Project Area: 25000 sqm
Project Detail:
Xinguangzheng Prefabricated Steel Sports Stadium is single span maximum fish belly type box beam, the maximum span is 50 meters.
The maximum weights of a single piece is 109.5 tons
The web height of the maximum box member is 3.6 meters and the wing width is 0.9 meter.
The maximum thickness of the wing plate is 70m.
Project Spotlight:
The overall performance is a horn shape with great tension, and the architecturat form is landsccape architecture.
The roof of the building is full of greening, integrating the building with the park
The building is equipped with children's natatorium, basketball court, gym, study, culturalcenter and so on.
Prefab House only prefabricates some parts, and it must be poured in the same way as traditional buildings on the construction site. It is not "building blocks" as imagined. Therefore, no difference can be seen from the appearance of the house after it is built. Here we are going to introduce the Prefab House.
What are the reasons why people choose Prefab House?
What are the advantages of steel structure prefabricated houses?
What are the advantages of Prefab House for building plant?
1. Prefab House is of great benefit to energy conservation and environmental protection. Through factory production and on-site assembly construction, it can greatly reduce construction waste and construction sewage, reduce construction noise, reduce harmful gas and dust emissions, and reduce on-site construction and management personnel. Generally, it can save 20% of materials and about 60% of water.
2. The housing industrialization of Prefab House is not only beneficial to the capital flow of development enterprises, but can also increase the speed of housing listing, so it can greatly alleviate the current situation of insufficient market supply and adjust the supply relationship. After large-scale promotion, construction costs can be reduced, and it will also play a role in restraining housing prices.
3. Comprehensive cost accounting shows that the construction cost of Prefab House is higher than that of traditional construction methods, but after large-scale promotion, construction costs can be reduced.
First, the components of prefabricated houses can be industrialized in factories. The components are equivalent to standard products and can be installed directly after being transported to the site. It can be said to be convenient and fast. The construction field during the construction period, especially the unparalleled advantages.
prefabricated houses with steel structure are more stable than those made of welded frame steel. In addition, it is cheaper and more economical. Long service life, 50-70 years. Locked with bolts, it can be used repeatedly without any maintenance.
1. Large span: such Prefab House can realize single span or multi span, and the maximum span without center column is 36m.
2. Low cost: according to the requirements of customers, the unit price of Prefab House ranges from $150 / m2 to $300 / m2.
3. Convenient installation and short construction time: save manpower and cost for customers.
4. Prefab House has a long service life: up to 50 years
5. Environmental protection: such buildings are free of harmful substances.
6. Structural stability: earthquake resistance, wind resistance and snow resistance.
7. Others such as waterproof, heat insulation and energy saving.
The Prefab House produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. has been exported to several countries. And there are several offices in the country, which is convenient for domestic customers to maintain. Based on technological innovation, their company constantly improves product quality and provides you with professional Prefab House.
The main material of commercial steel building is light steel keel synthesized from hot-dip galvanized steel strip through cold rolling technology. After accurate calculation and support and combination of auxiliary parts, it has reasonable bearing capacity and can replace traditional houses.
What are the progress of commercial steel building?
What is the future development of commercial steel building?
What are the necessary steps in the commercial steel building construction process?
1. The house has good safety performance. commercial steel building is anti-seismic, anti-typhoon, fire-proof and anti-insect and ants. The service life of the main building body can reach 90 years, the overall performance is good, it is not easy to be destroyed by earthquake force, and the building quality and safety performance are better.
2. The house is low-carbon, energy-saving, green and environmentally friendly, and can be reused. The steel of commercial steel building can be recycled and has little impact on the environment during construction and dismantling. Most of the other supporting materials can also be recycled, which meets the requirements of environmental protection; moreover, most of the materials are green building materials, which can meet the requirements of the ecological environment and are beneficial to health.
The steel structure used in commercial steel building will continue to develop into high-strength steel, which will greatly increase its yield point strength; in addition, new types of steel must be rolled, such as H-shaped steel (also known as wide flange steel) and T-shaped steel and profiled Steel plates, etc. to meet the needs of large-span structures and super high-rise buildings.
Steel structure is divided into light steel and heavy steel. There is no uniform standard for judging, and many experienced designers or project managers often cannot fully explain. They can be comprehensively considered and judged based on some data.
1. Purge device
This device uses a high-pressure fan, and multiple sets of elastic blowing nozzles with different angles are arranged in the auxiliary chamber of the chamber to blow and clean the projectiles remaining on the surface of the workpiece.
