Industrial steel building is a great invention. All components are prefabricated in the factory, and the site only needs to be assembled simply, thus greatly shortening the construction period. For a building of 6000 square meters, the basic installation can be completed in only 40 days.
What should I pay attention to when using Industrial steel building?
What are the reasons why Industrial steel building is used more and more widely?
What are the steps involved in the general process of Industrial steel building installation?
1. Industrial steel building construction has strict requirements for construction measurement. When the steel structure workshop stops the structural calculation, the mechanical model is very clear, and the size change has an obvious influence on the model. Therefore, during the manufacturing and installation stages, construction measurement is a more important issue. For example, inaccurate blanking will result in deformation of components; failure to be placed in place during installation will affect the load-bearing effect of the environmental characteristics of the construction site welding of steel structure workshops.
2. The steel of Industrial steel building has the characteristics of thermal expansion and contraction, and it is sensitive to weather, temperature and other conditions during the installation process. Industrial steel building welding has its own special technical requirements. In practice, when natural conditions cannot meet the work requirements, manual measures are often taken to create conditions for construction, such as preheating of welding rods and preheating and heating of steel plates. If the size of the steel structure factory building changes greatly during the construction process, the temperature is too high or too low will affect the accuracy of the device.
3. The Industrial steel building is easy to rust and has poor fire resistance, so it needs to be painted and maintained. Paint the steel structure factory building fireproof coating on the exterior of the Industrial steel building to play the role of fire protection and heat insulation maintenance, to prevent the steel from rapidly heating up in the fire and reducing its strength, and to prevent the steel structure factory building from losing its support ability and causing the building to collapse.
The grid structure of Industrial steel building has the advantages of reasonable stress, large stiffness, light weight, single member and convenient fabrication and installation. In recent years, it has been widely used in public and industrial buildings with large span and large column network. It can be used not only for roof structure, but also for floors, walls and special structures.
1. The main structure hoisting of Industrial steel building,
2. Secondary structure installation of Industrial steel building,
3. Installation of roof panel and insulation layer of Industrial steel building,
4. Wall maintenance and installation,
5. Finally, the detailed structure of Industrial steel building.
After reading this, have you also had the idea of ordering Industrial steel buildings. At Qingdao Xinguangzheng Steel Structure Co., Ltd., you can get the best quality Industrial steel buildings and the most intimate after-sales service.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Prefab House refers to the use of industrial production methods to build houses, that is, the stairs, exterior walls, balconies, air-conditioning panels, etc. of the house are all prefabricated in the factory outside the construction site, and then shipped to the construction site for "assembly", and the interior of the house will be refined at one time. Handed over after renovation. That is, the huge external walls, stairs, and balconies from the factory are "assembled" on the construction site into houses and buildings.
What are the advantages of a Prefab House?
What are the structural types of Prefab Houses?
What should we be careful about when selecting a Prefab House?
1. Safe and reliable
The Prefab House with steel as the main building material has a high capacity per volume unit, is more stable and solid than the traditional brick and brick concrete technology, has a better seismic performance, wind resistance, water density and refractory performance and also has thermal insulation and sound protection functions. Steel has good ductility and can better use the energy brought in by earthquakes, so it has good seismic performance and a high structural security t hat guarantees the safety of stay.
2. Easy construction and short construction time
All components are prefabricated in the factory and only have to be installed on site, which greatly shortens the construction cycle. A 6000-square-metre-long building can basically be installed in 40 days.
1. Structural system
The structure of the Prefab House can be divided into: steel frame system, steel frame support system, steel frame-core tube system, steel frame-module-core tube system and steel frame-shear-wall system. With the continuous development of the technology, newer steel construction systems will also appear.
2. Peripheral protection system
The outer protective system of the Prefab House can be divided into blocks, plates, cans and other types.
3. Internal system
Traditional construction has many disadvantages. For example, the traditional rough decoration method does not separate the interior system and the structural system, which makes it difficult to adapt to the modern development of the housing industry; the house technology lines are not separated and the water and power lines are buried in the support layer, which the "century residence" cannot realize." The waste of social resources is serious.
1.The costs are relatively higher than in the traditional Prefab House made of brick concrete and concrete.
2. The steel structure of the Prefab House, with its unique steel structure, walls, roofs and other materials, as well as the standardized and final internal distribution and support facilities, is difficult to adapt to the habits of people "arbitrarily handling the house".
3. Corrosion of steel: Al-galvanized steel must be used for maximum corrosion protection and the main steel structure can reach fifty years.
4. There are many requirements for new materials. The structure of steel houses is equipped with materials such as thermal insulation and heat protection, usually using new lightweight materials.
Prefab Houses produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. feature attractive appearance, excellent performance, user-friendly operation, easy maintenance, and internationally advanced performance indicators, and are exported to more than 10 countries and regions.
The advantages of industrial steel building are high seismic performance, good fire resistance, short construction period, and durability. Compared with traditional factory buildings, industrial steel building has improved a lot, so it is strongly welcomed by the market.
What are the types of single-structure industrial steel building?
What are the advantages of single-structure industrial steel building?
