The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.
Steel building accessories has the advantages of overall light weight, saving foundation, less materials, low cost, short construction period, large span, safety and reliability, beautiful appearance and stable structure. Steel structure workshop is widely used in construction industries such as long-span industrial workshop, warehouse, cold storage, high-rise building, office building, multi-storey parking lot and residential house.
How to use the machine to remove the rust spots on the surface of Steel building accessories?
What are the main Steel building accessories?
How to remove the rust spots on the surface of Steel building accessories?
For Steel building accessories that have been used for a period of time, there are inevitably some attachments on the surface, such as rust, dirt, dust, old paint film, etc. Before painting the surface of Steel building accessories, if these attachments are not completely removed, although they can be temporarily covered after painting, they play a role of isolation, which makes the coating and the component substrate bond If the strength is severely reduced, the paint film will fall off prematurely, which will eventually reduce the corrosion resistance of the surface coating and fail to play the protective role of the coating. Therefore, before painting the surface of the component, the attachments on the surface of Steel building accessories should be thoroughly cleaned.
In order to improve the quality of rust removal and work efficiency. To improve the working conditions of construction workers, the current Steel building accessories derusting work has adopted a large number of wind-driven or electric small equipment. The main rust removal methods using equipment are:
(1) Angle grinder: This small pneumatic equipment is mainly used to clean flat areas. It can use sandpaper, grinding wheels and wire brushes as needed.
(2) Needle Bundle Derusting Machine: This kind of small pneumatic equipment is generally equipped with 30-40 needle bundles, which can be adjusted with different working surfaces, which are mainly suitable for curved, narrow, uneven and cracked places.
(3) Single-head cold air gun: This small pneumatic equipment is also called zinc knocking. It uses the impact of the knocking head to remove rust. The diameter of the shovel head is generally 25-40mm, and it can impact 1000 to 6000 times per minute. Suitable for relatively narrow places.
1. Two-hole connection accessories
One of the main accessories of Steel building accessories is the double-hole connection accessory, which is mainly used to connect with the corners. The corners on both sides of the right-angle connection can reduce the pressure on the alloy. At the same time, the recesses of the building materials can be based on the aluminum alloy frame.
2. Single hole connector
Steel building accessories also has an important accessory, the single-hole connector, which has a completely different function from the double-pipe connector. It is mainly used for the affinity connection between the aluminum alloy frame and the ground in the ground installation. Therefore, the single-hole connector has The role of anchor bolts.
The Steel building accessories have been widely used in daily life and industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. can provide the best Steel building accessories for their customers.
Introduction of Ethiopian Prefabricated steel structural water bottling processing workshop
Located: Ethiopia
Construction area: 2000㎡
Cladding: 0.5mm galvanized sheet (No insolution)
XGZ provide design,fabrication and installation guidance as client's required.
Company information of Ethiopian Prefabricated steel structural water bottling processing workshop
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one
hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global
valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Ⅰ. Steel column installation for steel structure construction
1. Installation sequence of steel column:
① Foundation setting out → ② binding → ③ hoisting → ④ correction → ⑤ final fixation
2. Installation method of steel column:
(1) Setting out:
A. Elevation control:
In this structural steel construction project, iron parts and "middle bars" are controlled according to the depth of concrete cup mouth, the elevation of steel column bottom and the embedded elevation in the center of the bottom of the cup mouth during the construction of concrete foundation (φ30 steel bars), the elevation of top surface of "middle reinforcement" is based on the elevation of steel column bottom, and the elevation error of iron parts is controlled in ± Within 1mm.
To ensure the steel column is embedded in the foundation accurately and firmly φ On the 30 "middle reinforcement", weld a steel plate with thickness of 20 at the bottom of H-shaped steel column, as shown in the figure below.
When installing structural steel column, clean the foundation cup mouth first, and check the embedded elevation control "middle reinforcement" in the foundation(φ The actual height of 30 steel bars) is not necessary because the elevation embedded in the foundation construction has been controlled precisely, and no additional iron pad is needed. The method is simple, fast and efficient for the treatment of steel column feet. The construction is fast and the force is reasonable. When the column is lifted, it can be adjusted freely in several directions when the elevation is unchanged.
