At present, the construction technology of large-space steel structure construction has made great progress, and the "folding and unfolding" construction technology is a construction method that fully expresses the changes in the construction process of large-span space construction. He turned a large structure into a movable mechanism; the industrial steel building is so popular nowadays mainly because its advantages surpass the previous buildings.
What is the meaning of industrial steel building?
What should I pay attention to when installing steel columns in industrial steel building?
What should be paid attention to when constructing industrial steel building?
The use of steel construction in industrial steel building has the advantages of shorter construction period, higher application rate, sensitive plan, column spacing and large span. As far as the owner is concerned, industrial steel building can shorten the investment construction period and work quickly. The components can be disassembled and re-applied, which promotes environmental protection and saves resources. Therefore, the application in modern industrial design is becoming more and more common.
(1) Due to the heavy weight and long length of the steel column, the industrial steel building cannot be manufactured and transported at one time. Therefore, the method of segmented manufacturing and on-site assembly as a whole is used for hoisting. It is planned to divide the steel column into two sections. The steel column is transported to the site in two sections, the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height in place is about 17 meters. A 50-ton truck crane can meet the hoisting needs, supplemented by a 25-ton truck crane for hoisting.
(2) The hoisting adopts single-machine rotary hoisting. Before lifting, padded wooden squares at the position of the steel column foot plate to prevent the steel column from damaging the foot plate during the lifting process. When the steel column is hoisted, the crane should lift the hook while turning the arm to make the steel column vertically off the ground and put the column into the mouth of the cup.
Ventilation: air exchange in indoor and outdoor areas. Put air vents on the metal roof.
Moisture resistant: Avoid condensation of water vapour in the lower layer of the metal roof and metal roof layer and drain the water vapour in the metal ceiling layer. The solution is to fill the metal roof with thermal insulation cotton, place a waterproof membrane on the metal floor plate and have ventilated knots on the metal roof.
Carrying: construction load, rain, dust, snow pressure, maintenance load. The load bearing capacity of the metal roof depends on the cross-section characteristics of the plate type, the strength and thickness of the material, the power transfer method and the distance of the horses (sub-horses).
Lightning protection: Take the lightning to the ground to prevent the lightning from penetrating the metal roof and entering the room.
After reading this, do you have a better understanding of industrial steel building?? If you want to know more about related products, you can come to the website of Qingdao Xinguangzheng Steel Structure Co., Ltd., they will provide the most considerate service and the highest quality industrial steel building?.
Introduction of Ethiopian Prefabricated steel structural water bottling processing workshop
Located: Ethiopia
Construction area: 2000㎡
Cladding: 0.5mm galvanized sheet (No insolution)
XGZ provide design,fabrication and installation guidance as client's required.
Company information of Ethiopian Prefabricated steel structural water bottling processing workshop
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one
hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global
valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Generally speaking, the installation procedures of industrial steel building include installation of steel columns, installation of inter-column supports, temporary installation of steel crane beams, roof beams, roof supports, steel crane beams, etc., correction, fixation, and structural installation of maintenance.
What is the specific process of industrial steel building construction?
How to regularly maintain industrial steel building?
How to consider the cost of industrial steel building construction?
1. Lifting the main structure of industrial steel buildings: connecting steel carriers on the ground, erecting steel columns, lifting steel carriers, connecting secondary structures, correcting the deviation of the main structure, installing crane carriers (optional), lifting intermediate layers (optional), and coating with fire resistant paint pack.
Main control quality: The deviation of the main structure should meet the specifications and design requirements and the initial and final application of high-strength screws should meet the requirements.
2. Installation of secondary structure: roofing posts, roof wall supports, flange supports, etc.
3. Laying of roof plate and insulation layer: first lay insulation layer, then assemble roof plate (in some projects a position of steel fabric is also placed under the insulation layer to prevent a fall of the insulation layer, this mainly depends on insulation layer level)
Main quality control: The roof is mainly waterproof, therefore the plate should be covered with the plate, the nail position, the glue coating should be full or not, the glue should be wiped clean and the coating on the surface of the plate should not be damaged to rust etc. to avoid.
industrial steel building wall maintenance and installation: mainly the installation of wall insulation and wall panels.
The main quality control of industrial steel building: the wall is mainly an aesthetic problem, and a window area is waterproof. There is also the problem of installation deviation. For example, the bottom should be flat, the entire plane should be flat, the flatness deviation between the board and the board should meet the requirements, and so on.
The detailed structure of the industrial steel building: mainly the installation of some trims, such as the wrap angle between the roof and the wall, the wrap angle at the corner of the wall, the flooding board between the wall panel and the brick wall, the door and window trim, etc.
The price of industrial steel building can only be compared with certain basic conditions, such as whether it is imported or domestic color panels, its thickness, coating; insulation material and thickness; whether there is a skylight; workshop bays and spans; whether there are cranes, crane tonnage, Many factors such as the level of the work system are related, and the impact of the price difference in other regions and the qualification level of the construction unit cannot be ignored.
The industrial steel building has achieved an irreplaceable position in industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing different kinds industrial steel buildings of high quality for all customers from all over the world.
Qingdao Activa Group is the largest outdoor leisure products R & D and production enterprise in the world. It has established factories and branches in 14 countries and regions. Currently, it has five hundred year brands in its industry, and 1820 patents at home and abroad. The first phase project of Qingdao Activa Group, which is contracted by our company, has a total construction area of over 80000, which is the general contracting project.
Generally speaking, Steel building accessories include: steel column systems, steel beam systems, support systems, connection systems, purlin systems, and brace stairs. This is a part and an indispensable part of every steel structure project.