What are the advantages of industrial steel building construction?
1. From the height:
The height of the drip level of a single-storey factory building is very important. Some factory buildings are 4-5 meters high, some are 6-7 meters, and some can be as high as 11-12 meters or higher. Generally, the taller the factory building, the more difficult it will be to build, and the more expensive the material costs will be.
2. From the external building structure:
Simple iron sheet: It is the simplest, a factory built with iron sheet relatively freely.
Steel structure workshop: The steel structure workshop is divided into steel structure or ordinary steel structure. Color steel structure is more than ordinary
much better.
Concrete structure: The wall is built with bricks and the roof is sealed with concrete. This structure has better safety and heat insulation than the previous two.
3. From the internal structure:
It is divided into those with corbels and those without corbels. Only the workshops with corbels can install cranes (also called cranes). This is an important part of industrial production. If there are machinery and equipment to install cranes, just Must have corbels to use.
industrial steel building has the characteristics of forming a large space for use, easily meeting the requirements of the production process, and convenient internal transportation organization, which is conducive to the placement of heavier production equipment and products, and can realize the industrialization of the production of plant building components and the mechanization of on-site construction. Therefore, industrial steel building has been widely used in industrial buildings such as metallurgy, machinery manufacturing, motor manufacturing, chemical and textile industries. Common structural forms of reinforced concrete single-story factory buildings include bent frame structure and rigid frame structure.
1. industrial steel building has good structural performance, light weight, high strength, and good seismic performance.
2. The steel used in industrial steel building is recyclable, which is more energy-efficient and environmentally friendly than masonry and concrete.
3. The industrial steel building is processed by the factory, so the quality of the industrial steel building is guaranteed.
4. industrial steel building materials have light weight and low base cost.
5. The on-site construction period of industrial steel building is short. There is basically no wet work on site, and no dust, sewage and other pollution will be generated.
6. The cross-section of structural components is small, the pillars are very thin, the walls are very thin, and the building area is large.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been committed to providing customers with reliable industrial steel buildings and perfect after-sales service so that customers can invest easily, use them with confidence, and have no worries.
Qingdao Activa Group is the largest outdoor leisure products R & D and production enterprise in the world. It has established factories and branches in 14 countries and regions. Currently, it has five hundred year brands in its industry, and 1820 patents at home and abroad. The first phase project of Qingdao Activa Group, which is contracted by our company, has a total construction area of over 80000, which is the general contracting project.
The development of residential steel building conforms to the industrial technology policy of protecting arable land and saving energy, and is also one of the production methods for realizing residential industrialization. The development of steel structure housing is the general trend.
What is the layout of the residential steel building?
What issues should be paid attention to when designing residential steel building?
Why pay attention to the design of residential steel building?
residential steel building’s column grid layout should be regular, and it is advisable to use residential units or sleeves as the unit to achieve modularity. The modular flat connection, wrong connection and symmetrical concave (convex) connection and other splicing adapt to changes in the overall layout .
When the residential steel building module adopts small column net, it should be combined with the floor and pipeline design; when the module adopts large column net, the facility pipeline should be designed as a fixed-positioned tube bundle, and the electrical and communication lines can be along the cavity and skirting of the partition wall. , Mirror hanging line or top line arrangement.
The kitchen and bathroom are located close to the concrete core tube or concrete shear wall, and avoid steel structure load-bearing components to facilitate the fire prevention and anti-corrosion treatment of steel components.
Vertical pipelines are centrally arranged in pipeline wells or pipeline walls, or installed on site using factory prefabricated tube bundles.
The toilet is drained on the same floor. Use a double pipe system for centralized heating, and use a temperature control valve and a heat meter. Use the equipotential characteristics of the steel structure to make a natural ground connection.
residential steel building should be dominated by construction and design, and other professions should interact closely with each other. In addition to following the general principles of residential building design, residential steel building must also focus on solving:
(1) How to make use of the advantages of steel structure? The beam span can be enlarged, the bays can be more flexible, and more space can be created for residents. But how to avoid the flatness and monotonous facade of the building caused by the steel structure.
(2) It is necessary to solve the fire protection and anti-corrosion problems of steel structure residential buildings. Especially in rainy areas, the quality of anti-corrosion and anti-rust work directly affects the promotion of steel structure housing.
The cost of residential steel building is the most concerned issue of real estate developers. Steel structure residences should be positioned in middle and high-end residences. Steel structure residences are a systematic project. Management and coordination should be strengthened from design, manufacturing, transportation, installation, maintenance and management, so as to reduce costs and improve overall economic benefits. the goal of.
Qingdao Xinguangzheng Steel Structure Co., Ltd. strives to provide top-quality residential steel buildings with reasonable prices, efficient production time, and the most professional customer service.
Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
Introduction of Pakistan Prefabricated Steel Structure Construction Chemical Factory
Project Area: 4225 ㎡
Project Finished Time: Built in 2019-2020
Project Location: Lahore
Project Detail: Multi-story steel structures
Project Total Steel weight: 600 tons.
Company information of Pakistan Prefabricated Steel Structure Construction Chemical Factory
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.