B. Before installation, the vertical and horizontal axis reference lines of the foundation plane shall be placed on the top of the cup mouth by woodworking ink bucket as the installation and positioning line of steel column.
(2) Column binding and hoisting:
A. after the steel column enters the site, the steel column shall be arranged according to the position of the lifting plan, and the model and number shall be checked to see if they are correct. The plane position of steel column after entering the site is shown in the following figure.
B. Before the column is lifted, a horizontal line shall be drawn with red oil paint 2300mm upward from the bottom of the column, so as to recheck the plane elevation datum before and after the installation and fixation.
C. the column installation belongs to vertical hoisting. In order to keep the suspended column drooping and facilitate the positioning, the binding point is determined at the lower part of the bracket. In order to prevent the sharp edges and corners of the column edge from damaging the lifting rope during hoisting, the rubber belt of the old car is used to separate and cover the edge and corner lifting rope. Pay attention to binding firmly and easy to remove.
D. temporary steel ladder and high-strength bolt installation fixture of working platform shall be bound on the steel column.
E. in order to avoid the free swing of the suspended column, hemp rope should be used to tie the upper part of the column bottom as a restraint rope and adjust the direction.
F. according to the site conditions, the rotation method is adopted for hoisting
After the preparations before hoisting are ready, the trial hoisting shall be carried out first. When the height of the steel column is 200 mm above the ground, the hoisting shall be stopped to check whether the rigging is firm and whether the crane is stable. After confirming that there is no problem, the crane can be directed to slowly lift, rotate to the top of the cup mouth, and then slowly descend. When the distance between the bottom of the column and the design position is 40-100 mm, adjust the two datum lines of the column body and the foundation to reach the accurate position, direct the crane to descend to the position, and temporarily fix the column with steel wedge (or wood wedge) and wind rope to remove the hook.
• Key points of rotation method:
The method of lifting the column by rotating the column around the column base is called rotation method, as shown in figure a below. When the column is hoisted by rotation method, in order to improve the hoisting efficiency, when the steel column enters the site, the binding point of the column, the center of the column base and the center of the cup foundation should be placed on the arc with the crane stop point as the center and the distance from the stop point to the binding point (i.e. the turning radius of the column), as shown in Figure B below.
The steel column hoisting is shown in the figure below:
(3) Preliminary correction of column:
The column should be corrected on the side with large deviation first, and then on the side with small deviation.
A. The correction of column generally includes plane position, elevation and perpendicularity.
B. When the steel column is hoisted in place, it is one-time alignment, and generally it does not need plane re correction. For the elevation of the column, it has been used before hoisting φ The embedded "middle reinforcement" can accurately control the elevation. Generally, it only needs to be checked, and it does not need to be corrected. Therefore, the steel column correction is mainly to correct the verticality and recheck the elevation.
C. In this project, the perpendicularity of the column is observed, and two theodolites are used for measurement and correction.
• First, place the theodolite on one side of the column, align the longitudinal center wire with the baseline of the column base, and then fix the screws of the horizontal plate.
• Measure the center line of the column and observe from bottom to top. If the vertical center line is aligned, that is, the column is vertical. If it is not aligned, the column shall be adjusted until it is aligned with the longitudinal center line of theodolite.
• Measure the horizontal line in the same way so that the center line of the other side of the column is perpendicular to the horizontal axis of the baseline. After the column is accurately positioned, the column can be fixed.
• Verticality correction of steel column: distance adjusting screw rod and steel wedge are used. Due to the small contact surface of the long side of the column, the base plate is set during the construction. The details are as follows.
The manufacturing dimension of steel wedge is shown in the figure below:
(4) Final alignment and fixation of steel columns:
After the steel column is hoisted in place, the column correction mainly involves the adjustment of elevation and the correction of verticality; The correction method can use tools such as wind rope, Jack, crowbar and steel wedge (or wooden wedge) to apply vertical force and lateral force of pulling, jacking, supporting and prying to the steel column.
