Plant Introduction of Sri Lanka Prefabricated Steel Structure Material for Power Plant
Project Brief Description: Lakvijaya power plant, the largest power plant in Sri Lanka, is the company that undertakes the steel structure materials of wind barrier project. Designed and fabricated by Qingdao Xinguangzheng Steel Structure Co., Ltd. in 2019.
Qingdao Xinguangzheng steel structure Group is a public company with 1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Agricultural steel building's adaptable and customizable steel structure provides an ideal environment for agricultural production space. It can be used for storage and background operations, as well as for display and ground retail.
What are the material characteristics of Agricultural steel building?
Why do you choose Agricultural steel building?
What is the current development trend of Agricultural steel building?
1. High material strength and low weight
The steel of the agricultural steelworks has a high strength and a high elasticity module. Compared to concrete and wood, the ratio between density and distance is relatively low. Therefore, under the same load conditions, the steel structure has a small cross section and a low weight, which is convenient for transport and installation. It is suitable for large stretches, large heights and heavy bearing constructions.
2. Steel capacity, good plasticity, uniform material, high structural reliability
Agricultural steel building is suitable for withstanding shocks and dynamic loads and has good seismic performance. The inner structure of the steel is uniform, close to an isotropic homogeneous body. The actual working performance of the steel structure corresponds rather to the calculation theory. The steel structure is therefore highly reliable.
3. High degree of mechanization of steel construction production and assembly
The steel components of Agricultural steel building can easily be manufactured in factories and assembled on site. The mechanised production of steel components in the plant is characterized by high precision, high production efficiency, fast assembly on site and short construction time. Steel construction is the most heavily industrialised construction.
Whether it is used to store hay, equipment, livestock or cars, Agricultural steel buildings and garages have become the preferred structures for farmers and agricultural giants around the world. The use of a transparent frame structure can realize a column-free indoor space, maximize the space, and encourage customization and gradual adjustment. It is the best choice for agricultural construction projects.
In addition, although wooden barns are still particularly generous due to their aesthetic sensitivity, the absolute flexibility of steel allows manufacturers to bend steel into unique, beautiful and modern shapes, which has attracted the attention of contemporary art. In the end, in the face of structural oppositions such as rust, water, insects, and heat, no building material can withstand turmoil better than steel, so Agricultural steel building is the best choice.
At present, Agricultural steel building has been able to design and produce roof tower steel structures according to customer requirements. Agricultural steel building integrates its use and decoration. Agricultural steel building is also multi-functional, equipped with lightning protection, aviation obstruction lights, wireless communication devices, communication dispatching, radio and television and other equipment.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is a Agricultural steel building manufacturer established for more than ten years. We work with customers from design to completion to ensure that all technical requirements are met.
Prefab House refers to a building where parts and components produced in a factory are assembled and connected at the construction site. Steel structure prefabricated buildings refer to steel structure components produced in factories and assembled and connected at the construction site.
Different countries have different understandings and practices of the housing system, but Prefab House generally refers to the main project of the house. Different residential products are formed due to the selection of different structural materials, structural types and construction methods, and constitute a number of corresponding residential products ranging from design to The complete technology of construction. The steel structure residential building system uses the steel structure form as the basis for the classification of the building system and becomes a branch of the building system.
The material of Prefab House has good homogeneity and isotropy, which is an ideal elastic body, which is most in line with the basic assumptions of general engineering mechanics; the material has good plasticity and toughness, can have large deformations, and can well withstand dynamic loads; construction period is short ; It has a high degree of industrialization and can be used for specialized production with a high degree of mechanization; it has high processing accuracy, high efficiency, and good airtightness, so it can be used to build gas tanks, oil tanks, and transformers.
In the future, the steel structure of Prefab House should study high-strength steel to greatly increase its yield point strength; in addition, new types of steel should be rolled, such as H-shaped steel (also known as wide flange steel), T-shaped steel and profiled steel plates, etc. The needs of large-span structures and super high-rise buildings.
(1) Light weight and high strength. Due to the use of steel as the load-bearing structure and new building materials as the enclosure structure, Prefab House generally uses steel structure to build residences that weigh about one-half of the weight of reinforced concrete residences, which reduces the weight of the house and reduces the cost of basic engineering. Since the building area occupied by the vertical force-bearing member is relatively small, the use area of the house can be increased. At the same time, because the steel structure residence adopts a large bay and large depth column network, it provides residents with a large space that can be flexibly separated, which can meet the different needs of users.
(2) The degree of industrialization is high and meets the requirements of industrialization. Most of the structural components of Prefab House are made in factories, which are easy to install and suitable for mass production. This has changed the traditional way of housing construction and realized the transformation from "building houses" to "manufacturing houses". Promoted the transformation of the housing industry from extensive to intensive, and at the same time promoted the development of productivity.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has worked on the production of Prefab Houses for several years. You can find the best Prefab House in this company.
Prefab House only prefabricates some parts, and it must be poured in the same way as traditional buildings on the construction site. It is not "building blocks" as imagined. Therefore, no difference can be seen from the appearance of the house after it is built. Here we are going to introduce the Prefab House.