2. Import and export sealing
The inlet and outlet sealing devices of the workpiece are all made of rubber spring steel plate. In order to prevent the projectile from splashing out of the cleaning room during shot blasting, there are multiple reinforced seals at the inlet and outlet of the workpiece, which are characterized by strong elasticity, long life, and sealing effect. Superb.
3. Dust removal system
The dust removal system is mainly composed of a bag filter, a fan, and a dust removal pipeline. The dust removal efficiency can reach 99.5%.
This is the relevant knowledge about the commercial steel building for you to get more information about it. If you want to order a commercial steel building, you must choose Qingdao Xinguangzheng Steel Structure Co., Ltd., because they can provide the commercial steel building with most high-quality and suitable price.
When commercial steel building is widely used, vigorously develop the choice of building energy saving and green building, which can promote the transformation of construction methods.
commercial steel building adopts an innovative building system that integrates industries such as standardized design, industrialized production, assembly construction, integrated decoration, and information management to bring users a safer, more comfortable, energy-saving, and environmentally friendly experience. At present, commercial steel building has been widely used and promoted in many fields such as small and medium office buildings, business clubs, and tourist reception centers, and has been praised and praised by users.
1. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
2. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. The functional conditions, pipeline installation, wall decoration and parts installation are completed in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of the secondary decoration of commercial steel building;
3. The appearance of commercial steel building is diverse, which can meet the requirements of organic integration of various buildings with regional characteristics, traditional culture and living habits. The designer's optimized design, reasonable spatial layout and beautiful architectural appearance make the living more comfortable.
1. Clean room
The cleaning chamber is a box-shaped welding structure of the type of a large chamber plate, the inner wall of the chamber is lined with a wear-resistant protective plate and the cleaning process is carried out in a sealed chamber.
2. Supporting role
It is divided into indoor winding and loading and unloading, which promotes rolling.
The highly chromed wear-resistant coat and the limiting ring are used for the indoor roller strip coat. The highly chromed wear-resistant coat is used to protect the roller tread and to withstand the impact of projectiles. The limiting ring can allow the workpiece to run at a predetermined position to prevent deviations and cause accidents.
3. Lifting gear
Mainly consisting of upper and lower gears, cylinders, belts, funnels, etc.
The upper and lower strap discs of the same diameter take the ribs, the wheel plate and the hub to form a polygonal structure to increase friction, avoid slipping and prolong the life of the belt.
For the repair and replacement of the funnel and the overlapping tape, the lifting eyepiece is bent in shape and the lid is opened at the middle housing of the lifting eyepiece. Open the cover at the bottom of the hoist to remove the blockage of the lower floor.
Set the screws on both sides of the upper shelf of the hoist arch in such a way that the drawbar moves up and down to maintain the stiffness of the hoist belt.
The upper and lower belt discs use external spherical ball bearings with square seats, which can be adjusted automatically for vibrations and shocks and have good sealing performance.
Only the selected high-quality commercial steel building can give full play to its advantages. Qingdao Xinguangzheng Steel Structure Co., Ltd. commits to provide perfect commercial steel buildings and service for every customer.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Introduction of Project:
Project address: Davao
Size: 123m * 16m * 2.5m
Detailed parameters: the beams and columns are H-shaped steel, the roof and wall are compounded with 0.4mm veneer + 75 thick glass wool quilt + 0.4mm veneer, and the side wall is insulated door (EPS composite board). The steel structure chicken house adopts the automatic breeding and cleaning system, with a height of 500mm from the ground, and the plastic floor is paved on it to ensure the cleanliness of the chicken house. At present, the survival rate of chickens is 99%.
1.Material of cage and frame is hot dip galvanized steel. The zinc thickness is 275g/m². The life span can reach 15-20 years.
2.The reasonable design of the feeding regulator ensures the regulator move stably, and the birds will not run away and get stuck.
3.Small water cup, feed trough and plastic net are equipped for day old birds.
Production introduction of Steel Structure AUDI Showroom and Workshop
Project Name: Audi Showroom and Workshop
Project Area: 4600 m2
Project address: Montevideo Uruguay
Project Details:
1. Showroom: Roof beam is truss structure, column is Box steel
2. Workshop: Roof beam is H section steel, column is H steel.
3. Wall Panel: Horizontal-Assembling PU Sandwich Panel
4. Roof Panel: EPS Sandwich Panel