Adjust the verticality, positioning axis and elevation of the column. After confirming the correctness, the gap between the steel column and the foundation cup mouth shall be poured with C40 fine stone concrete. The expansive high strength grouting material is preferred.
Ⅱ Protection of site components:
1) The unloading of components shall be careful to prevent damage and prevent collision and extrusion between members.
2) The members shall be stacked in order at the designated site, and the number of layers stacked by steel beams shall not exceed 3 layers to prevent the members from squeezing and deformation.
3) Before hoisting, oil, sediment and dust on the surface of the components shall be cleaned.
Ⅲ The placement of components and the requirements for the site
1) When unloading, the components are unloaded directly near the installation position and within the radius of rotation of the crane. Mark the number clearly with a clear color pen to facilitate lifting.
2) The components are placed in order in the site, and a certain gap is reserved between adjacent components to facilitate binding.
3) The site shall be solid and flat, and the components shall not be polluted due to rain and snow, and the vehicle with 30 ton level can be walked.
Ⅳ Steel structure building installation
Preparation before hoisting of steel column:
Before hoisting the steel column, the cable wind rope shall be tied to the column body. The lifting point shall be at the bracket position, and the double wire rope shall be set up and down, and the snap ring can be checked to be qualified before entering the next work. Before hoisting the steel column, the positioning axis, foundation axis and elevation, cup opening size and the height of the bottom standard of the steel column must be inspected and handed over and accepted. The number, outline dimension, screw hole position and diameter of the steel column shall be comprehensively reviewed. After confirming that it meets the requirements of design drawings, draw out the installation center line and the lower end elevation line of the steel column.
Ⅴ Steel column hoisting
(1) installation method of steel column
Before lifting the steel column, the wooden board shall be fixed at the column foot to prevent damage to the column foot and other structures.
Special hoisting steel wire rope is used for steel column binding. Wood or rubber sheet shall be used to prevent damage to the steel column.
The steel column is installed by a 25t truck crane. When the steel column is lifted, the crane shall hook and rotate the arm while lifting the steel column to make the steel column vertical away from the ground.
(2) positioning adjustment and temporary fixation
When the steel column is lifted to 200mm above the base cup mouth, it will be stable, and it will fall slowly at the base cup mouth. Avoid hitting the concrete edge of the foundation cup mouth during falling. After implementation, use special angle ruler to check, adjust the steel column to make its positioning line coincide with the foundation positioning axis. Three people are required to operate the adjustment, one person moves the steel column, one person helps to stabilize and the other person conducts the test. The positioning error is controlled within 2mm.
(3) when adjusting the elevation of the steel column, place the pad iron at the bottom of the cup foundation, use the level to super level the bottom plate elevation of the steel column as the top elevation of the pad iron, so that the elevation after the steel column is in place can meet the design elevation requirements, mark the elevation datum point on the column body, and then use the level to measure the installation elevation after it is installed in place.
(4) the verticality of the steel column shall be preliminary adjusted by the level ruler. Then two theodolites are used to observe from both sides of the column at the same time, and the adjustment is carried out by relying on the cable wind rope. As shown in the figure below:
Diagram of verticality adjustment of steel column
(5) after the adjustment, use eight iron wedges to position the gap between the bottom of the steel column and the base of the cup mouth, and then spot weld the column to make it stable.
Ⅵ Steel beam installation
Steel beams must be stacked in order on site for this steel work in construction. Sleepers must be placed in the middle of each layer of steel beams. Two lifting points for steel beam hoisting are selected on both sides of the center of gravity of the steel beam. The two lifting points should be 800mm away from the support and the middle of the span, and the distance between the two lifting points should be increased according to the length of the steel beam.
To ensure safety and prevent the sharp edge of the steel beam from cutting the steel wire rope, the steel wire rope shall be protected, the angle of the sling shall not be less than 450, and the steel beam shall be directly tied and rolled with the steel wire rope or lifted with a special fixture.