What are the reasons why people choose Prefab House?
What are the advantages of steel structure prefabricated houses?
What are the advantages of Prefab House for building plant?
1. Prefab House is of great benefit to energy conservation and environmental protection. Through factory production and on-site assembly construction, it can greatly reduce construction waste and construction sewage, reduce construction noise, reduce harmful gas and dust emissions, and reduce on-site construction and management personnel. Generally, it can save 20% of materials and about 60% of water.
2. The housing industrialization of Prefab House is not only beneficial to the capital flow of development enterprises, but can also increase the speed of housing listing, so it can greatly alleviate the current situation of insufficient market supply and adjust the supply relationship. After large-scale promotion, construction costs can be reduced, and it will also play a role in restraining housing prices.
3. Comprehensive cost accounting shows that the construction cost of Prefab House is higher than that of traditional construction methods, but after large-scale promotion, construction costs can be reduced.
First, the components of prefabricated houses can be industrialized in factories. The components are equivalent to standard products and can be installed directly after being transported to the site. It can be said to be convenient and fast. The construction field during the construction period, especially the unparalleled advantages.
prefabricated houses with steel structure are more stable than those made of welded frame steel. In addition, it is cheaper and more economical. Long service life, 50-70 years. Locked with bolts, it can be used repeatedly without any maintenance.
1. Large span: such Prefab House can realize single span or multi span, and the maximum span without center column is 36m.
2. Low cost: according to the requirements of customers, the unit price of Prefab House ranges from $150 / m2 to $300 / m2.
3. Convenient installation and short construction time: save manpower and cost for customers.
4. Prefab House has a long service life: up to 50 years
5. Environmental protection: such buildings are free of harmful substances.
6. Structural stability: earthquake resistance, wind resistance and snow resistance.
7. Others such as waterproof, heat insulation and energy saving.
The Prefab House produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. has been exported to several countries. And there are several offices in the country, which is convenient for domestic customers to maintain. Based on technological innovation, their company constantly improves product quality and provides you with professional Prefab House.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Introduction of Product:
Steel structure building has a history of several decades in Europe and the United States. It develops rapidly with the
advantages of good seismic resistance, environmental protection and rapid installation. After more than 20 years of
steady development, xinguangzheng steel structure has continuously improved the "turnkey" ability of steel structure
product project from design, construction to decoration completion, providing systematic solutions for enterprises.
Take xinguangzheng apartment building as an example to show the new face of industrial enterprise apartment building.
Xinguangzheng steel structure apartment building
Project structure system:Steel structure light steel structure
Project area:270 square meters
Project size:20*13.5*16m
Project detail: The whole apartment building has 5 floors, from the foundation to the external wall insulation, including water and
electricity system and decoration, are all completed by xinguangzheng steel structure, and equipped with independent
energy-saving central air conditioning.
One is the staff dining room, the other is cement foam board for maintenance. The two - five story is the employee dormitory, the
two outer wall maintenance material is the cement foam board, and the three to five layers of external wall maintenance material
is composite board. There are 4 suites on each floor. The bathroom and toilet of each room are independent rooms. The specific
configuration is 2 rooms, 1 kitchen, 1 hall,1 bath and 1 toilet.
Step 1: Cutting
Cut steel plate into pieces and connections by flame cutting machines (CNC, Semi-automatic flame cutting machines). Long strips will be used as web and flange plate, connections will be used as connected, reinforced or stiffening plate.
Step 2: Assembly
Combine web and flange plate together through H-beams assembly machine, make tack welding. Keep the web plate in the middle line, do not be off the center line.
Step 3: Gantry automatic submerged arc welding
Make welding by gantry submerged arc welding machine. Make sure the welding sequence and reduce the welding deformation.
Step 4: Flange plate of straightening
Start straightening on welding-finished H steel beams by straightening machine.
Step 5: Connections process
Make holes on connected pieces by drilling machines. Make sure the hole size and precision.
Step 6: Welding
Welding with CO2. Make sure the weld quality without welding flaw.
Step 7: Shot blasting
Make shot blasting on steel profiles. Make sure the blasting grade and quality.
Step 8: Spray painting
Painting or other anti-corrosion surface treatment.
Step 9: Package & Loading
Pack steel structure profiles on steel pallet, which will be easy for loading, transportation and unloading jobs.
Introduction of Maldives Prefabricated Steel Structure Construction Mall Building Hardware Store:
Project Area: 3323 ㎡
Project Date: 2017
Project Detail: Six-story steel structures, 100mm fiberglass wool sandwich panel for roof and Glass Curtain +Aluminum Wall Cladding for outer wall and 75mm rock wall sandwich panel as inter wall. The fireproof grade is grade 2, and the fireproof coating is indoor thin fireproof coating.
Effect picture of Maldives Prefabricated Steel Structure Construction Mall Building Hardware Store :
Company information
Qingdao Xinguangzhegn steel structure group company has 1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.