What are the advantages of using Steel building accessories?
How to paint Steel building accessories?
What may cause the deformation of Steel building accessories?
1. Health
In the process of using Steel building accessories, dry construction is used to reduce the environmental pollution caused by waste. The Steel building accessories of the house can be 100% recycled, and most of other supporting materials can also be recycled, which is in line with the current awareness of environmental protection; All materials are green building materials, which meet the requirements of ecological environment and are conducive to health.
2. Comfort
The wall is built by Steel building accessories, and the high-efficiency energy-saving system is adopted, which has breathing function and can adjust the dry humidity of indoor air; The roof has ventilation function, which can form a flowing air room over the house to ensure the ventilation and heat dissipation requirements inside the roof.
3. Fast
All dry operations shall be carried out without being affected by environmental seasons. A building of about 300 square meters only needs 5 workers and 30 working days to complete the whole process from foundation to decoration.
4. Environmental protection
Materials can be 100% recycled, truly green and pollution-free.
5. Energy saving
All adopt high-efficiency and energy-saving walls, with good thermal insulation, heat insulation and sound insulation effects, which can reach the energy-saving standard of 50%.
(1) Method of painting construction:
There are two commonly used methods in Steel building accessories maintenance engineering, namely, painting method and spraying method.
(2) Matters needing attention:
1) The base layer should be thoroughly cleaned before painting, and kept dry, and the first coat of primer should be applied as soon as possible within no more than 8h.
2) When applying the primer, choose an appropriate painting method according to the size of the area.
3) When painting the top coat, it should be painted according to the color and variety requirements of the design, and the painting method is the same as the primer painting method.
4) Painting environment
5) The thinner should be used correctly.
(1) The actual dynamic load of Steel building accessories exceeds the maximum load (commonly known as "overload") allowed during the design of the steel structure.
(2) Bearing the impact of dynamic load for a long time.
(3) The impact of natural disasters (such as earthquakes) or uneven settlement of foundations.
(4) Improper use and maintenance or breakage of Steel building accessories due to mechanical damage and withdrawal from work, resulting in an abnormal deformation of the steel structure due to unbalanced forces.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is known for high precision Steel building accessories. And you can connect them.
Prefab House is a house constructed by industrialized production methods. It is a house constructed by prefabricating part or all of the components of the house in the factory and then transporting it to the construction site. The components are assembled through reliable connections.
What are the characteristics of Prefab House?
What are the actual advantages of Prefab House?
What is the significance of the appearance of Steel Structure Prefab House?
1. Prefab House is estimated to be about 30% faster than conventional construction methods.
2. The safety of the Prefab House is perfectly fine, since the finished steps, external walls etc. are transported to the construction site but also have to be covered instead of easy connection with steel concrete. Steel rods run through each floor, and the structure of the house is very strong.
3. Compared to traditional built houses, Prefab House has a higher component precision that can minimise frequent quality problems such as wall friction and leakage and can improve the general level of safety, fire resistance and durability of the house. It uses a light partition system and the owner can change the decoration as needed.
4. Prefab House is more energy-saving and environmentally friendly when used in the home, e.g. a new type of thermal insulation layer that has a better thermal insulation effect. When a household measurement is implemented and the heating has the same temperature, the room temperature of the "assembled" space is higher. The head of household may consider lowering the heating temperature, saving heating costs and, at the same time, reducing energy consumption.
1. The space layout of Prefab House is flexible.
2. The construction process of Prefab House is environmentally friendly and sustainable.
3. The structure of Prefab House has light weight and high bearing capacity.
4. Prefab House has excellent quality and superior seismic performance.
5. Prefab House can realize the industrialization and industrialization of residential construction, and the construction period is short.
6. Prefab House is very economical and applicable.
For a long time, the construction of houses is dominated by concrete structures. Concrete structure houses mainly use on-site manual wet work. There are problems such as low production efficiency, long construction period, high energy consumption, serious pollution, difficult to guarantee quality and performance, and short life cycle. Around the 1990s, the development of steel structures began. The appearance of Steel Structure Prefab House is a major contribution to our human habitation, reducing the pressure on the living environment. Over the years, housing construction data show that the amount of construction waste has accounted for nearly 40% of the total urban waste.
Qingdao Xinguangzheng Steel Structure Co., Ltd., which has been established for over ten years, focuses on the production of Prefab Houses. Here, you can find the Prefab Houses you need.
Specification
Project address: Argentina
Area: 5930m2
Time: 2009
Introduction: the project covers a total area of 5930 square meters, with three attached spans in the main workshop and eight two ton cranes. The construction started in October 2009, and the project site is not suitable for canuelas in North Aires, Argentina. It took more than two months to complete, and the project is in good condition at present.
We supply designing, manufacturing and installationabout the whole steel structure workshop building project.
Detail Information
Roof with a single layer of galvanized steel plate sea blue crown Island, its structure and technical requirements are as follows:
1.V820 type 0.50mm thick galvanized roof panel (sea blue) crown Island
2.75mm thick glass wool with aluminum foil
3.200 * 200 coated steel mesh
4.Q235B C-type steel roof purlin
5.Q345B steel beam
Wall:
1.YX-840 plate type 0.40mm thick galvanized wall panel white gray crown Island
2.Q235B C steel wall purlins
3.Q345B steel column
Paint coating:
1. Shot blasting, rust level Sa2.5
2. In the gray anti-corrosion primer two, each 30 um
other:
1. Roof panel - sea blue
2. Wall panel - white gray
3. Steel components - medium gray