Before hoisting the steel beam, install the safety rope on the steel beam. When hoisting, hang two sliding ropes at both ends of the steel beam. Two people pull two sliding ropes respectively. The hoisting speed of the steel beam must be slow. In order to ensure safety, personnel should not stand directly under the beam. The cloth bags specially used for placing high-strength bolts are put on both ends of the steel beam. When the steel beam is hoisted above the position, the steel beam is put in place. The falling speed of the steel beam is controlled at 3m / min. two installers are arranged at both ends of the steel column head to prepare for the installation of the steel beam. When the steel beam is close to the in place position, two installers should hold the upper flange of the steel beam with their hands respectively, drag the steel beam to the in place position, and prepare to install the high-strength bolts.
Ⅶ Installation of retaining structure and support corner brace
1) Installation of roof purlin: when the main structural steel forms a frame section, the roof purlin is hoisted to the main beam of the roof with a crane and installed manually. The purlin can also be manually pulled onto the roof with a white synthetic rope for installation. After the installation of purlin, the purlin support is installed in time.
2) Wall purlin installation: when the main structure forms a frame section, the construction personnel stand on the scaffold platform and pull the wall purlin to the installation position with white comprehensive rope.
3) Corner brace installation: after the main body is welded, the corner brace is connected.
Ⅷ Measurement and correction of steel column
Verticality correction of steel column
When the steel column is installed and corrected, two theodolites are set up on the control line with 90 degree translation of 1 meter each other, and the theodolite operators observe the small steel ruler on the top of the column, measure the deviation of the steel column and direct the correction.
A. Control the verticality of the steel column between the first hoisting joints.
B. Steel column calibration is divided into four steps:
initial calibration during initial tightening; Re-calibration before final tightening; Tracking and monitoring during welding process; Final result measurement after welding.
The perpendicularity can be roughly controlled with a long level before the initial tightening, and it can be accurately corrected after the frame is formed. After welding, retest shall be carried out, and the measurement results shall be compared with those at final tightening, so as to be the basis for the next construction.
C. Verticality measurement method of C steel column
Initial correction: the perpendicularity of the steel column is preliminary adjusted with a level ruler.
Accurate correction of steel column perpendicularity: one column grid is used as an installation section for the hoisting of the main frame until the hoisting of three continuous complete sections is completed
After the whole is formed, the measurement correction can be inserted. Two theodolites are used to observe from both sides of the column at the same time, and the wind rope is used for correction and adjustment.
Ⅸ Steel structure survey
2) Elevation control of steel column
Based on the elevation reference point of the plane layer where the steel column is located, the deviation value of the horizontal elevation of the steel column is measured with the level gauge and the correction is directed.
3) Steel beam measurement
After the steel column is hoisted and corrected, the +1.00m control point shall be measured to each steel column according to the site level as the basis for vertical transfer of elevation and the elevation of beam installation; Pop up the center line of the steel beam on the surface of the steel beam.
The control axis is measured to the column body to control the beam position offset; The accuracy of beam elevation is controlled according to the control point of column elevation. Set up theodolite on the floor platform, and then look at the cross angle to the axis of the corresponding beam. Aim at the center line of the upper surface of the beam to the other end with theodolite to see if the number coincides with the axis of the beam.
Calculation of survey and lofting data
In this project, the computer automatic query method is used to calculate the survey and lofting data. The specific steps are as follows:
1) The establishment of data model
Firstly, according to the design coordinates and the dimension relationship of each building in the design drawing, the building, building axis, control line to be lofted and so on are drawn in AutoCAD according to the proportion, and the data model is established.
2) Survey and lofting data query
After drawing the survey loft data model, the survey loft data such as the angle and distance between the known basis (axis control pile, lofted axis, etc.) and the control line to be lofted are queried by using the command of dist of AutoCAD.
3) Advantages of computer automatic query
The method of computer automatic query is used to obtain the required measurement and positioning data. It is not only convenient to calculate, but also has high precision. The distance precision can be set to 0.1mm, 0.01mm, and the angle precision to 0.0 ", 0.00" or higher according to the actual situation.
