What is the purpose of isolation?
The purpose of isolation is to cut off the route of transmission in the infection chain,protect susceptible persons, and ultimately control or eliminate the source of infection.
Therefore, it is an important measure to prevent the spread of infectious diseases.
From a medical point of view, the goal of "isolation" is to prevent the spread of infection and ultimately eliminate or control the source of infection.
That is to prevent and limit the infectious factors of infected patients directly
or indirectly to susceptible persons,
or to those who may pass on such factors to others, and at the same time, enable infected patients to receive timely treatment under control and return to health as soon as possible.
Why choose container house?
In the construction field, it is called an assembled modular container house, also known as a container building or a container house.
It is a single room as a prefabricated unit.
The external wall panels and interior decoration of each unit are shipped to the factory after completion.
A building structure to be installed on site.
Compared with the traditional building structure, the container house has the following advantages:
(1) Convenient transportation, installation and movement, flexible combination;
(2) The cost is low and it can be completed quickly;
(3) The house can be recycled, and no construction waste is generated during use;
(4) The interior is completely renovated and can be used immediately.
Admittedly, it is precisely because of the advantages of rapid assembly and baggage check-in that the container house can be delivered to the Huoshenshan (Fire God Mountain) hospital within 10 days.
Steel building accessories has the advantages of overall light weight, saving foundation, less materials, low cost, short construction period, large span, safety and reliability, beautiful appearance and stable structure. Steel structure workshop is widely used in construction industries such as long-span industrial workshop, warehouse, cold storage, high-rise building, office building, multi-storey parking lot and residential house.
How to use the machine to remove the rust spots on the surface of Steel building accessories?
What are the main Steel building accessories?
How to remove the rust spots on the surface of Steel building accessories?
For Steel building accessories that have been used for a period of time, there are inevitably some attachments on the surface, such as rust, dirt, dust, old paint film, etc. Before painting the surface of Steel building accessories, if these attachments are not completely removed, although they can be temporarily covered after painting, they play a role of isolation, which makes the coating and the component substrate bond If the strength is severely reduced, the paint film will fall off prematurely, which will eventually reduce the corrosion resistance of the surface coating and fail to play the protective role of the coating. Therefore, before painting the surface of the component, the attachments on the surface of Steel building accessories should be thoroughly cleaned.
In order to improve the quality of rust removal and work efficiency. To improve the working conditions of construction workers, the current Steel building accessories derusting work has adopted a large number of wind-driven or electric small equipment. The main rust removal methods using equipment are:
(1) Angle grinder: This small pneumatic equipment is mainly used to clean flat areas. It can use sandpaper, grinding wheels and wire brushes as needed.
(2) Needle Bundle Derusting Machine: This kind of small pneumatic equipment is generally equipped with 30-40 needle bundles, which can be adjusted with different working surfaces, which are mainly suitable for curved, narrow, uneven and cracked places.
(3) Single-head cold air gun: This small pneumatic equipment is also called zinc knocking. It uses the impact of the knocking head to remove rust. The diameter of the shovel head is generally 25-40mm, and it can impact 1000 to 6000 times per minute. Suitable for relatively narrow places.
1. Two-hole connection accessories
One of the main accessories of Steel building accessories is the double-hole connection accessory, which is mainly used to connect with the corners. The corners on both sides of the right-angle connection can reduce the pressure on the alloy. At the same time, the recesses of the building materials can be based on the aluminum alloy frame.
2. Single hole connector
Steel building accessories also has an important accessory, the single-hole connector, which has a completely different function from the double-pipe connector. It is mainly used for the affinity connection between the aluminum alloy frame and the ground in the ground installation. Therefore, the single-hole connector has The role of anchor bolts.
The Steel building accessories have been widely used in daily life and industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. can provide the best Steel building accessories for their customers.
The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.
Project Area: 25000 sqm
Project Detail:
Xinguangzheng Prefabricated Steel Sports Stadium is single span maximum fish belly type box beam, the maximum span is 50 meters.
The maximum weights of a single piece is 109.5 tons
The web height of the maximum box member is 3.6 meters and the wing width is 0.9 meter.
The maximum thickness of the wing plate is 70m.
Project Spotlight:
The overall performance is a horn shape with great tension, and the architecturat form is landsccape architecture.
The roof of the building is full of greening, integrating the building with the park
The building is equipped with children's natatorium, basketball court, gym, study, culturalcenter and so on.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Steel building accessories is an ideal elastic body with good homogeneity and isotropy, which is most in line with the basic assumptions of general engineering mechanics; The material has good plasticity and toughness, can have large deformation, and can well bear dynamic load; Short construction period; It has a high degree of industrialization and can carry out professional production with a high degree of mechanization.
What are the Steel building accessories we often need?
What are the materials of Steel building accessories?
What should the construction personnel of Steel building accessories pay attention to?
1. Ceiling connection accessories
Ceiling connection accessories are also one of the important accessories of Steel building accessories. It is suitable for fixing accessories between the wall and ceiling connection accessories in the ceiling installation method. The ceiling connection accessories can be divided into different types according to the cable length and type. Different parts of the unit are used.
2. Branch chain plate accessories
Regardless of the installation method, the branch chain plate accessory is one of the necessary accessories, because it needs to connect the steel structure horizontally. This is the secondary reinforcement of the aluminum alloy frame. At the same time, straight chain plate accessories can also be used. To the role of integration and optimization.
1. Purchasing materials according to Steel building accessories design drawings. Steel materials, profiled steel plates, welding materials, high-strength bolts, insulation materials and other materials must meet the specifications, varieties, and performance required by the design, and have a material certificate. Welding electrodes, welding wires, fluxes, etc. should match the base metal. Make re-inspection records for the imported materials as required, and keep track of the use of main materials.
2. The steel is stored in a dry and dedicated place, and it is not allowed to store it in the open air.
3. For steel surface damage, after grinding and trimming, the local thickness reduction should not be greater than the rolling thickness tolerance.
4. Welding electrodes, wires, and fluxes should meet the relevant technical requirements of the current national standard and be compatible with the strength of the main metal.
1. Special procedures with complex technology, high difficulty and high precision should be completed by skilled and experienced personnel.
2. All types of welders engaged in structural production must pass the examination and obtain a certificate issued by the national agency accreditation department. The certificate indicates the content of welding and the expiration date.
3. The non-destructive testing personnel who check the quality of the welds shall hold the corresponding level range testing qualification certificate.
4. All positions personnel should hold a certificate to work.
Knowing this, do you also need to order Steel building accessories? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Steel building accessories with high quality for all customers from all over the world.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Pictures for Prefab Metal Workshop Steel Structure Construction Workshop House in Costa Rica
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients,we will supply different designs and steel products.In order to give you an exactly quotation and drawings, please let us know the following informations. We will quote for you promptly.
Basic design requirements of steel structure warehouse
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.
Cheap prefab structural steel warehouse prefabricated outdoor storage shed building design price steel structure warehouse