Introduction of Zhongjie era Steel Structure Frame Overpass Project
Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.
After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.
Agricultural steel building has low cost, short construction time, and less pollution. Therefore, it has become the best choice for new-style construction.
Structural parts: material, surface roughness, tolerance, surface treatment, straightness (or radian)
Connection: hole position deviation, bolt grade; welding method, welding standard, welding material; air tightness, non-destructive testing, liquid penetration testing, etc. are required
Overall structure: verticality, horizontality, etc.
Packaging: packaging materials, packaging methods
Storage: ambient temperature, ambient humidity
Transportation: loading and unloading, placing in vehicles, placing in containers, etc.
Fire protection technology. One of the most critical issues in agricultural steel building is the application of fire protection technology. The fire resistance rating of light steel structure houses is level 4. For light steel structure residential buildings, fire-resistant gypsum boards are pasted on both sides of the wall and the ceiling of the floor. For ordinary firewalls and household walls, 25.4 mm thick (1 inch) gypsum boards are used to protect them to meet the 1-hour fire protection requirement. The glass fiber filled between the wall columns and the floor joists also plays an active role in protecting fire and heat transfer.
Sound insulation technology. The agricultural steel building is filled with glass wool between the inner and outer walls and the floor joists, which effectively prevents the audio part transmitted through the air. For the impact sound transmitted through the solid, the following construction is performed: the partition wall is composed of two wall columns. There are two walls with intermediate spaces; for the small keel used to fix the gypsum board for the suspended ceiling, an elastic structure with small cut grooves is used to effectively reduce the transmission of structure-borne sound between floors.
If an agricultural steel building is damaged, we must immediately recognise and remedy the problem. The main factors of steel structural damage are:
(1) the structural viability of agricultural steel buildings is insufficient due to changes in load, overdue service and changes in rules and regulations;
2) The components of agricultural steelworks are deformed, twisted, damaged, deformed, etc., due to various accidents; which results in a weakening of the cross-section of the component, a twisting of the rod and a tearing of the connection;
(3) deformation, cracking and retardation of agricultural steel components or connections due to temperature differences;
4) The agricultural steel structure corrodes due to the erosion of chemical substances and electrochemical corrosion leads to a weakening of the cross-section of the steel structure;
5) Other include errors in design, production, construction and illegal use and operation during the service period.
There are three main technical reinforcement measures for agricultural steel construction:
1) Cross-section defences: Apply the element locally or over the entire length of the element with steel and connect it to a whole to carry the force together;
2) Change the calculation diagram: add additional supports, adjust load distribution, reduce cutting force level, force displacement of static indefinite structural support and reduce peak voltage;
3) Pre-tensioned cable method: use high-strength cables to strengthen the weak links of the structure or to improve the overall durability, stiffness and stability of the structure.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been developing agricultural steel buildings for many years, and is known as "the national brand leader in the Chinesesteel building industry". Therefore, customers can choose their products with confidence.
The main material of commercial steel building is light steel keel synthesized from hot-dip galvanized steel strip through cold rolling technology. After accurate calculation and support and combination of auxiliary parts, it has reasonable bearing capacity and can replace traditional houses.
What are the progress of commercial steel building?
What is the future development of commercial steel building?
What are the necessary steps in the commercial steel building construction process?
1. The house has good safety performance. commercial steel building is anti-seismic, anti-typhoon, fire-proof and anti-insect and ants. The service life of the main building body can reach 90 years, the overall performance is good, it is not easy to be destroyed by earthquake force, and the building quality and safety performance are better.
2. The house is low-carbon, energy-saving, green and environmentally friendly, and can be reused. The steel of commercial steel building can be recycled and has little impact on the environment during construction and dismantling. Most of the other supporting materials can also be recycled, which meets the requirements of environmental protection; moreover, most of the materials are green building materials, which can meet the requirements of the ecological environment and are beneficial to health.
The steel structure used in commercial steel building will continue to develop into high-strength steel, which will greatly increase its yield point strength; in addition, new types of steel must be rolled, such as H-shaped steel (also known as wide flange steel) and T-shaped steel and profiled Steel plates, etc. to meet the needs of large-span structures and super high-rise buildings.