Ⅹ Construction of high strength bolt
1. Preparation before installation
1) Test and inspection of high strength bolt
Anti slip coefficient test
The project adopts class 10.9 large hexagon high-strength bolts. The anti slip coefficient test of high-strength bolts shall be conducted by taking the most representative thickness of the plate in the project for test, and three groups shall be made.
The size of the specimen plate is as follows:
Axial force test
Randomly select the bolts to be installed at the construction site, and 8 sets of bolt pairs are selected for re inspection in each batch.
2) Transportation and storage of high strength bolts
transport
The form, size and technical conditions of high-strength bolt connecting pair shall be manufactured and supplied by the manufacturer according to batch, with factory certificate and high-strength bolt connection pair, which shall conform to the provisions of national standards gb1228-1231-84 and gb3632-3633-83. High strength bolts with large hexagon for steel structure
The connecting pair consists of a bolt, a nut and two washers. The combination of use shall meet the national standards, and the high-strength bolt connection pair shall be supplied with storage and transportation in the same batch.
The high-strength bolt connecting pair shall be installed and placed lightly during loading, unloading, transportation and storage to prevent the packing box from being damaged or damaged.
Storage of high strength bolt warehouse
1. the high-strength bolt connection pair shall be cleaned according to the specification, batch number and supply date of the packing box, and shall be kept in the indoor warehouse, and the accumulation shall not be higher than 3 layers. The indoor moisture-proof, long-term dry, rust and dirt contamination shall be prevented, and torque coefficient shall be prevented from changing. The bottom layer shall be more than 300mm above the ground level.
2. when installing on site, the quantity of high-strength bolts required on the day shall be issued. The rest should be kept properly. Do not put it in disorder, damage the thread, and be contaminated with dirt.
3. before using the long-term storage high-strength bolt connection pair, a comprehensive quality inspection shall be conducted again. If any abnormal phenomenon is found after unpacking, the inspection standard shall be conducted according to the relevant provisions of national standards gb1228-1231-84 and gb3632-3633-83. It can be used after being qualified.
3) Construction management of high strength bolts
1. Construction Manager
When carrying out the construction of this high-strength bolt, the high-strength bolt manager shall be determined first to be responsible for the project management, quality management and guidance of the construction personnel.
2. weather management (climate conditions)
In principle, no operation shall be carried out during rainfall and snowfall. If rain or snow fall occurs during operation, the speed shall be accelerated to lock the unfinished ones
3. friction surface management
Before tightening, the friction surface shall be inspected first. If there are any attachments to reduce bearing capacity of friction surface, such as rust, oil, paint and residue, metal brush, sandpaper and oxygen acetylene flame shall be used for removal.
4) Construction of high strength bolts
1. final tightening of temporary bolts
Before inserting high-strength bolts, temporary bolts shall be used to tighten the connection tightly, if the materials of the connection parts are bent or warped, they shall be corrected.
If the difference of holes is within 2mm, it can be corrected by cutter.
If the difference of holes exceeds 2mm, reasonable treatment methods such as replacement of panel shall be adopted based on consultation with management personnel, and gas cutting and reaming are not allowed.
2. high strength bolt insertion
The nut and gasket of high-strength bolt shall pay attention to the installation direction, and install according to the following figure.
When inserting bolts, pay attention not to attach rust, dust, oil, etc. to the bolts. In addition, do not force into the bolt hole during construction to avoid damaging the thread.
3. initial tightening
After the temporary fixing bolts are locked, confirm the compactness of the components.
After initial tightening, mark with white marker through bolt nut, gasket and component.
When using the inspection wrench, although the torque value can be confirmed by the contact sound, it is easy to over tighten if the mechanism continues to apply force, so it should be noted.
4) Final tightening
After initial tightening, use special fastening wrench to lock until the neck is broken.
In principle, the bolts inserted on the same day shall be screwed out on the same day.
Agricultural steel building's adaptable and customizable steel structure provides an ideal environment for agricultural production space. It can be used for storage and background operations, as well as for display and ground retail.
What are the material characteristics of Agricultural steel building?
Why do you choose Agricultural steel building?
