industrialization of the production of plant building components and the mechanization of on-site construction. Therefore, industrial steel building has been widely used in industrial buildings such as metallurgy, machinery manufacturing, motor manufacturing, chemical and textile industries. Common structural forms of reinforced concrete single-story factory buildings include bent frame structure and rigid frame structure.
1. industrial steel building has good structural performance, light weight, high strength, and good seismic performance.
2. The steel used in industrial steel building is recyclable, which is more energy-efficient and environmentally friendly than masonry and concrete.
3. The industrial steel building is processed by the factory, so the quality of the industrial steel building is guaranteed.
4. industrial steel building materials have light weight and low base cost.
5. The on-site construction period of industrial steel building is short. There is basically no wet work on site, and no dust, sewage and other pollution will be generated.
6. The cross-section of structural components is small, the pillars are very thin, the walls are very thin, and the building area is large.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been committed to providing customers with reliable industrial steel buildings and perfect after-sales service so that customers can invest easily, use them with confidence, and have no worries.
Industrial steel building is easy to move and recycle without pollution. These are stronger than traditional workshops, and the walls of the steel structure workshops can also be filled with bricks, which are completely load-bearing. All future plant constructions will be steel structure plants. Here we are going to introduce the steps of installing Industrial steel building.
What are the raw materials used in industrial steel building?
What is the main installation process of industrial steel building?
What is the production and installation process of industrial steel building?
In addition to iron and carbon, the raw materials of industrial steel building also contain other elements. Divided into permanent elements; occasional elements; hidden elements and alloying elements. The common elements are manganese, silicon, sulfur, and phosphorus. Incidental elements are due to the different origins of ore (there are intergrowth ore mixed with iron) and scrap steel as raw materials, such as copper, titanium, vanadium, rare earth elements, etc., are brought into steel during smelting and process operations. The cryptic elements refer to non-metal elements with a small atomic radius, such as oxygen and hydrogen. Alloying elements refer to elements specially added to change the composition, such as chromium, nickel, tungsten, molybdenum, vanadium, etc.
Carbon steel (referred to as carbon steel) is an iron-carbon alloy with a carbon content of more than 0.0218% and less than 2.11%. Because carbon steel has good mechanical properties and process properties, and is large in output and low in price, it is a metal material that is widely used in mechanical engineering. However, carbon steel also has some shortcomings, such as low hardening energy, poor temper softening resistance, and low yield ratio. The strength potential of carbon steel cannot be fully utilized even after heat treatment. In order to meet the continuous development of modern industry and science and technology, alloy steel was developed.
Foundation → production and installation foundation is divided into (foundation ground survey → foundation excavation → embedded screws → foundation casting → later foundation grouting → outdoor water dispersion → outdoor drainage ditch (some factory design indoor drainage ditch or cable ditch suggestion Completed simultaneously with installation)→Enclosure masonry→tiling tiles, etc.)
The production and installation are divided into (processing production→component painting→structural pre-assembly→steel component hoisting→main structure adjustment→purlin installation→door and window column installation→gutter downpipe installation→steel component painting (some are fireproof, some are Anti-corrosion, according to design requirements) → roof panel (some with steel mesh, some with insulation layer, completed at the same time) → wall panel installation → door and window installation → water supply and drainage installation → electrical equipment installation)
Qingdao Xinguangzheng Steel Structure Co., Ltd., as a Chinese pioneer in producing Industrial steel buildings, can ensure the products’ quality and the after-sales service.
Pictures for Prefab Metal Workshop Steel Structure Construction Workshop House in Costa Rica
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients,we will supply different designs and steel products.In order to give you an exactly quotation and drawings, please let us know the following informations. We will quote for you promptly.
Basic design requirements of steel structure warehouse
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.
Cheap prefab structural steel warehouse prefabricated outdoor storage shed building design price steel structure warehouse
Industrial steel building is a great invention. All components are prefabricated in the factory, and the site only needs to be assembled simply, thus greatly shortening the construction period. For a building of 6000 square meters, the basic installation can be completed in only 40 days.
What should I pay attention to when using Industrial steel building?
What are the reasons why Industrial steel building is used more and more widely?
What are the steps involved in the general process of Industrial steel building installation?
1. Industrial steel building construction has strict requirements for construction measurement. When the steel structure workshop stops the structural calculation, the mechanical model is very clear, and the size change has an obvious influence on the model. Therefore, during the manufacturing and installation stages, construction measurement is a more important issue. For example, inaccurate blanking will result in deformation of components; failure to be placed in place during installation will affect the load-bearing effect of the environmental characteristics of the construction site welding of steel structure workshops.