Steel structure is divided into light steel and heavy steel. There is no uniform standard for judging, and many experienced designers or project managers often cannot fully explain. They can be comprehensively considered and judged based on some data.
1. Purge device
This device uses a high-pressure fan, and multiple sets of elastic blowing nozzles with different angles are arranged in the auxiliary chamber of the chamber to blow and clean the projectiles remaining on the surface of the workpiece.
2. Import and export sealing
The inlet and outlet sealing devices of the workpiece are all made of rubber spring steel plate. In order to prevent the projectile from splashing out of the cleaning room during shot blasting, there are multiple reinforced seals at the inlet and outlet of the workpiece, which are characterized by strong elasticity, long life, and sealing effect. Superb.
3. Dust removal system
The dust removal system is mainly composed of a bag filter, a fan, and a dust removal pipeline. The dust removal efficiency can reach 99.5%.
This is the relevant knowledge about the commercial steel building for you to get more information about it. If you want to order a commercial steel building, you must choose Qingdao Xinguangzheng Steel Structure Co., Ltd., because they can provide the commercial steel building with most high-quality and suitable price.
Industrial steel building is a great invention. All components are prefabricated in the factory, and the site only needs to be assembled simply, thus greatly shortening the construction period. For a building of 6000 square meters, the basic installation can be completed in only 40 days.
What should I pay attention to when using Industrial steel building?
What are the reasons why Industrial steel building is used more and more widely?
What are the steps involved in the general process of Industrial steel building installation?
1. Industrial steel building construction has strict requirements for construction measurement. When the steel structure workshop stops the structural calculation, the mechanical model is very clear, and the size change has an obvious influence on the model. Therefore, during the manufacturing and installation stages, construction measurement is a more important issue. For example, inaccurate blanking will result in deformation of components; failure to be placed in place during installation will affect the load-bearing effect of the environmental characteristics of the construction site welding of steel structure workshops.
2. The steel of Industrial steel building has the characteristics of thermal expansion and contraction, and it is sensitive to weather, temperature and other conditions during the installation process. Industrial steel building welding has its own special technical requirements. In practice, when natural conditions cannot meet the work requirements, manual measures are often taken to create conditions for construction, such as preheating of welding rods and preheating and heating of steel plates. If the size of the steel structure factory building changes greatly during the construction process, the temperature is too high or too low will affect the accuracy of the device.
3. The Industrial steel building is easy to rust and has poor fire resistance, so it needs to be painted and maintained. Paint the steel structure factory building fireproof coating on the exterior of the Industrial steel building to play the role of fire protection and heat insulation maintenance, to prevent the steel from rapidly heating up in the fire and reducing its strength, and to prevent the steel structure factory building from losing its support ability and causing the building to collapse.
The grid structure of Industrial steel building has the advantages of reasonable stress, large stiffness, light weight, single member and convenient fabrication and installation. In recent years, it has been widely used in public and industrial buildings with large span and large column network. It can be used not only for roof structure, but also for floors, walls and special structures.
1. The main structure hoisting of Industrial steel building,
2. Secondary structure installation of Industrial steel building,
3. Installation of roof panel and insulation layer of Industrial steel building,
4. Wall maintenance and installation,
5. Finally, the detailed structure of Industrial steel building.
After reading this, have you also had the idea of ordering Industrial steel buildings. At Qingdao Xinguangzheng Steel Structure Co., Ltd., you can get the best quality Industrial steel buildings and the most intimate after-sales service.
The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.
Due to the increase in steel production in the world, many new factories have begun to introduce industrial steel buildings which can be divided into factories for light and heavy steel structures. Steel structures are industrial and civil engineering installations made of steel.
What are the reasons why people opt for industrial steel building?
What are the advantages for people who opt for industrial steel building?
What is the order of installation of industrial steel buildings?
Comfort
The industrial steel building uses a highly efficient and energy-saving system, has a respiratory function and can regulate the dry humidity of the inner air; The roof has a ventilation function that can form a flowing airspace over the house to ensure the ventilation and thermal drainage requirements within the roof.
Quickly.
The industrial steel building is completely dry and is not affected by the environmental season. With a building of about 300 square meters, only five workers and 30 working days can complete the entire process from foundation to decoration.
Environment
The material of the industrial steel buildings can be recycled to 100% which is really green and free of pollutants.