What is the current development trend of Agricultural steel building?
1. High material strength and low weight
The steel of the agricultural steelworks has a high strength and a high elasticity module. Compared to concrete and wood, the ratio between density and distance is relatively low. Therefore, under the same load conditions, the steel structure has a small cross section and a low weight, which is convenient for transport and installation. It is suitable for large stretches, large heights and heavy bearing constructions.
2. Steel capacity, good plasticity, uniform material, high structural reliability
Agricultural steel building is suitable for withstanding shocks and dynamic loads and has good seismic performance. The inner structure of the steel is uniform, close to an isotropic homogeneous body. The actual working performance of the steel structure corresponds rather to the calculation theory. The steel structure is therefore highly reliable.
3. High degree of mechanization of steel construction production and assembly
The steel components of Agricultural steel building can easily be manufactured in factories and assembled on site. The mechanised production of steel components in the plant is characterized by high precision, high production efficiency, fast assembly on site and short construction time. Steel construction is the most heavily industrialised construction.
Whether it is used to store hay, equipment, livestock or cars, Agricultural steel buildings and garages have become the preferred structures for farmers and agricultural giants around the world. The use of a transparent frame structure can realize a column-free indoor space, maximize the space, and encourage customization and gradual adjustment. It is the best choice for agricultural construction projects.
In addition, although wooden barns are still particularly generous due to their aesthetic sensitivity, the absolute flexibility of steel allows manufacturers to bend steel into unique, beautiful and modern shapes, which has attracted the attention of contemporary art. In the end, in the face of structural oppositions such as rust, water, insects, and heat, no building material can withstand turmoil better than steel, so Agricultural steel building is the best choice.
At present, Agricultural steel building has been able to design and produce roof tower steel structures according to customer requirements. Agricultural steel building integrates its use and decoration. Agricultural steel building is also multi-functional, equipped with lightning protection, aviation obstruction lights, wireless communication devices, communication dispatching, radio and television and other equipment.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is a Agricultural steel building manufacturer established for more than ten years. We work with customers from design to completion to ensure that all technical requirements are met.
Residential steel building is lightweight and high-strength. For buildings of the same weight, the steel structure has a small cross-section and a large net height, which can save building height. The number of layers of steel structure is more than that of concrete, which not only increases the building area, but also brings good economic benefits.
What are the advantages of Residential steel building?
What raw materials should be used for the walls of Residential steel building?
What is the roof system of Residential steel building?
1. Superior seismic performance
Compared with traditional residential structures, Residential steel building is a flexible structure and has a lighter weight. Therefore, buildings with the same fortification intensity and the same site will bear less seismic force, and the earthquake disaster caused by them will be weakened accordingly. The use of steel in the earthquake zone Structural housing will reduce casualties and property losses, with considerable comprehensive benefits.
2. Flexible layout and increased effective use area
Residential steel building adopts steel structure, which can realize large span under the premise that the cross-section is not too large, which makes the building function very flexible and can be flexibly arranged according to the needs of residents, which is conducive to meeting the needs of modern homes and adapting The needs of the modern housing market. Moreover, the steel structure is adopted, the cross-section of the beams and columns is small, and the use area of the residents is increased at the same time.
Residential steel building's steel frame system, steel frame-support system, steel frame-concrete core tube (shear wall) system outer walls can be filled with small concrete block walls, autoclaved lightweight aerated concrete slabs, and prefabricated reinforced concrete walls Board, steel wire mesh frame polystyrene sandwich panel, fiber cement external wall hanging panel, polyurethane composite external wall panel, metal surface embossed composite panel, etc. The inner wall can be made of glass fiber strong gypsum hollow board, fiber cement board infusion (foam concrete) wall, light composite wall board, etc.
1. The flat roof of the Residential steel building adopts steel beams (I-beam, C-shaped steel), prefabricated reinforced concrete roof panels, and thermal insulation and waterproof layer.