2. The steel of Industrial steel building has the characteristics of thermal expansion and contraction, and it is sensitive to weather, temperature and other conditions during the installation process. Industrial steel building welding has its own special technical requirements. In practice, when natural conditions cannot meet the work requirements, manual measures are often taken to create conditions for construction, such as preheating of welding rods and preheating and heating of steel plates. If the size of the steel structure factory building changes greatly during the construction process, the temperature is too high or too low will affect the accuracy of the device.
3. The Industrial steel building is easy to rust and has poor fire resistance, so it needs to be painted and maintained. Paint the steel structure factory building fireproof coating on the exterior of the Industrial steel building to play the role of fire protection and heat insulation maintenance, to prevent the steel from rapidly heating up in the fire and reducing its strength, and to prevent the steel structure factory building from losing its support ability and causing the building to collapse.
The grid structure of Industrial steel building has the advantages of reasonable stress, large stiffness, light weight, single member and convenient fabrication and installation. In recent years, it has been widely used in public and industrial buildings with large span and large column network. It can be used not only for roof structure, but also for floors, walls and special structures.
1. The main structure hoisting of Industrial steel building,
2. Secondary structure installation of Industrial steel building,
3. Installation of roof panel and insulation layer of Industrial steel building,
4. Wall maintenance and installation,
5. Finally, the detailed structure of Industrial steel building.
After reading this, have you also had the idea of ordering Industrial steel buildings. At Qingdao Xinguangzheng Steel Structure Co., Ltd., you can get the best quality Industrial steel buildings and the most intimate after-sales service.
The development of residential steel building conforms to the industrial technology policy of protecting arable land and saving energy, and is also one of the production methods for realizing residential industrialization. The development of steel structure housing is the general trend.
What is the layout of the residential steel building?
What issues should be paid attention to when designing residential steel building?
Why pay attention to the design of residential steel building?
residential steel building’s column grid layout should be regular, and it is advisable to use residential units or sleeves as the unit to achieve modularity. The modular flat connection, wrong connection and symmetrical concave (convex) connection and other splicing adapt to changes in the overall layout .
When the residential steel building module adopts small column net, it should be combined with the floor and pipeline design; when the module adopts large column net, the facility pipeline should be designed as a fixed-positioned tube bundle, and the electrical and communication lines can be along the cavity and skirting of the partition wall. , Mirror hanging line or top line arrangement.
The kitchen and bathroom are located close to the concrete core tube or concrete shear wall, and avoid steel structure load-bearing components to facilitate the fire prevention and anti-corrosion treatment of steel components.
Vertical pipelines are centrally arranged in pipeline wells or pipeline walls, or installed on site using factory prefabricated tube bundles.
The toilet is drained on the same floor. Use a double pipe system for centralized heating, and use a temperature control valve and a heat meter. Use the equipotential characteristics of the steel structure to make a natural ground connection.
residential steel building should be dominated by construction and design, and other professions should interact closely with each other. In addition to following the general principles of residential building design, residential steel building must also focus on solving:
(1) How to make use of the advantages of steel structure? The beam span can be enlarged, the bays can be more flexible, and more space can be created for residents. But how to avoid the flatness and monotonous facade of the building caused by the steel structure.
(2) It is necessary to solve the fire protection and anti-corrosion problems of steel structure residential buildings. Especially in rainy areas, the quality of anti-corrosion and anti-rust work directly affects the promotion of steel structure housing.
The cost of residential steel building is the most concerned issue of real estate developers. Steel structure residences should be positioned in middle and high-end residences. Steel structure residences are a systematic project. Management and coordination should be strengthened from design, manufacturing, transportation, installation, maintenance and management, so as to reduce costs and improve overall economic benefits. the goal of.
Qingdao Xinguangzheng Steel Structure Co., Ltd. strives to provide top-quality residential steel buildings with reasonable prices, efficient production time, and the most professional customer service.
Project Area: 23408 sqm
Project Usage:Pakistan Cola workshop
Project Location: Lahore, Pakistan
Project weight of steel structures: 760 tons.
Project Detail:
Wall & Roof:0.5mm galvanized steel sheet +50mm glass wool+0.4mm galvanized steel sheet.
Span: Multi-Span 100m and 50m
Total Height: 12m
Project picture of Pakistan Prefabricated Steel Structure Construction Cola Workshop :
Company information
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.