Save energy
All industrial steel buildings use high-efficiency energy-saving walls that have good heat storage, thermal insulation and sound insulation and can achieve 50% energy-saving standards.
1 industrial steel building has a wide range of applications: it can be used in factories, warehouses, office buildings, stadiums, hangars, etc. to be used. It is suitable not only for single-storey and wide-stretched buildings, but also for the construction of multi-storey or high-rise buildings.
2 The construction of the industrial steel building is simple and the construction time is short: all the components are pre-fabricated in the factory, the construction site only needs to be simply assembled, which greatly shortens the construction time. For a 6000-square meter building, the basic installation can be completed in just 40 days.
3 The industrial steel building is durable and easy to repair: the steel building constructed by universal computers maintains rough weather conditions and requires simple maintenance.
4 industrial steel building is beautiful and practical: steel construction has simple and smooth lines with a modern sense. The coloured wall panels are available in a variety of colours, and the walls can also be made of other materials, making them more flexible.
5 The cost of industrial steelmaking is reasonable: the steel structure has a low weight, reduces the cost of the foundation and is fast in construction. It can be completed and put into service as soon as possible. The overall economic benefits are much better than those of concrete construction.
Installation procedures for industrial steel buildings:
Steel column installation → installation of support between columns → temporary installation of steel crane beams → roof beams, roof supports → correction and fixation of steel crane beams → maintenance of structural installation.
Qingdao Xinguangzheng Steel Structure Co., Ltd. strives to provide top-quality industrial steel buildings with reasonable prices, efficient production time, and the most professional customer service.
Pictures for Prefab Metal Workshop Steel Structure Construction Workshop House in Costa Rica
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients,we will supply different designs and steel products.In order to give you an exactly quotation and drawings, please let us know the following informations. We will quote for you promptly.
Basic design requirements of steel structure warehouse
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.
Cheap prefab structural steel warehouse prefabricated outdoor storage shed building design price steel structure warehouse
Generally speaking, the installation procedures of industrial steel building include installation of steel columns, installation of inter-column supports, temporary installation of steel crane beams, roof beams, roof supports, steel crane beams, etc., correction, fixation, and structural installation of maintenance.
What is the specific process of industrial steel building construction?
How to regularly maintain industrial steel building?
How to consider the cost of industrial steel building construction?
1. Lifting the main structure of industrial steel buildings: connecting steel carriers on the ground, erecting steel columns, lifting steel carriers, connecting secondary structures, correcting the deviation of the main structure, installing crane carriers (optional), lifting intermediate layers (optional), and coating with fire resistant paint pack.
Main control quality: The deviation of the main structure should meet the specifications and design requirements and the initial and final application of high-strength screws should meet the requirements.
2. Installation of secondary structure: roofing posts, roof wall supports, flange supports, etc.
3. Laying of roof plate and insulation layer: first lay insulation layer, then assemble roof plate (in some projects a position of steel fabric is also placed under the insulation layer to prevent a fall of the insulation layer, this mainly depends on insulation layer level)
Main quality control: The roof is mainly waterproof, therefore the plate should be covered with the plate, the nail position, the glue coating should be full or not, the glue should be wiped clean and the coating on the surface of the plate should not be damaged to rust etc. to avoid.
industrial steel building wall maintenance and installation: mainly the installation of wall insulation and wall panels.
The main quality control of industrial steel building: the wall is mainly an aesthetic problem, and a window area is waterproof. There is also the problem of installation deviation. For example, the bottom should be flat, the entire plane should be flat, the flatness deviation between the board and the board should meet the requirements, and so on.
The detailed structure of the industrial steel building: mainly the installation of some trims, such as the wrap angle between the roof and the wall, the wrap angle at the corner of the wall, the flooding board between the wall panel and the brick wall, the door and window trim, etc.
The price of industrial steel building can only be compared with certain basic conditions, such as whether it is imported or domestic color panels, its thickness, coating; insulation material and thickness; whether there is a skylight; workshop bays and spans; whether there are cranes, crane tonnage, Many factors such as the level of the work system are related, and the impact of the price difference in other regions and the qualification level of the construction unit cannot be ignored.
The industrial steel building has achieved an irreplaceable position in industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing different kinds industrial steel buildings of high quality for all customers from all over the world.