2. The sloping roof of Residential steel building adopts portal frame, truss, light steel keel truss (bracket), I-shaped (or C-shaped) and steel purlin, colored cement tile, colored steel plate tile and colored asphalt tile roof. Thermal insulation and waterproof layer should also be used in the slope roof. The thickness of the insulation layer is determined by thermal calculation and meets the requirements of energy-saving design standards.
It is an important choice in residential building construction. A good Residential steel building starts with the best engineering staff, and Qingdao Xinguangzheng Steel Structure Co., Ltd. is always ready to help you meet your technical and practical requirements.
The full name of MDC is"MONDU DA CASA (home world)", which is constructed by Qingdao Xinguang Zheng Steel Structure Co., Ltd. This is a comprehensive shopping center centering on the theme of "happy home". This theme is the same as the enterprise mission of "benefiting the society, achieving employees and making customers happier". In addition to "home world", she has another interpretation of "modern decoration Center".
MDC is located in KIKUXI section of Luanda expressway, surrounded by Angola national stadium, high-end residential villa area, Brazil nursery garden, and Luanda commercial pedestrian street under planning, with superior geographical environment and convenient transportation.
"MDC home world" shopping center covers an area of about 30000 square meters. Relying on the global procurement network, it has gathered kipor generator 4S shop, furniture store, building materials store, home furnishing store and home appliance store. The categories include building materials pipe fittings, wood, floor tiles, paint and coating, decorative lamps, kitchen and bathroom equipment, hardware tools, electrical and electrical materials, gardening supplies, cloth furniture, home appliances, etc., and also auxiliary It is one of the most comprehensive "one-stop purchasing" centers for home furnishings in Luanda with public service facilities such as business office, catering, leisure and entertainment, bank, etc.
Prefab House refers to the use of industrial production methods to build houses, that is, the stairs, exterior walls, balconies, air-conditioning panels, etc. of the house are all prefabricated in the factory outside the construction site, and then shipped to the construction site for "assembly", and the interior of the house will be refined at one time. Handed over after renovation. That is, the huge external walls, stairs, and balconies from the factory are "assembled" on the construction site into houses and buildings.
What are the advantages of a Prefab House?
What are the structural types of Prefab Houses?
What should we be careful about when selecting a Prefab House?
1. Safe and reliable
The Prefab House with steel as the main building material has a high capacity per volume unit, is more stable and solid than the traditional brick and brick concrete technology, has a better seismic performance, wind resistance, water density and refractory performance and also has thermal insulation and sound protection functions. Steel has good ductility and can better use the energy brought in by earthquakes, so it has good seismic performance and a high structural security t hat guarantees the safety of stay.
2. Easy construction and short construction time
All components are prefabricated in the factory and only have to be installed on site, which greatly shortens the construction cycle. A 6000-square-metre-long building can basically be installed in 40 days.
1. Structural system
The structure of the Prefab House can be divided into: steel frame system, steel frame support system, steel frame-core tube system, steel frame-module-core tube system and steel frame-shear-wall system. With the continuous development of the technology, newer steel construction systems will also appear.
2. Peripheral protection system
The outer protective system of the Prefab House can be divided into blocks, plates, cans and other types.
3. Internal system
Traditional construction has many disadvantages. For example, the traditional rough decoration method does not separate the interior system and the structural system, which makes it difficult to adapt to the modern development of the housing industry; the house technology lines are not separated and the water and power lines are buried in the support layer, which the "century residence" cannot realize." The waste of social resources is serious.
1.The costs are relatively higher than in the traditional Prefab House made of brick concrete and concrete.
2. The steel structure of the Prefab House, with its unique steel structure, walls, roofs and other materials, as well as the standardized and final internal distribution and support facilities, is difficult to adapt to the habits of people "arbitrarily handling the house".
3. Corrosion of steel: Al-galvanized steel must be used for maximum corrosion protection and the main steel structure can reach fifty years.
4. There are many requirements for new materials. The structure of steel houses is equipped with materials such as thermal insulation and heat protection, usually using new lightweight materials.
Prefab Houses produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. feature attractive appearance, excellent performance, user-friendly operation, easy maintenance, and internationally advanced performance indicators, and are exported to more than 10 countries and regions.