Industrial steel building is easy to move and recycle without pollution. These are stronger than traditional workshops, and the walls of the steel structure workshops can also be filled with bricks, which are completely load-bearing. All future plant constructions will be steel structure plants. Here we are going to introduce the steps of installing Industrial steel building.
What are the raw materials used in industrial steel building?
What is the main installation process of industrial steel building?
What is the production and installation process of industrial steel building?
In addition to iron and carbon, the raw materials of industrial steel building also contain other elements. Divided into permanent elements; occasional elements; hidden elements and alloying elements. The common elements are manganese, silicon, sulfur, and phosphorus. Incidental elements are due to the different origins of ore (there are intergrowth ore mixed with iron) and scrap steel as raw materials, such as copper, titanium, vanadium, rare earth elements, etc., are brought into steel during smelting and process operations. The cryptic elements refer to non-metal elements with a small atomic radius, such as oxygen and hydrogen. Alloying elements refer to elements specially added to change the composition, such as chromium, nickel, tungsten, molybdenum, vanadium, etc.
Carbon steel (referred to as carbon steel) is an iron-carbon alloy with a carbon content of more than 0.0218% and less than 2.11%. Because carbon steel has good mechanical properties and process properties, and is large in output and low in price, it is a metal material that is widely used in mechanical engineering. However, carbon steel also has some shortcomings, such as low hardening energy, poor temper softening resistance, and low yield ratio. The strength potential of carbon steel cannot be fully utilized even after heat treatment. In order to meet the continuous development of modern industry and science and technology, alloy steel was developed.
Foundation → production and installation foundation is divided into (foundation ground survey → foundation excavation → embedded screws → foundation casting → later foundation grouting → outdoor water dispersion → outdoor drainage ditch (some factory design indoor drainage ditch or cable ditch suggestion Completed simultaneously with installation)→Enclosure masonry→tiling tiles, etc.)
The production and installation are divided into (processing production→component painting→structural pre-assembly→steel component hoisting→main structure adjustment→purlin installation→door and window column installation→gutter downpipe installation→steel component painting (some are fireproof, some are Anti-corrosion, according to design requirements) → roof panel (some with steel mesh, some with insulation layer, completed at the same time) → wall panel installation → door and window installation → water supply and drainage installation → electrical equipment installation)
Qingdao Xinguangzheng Steel Structure Co., Ltd., as a Chinese pioneer in producing Industrial steel buildings, can ensure the products’ quality and the after-sales service.
Steel building accessories are constructed of steel materials. It is one of the main types of building structures. The structure consists mainly of steel bearings, steel columns, steel joints and other components made of profile steel and steel plates and uses rust removal and rust protection methods such as silylation, pure manganese phosphation, water washing and drying, galvanizing and so on.
Prefabricate and assemble Steel building accessories on the steel platform according to the installation sequence and process requirements to ensure the welding quality.
The spacing between the splicing joint of flange plate and web plate of section steel shall be greater than 200mm. The splicing length of flange plate shall not be less than 2 times of plate width; The web splicing width shall not be less than 300 mm and the length shall not be less than 600 mm.
In order to facilitate welding and ensure welding quality, the stiffener plates, connecting plates, base plates and cantilever beams (beams) on columns and beams shall be assembled and welded on the ground steel platform according to the dimensions of the construction drawing.
The Steel building accessories prefabricated on the steel platform shall not only be fabricated and assembled according to the construction drawings and specifications, but also consider the process of on-site installation and the change of installation size.
Some Steel building accessories users do not know that steel structures still need to be maintained and maintained. As a result, there is serious corrosion that users often can't find out, which makes steel products appear many unsafe hidden dangers, reduces the safety of Steel building accessories in use, and even affects normal use functions. It is recommended that the design unit not only put forward the painting requirements of the steel structure in the painting design description of the steel structure, but also put forward the maintenance and maintenance requirements of the Steel building accessories according to its use.
There are many ways to prevent Steel building accessories from rusting, and the following are usually used.
The steel structure is made of alloy steel that is not easy to rust
Chemical oxide layer protection method
Using metal coating protection method
Non-metallic coating protection law
In the later maintenance and maintenance process, non-metallic coating protection method is especially commonly used. The surface of the component is protected by paint and plastic, so that it does not contact the surrounding corrosive medium, so as to achieve the purpose of anti-corrosion. This method has good effect, low price, and has a wide range of paint varieties, a wide range of options, and strong applicability. It is not limited by the shape and size of the component. It can form a film with any shape on the surface of the component. The adhesion is firm. It can also follow the temperature change. The components are telescopic and easy to use. It is also possible to give the component a beautiful color.
Great products begin with the best engineering staff, and Qingdao Xinguangzheng Steel Structure Co., Ltd. is ready to assist you with your technical requirements for Steel building accessories.
Pictures for Prefab Metal Workshop Steel Structure Construction Workshop House in Costa Rica
Drawings & Quotation
1) Customized design is welcomed.
2) We have an excellent design team. According to the requirements of different projects and clients,we will supply different designs and steel products.In order to give you an exactly quotation and drawings, please let us know the following informations. We will quote for you promptly.
Basic design requirements of steel structure warehouse
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.
Cheap prefab structural steel warehouse prefabricated outdoor storage shed building design price steel structure warehouse
Industrial steel building has a wide range of applications and can be used in factories, warehouses, office buildings, stadiums, hangars, etc. to be used. It is suitable not only for single-storey large-space buildings, but also for the construction of multi-storey or high-rise buildings.
What are the architectural features of industrial steel building?
What is the reason why more and more people are choosing industrial steel building?
What types of construction are available for industrial steel buildings?
Insulation: Avoid heat transfer on both sides of the metal roof to ensure that the ambient air temperature is stable. The thermal protection function is realized by filling thermal protection materials (usually used glass wool and stone wool) under the metal roof plate. The heat conservation effect is expressed by the U-value and the unit is W/M2K. The thermal insulation performance is determined by the following factors: raw material, density and thickness of the thermal insulation cotton; the humidity of the thermal insulation wall, the method of connecting the metal roof plate and the underlying structure (to prevent the phenomenon of the "cold bridge"), the repeated ability of the metal coating to heat radiation.
Daylight: Improve indoor lighting during the day by means of skylights and save energy. When installing daylight panels or daylight glass at certain positions on the metal roof, the duration of the daylight should be adjusted to the metal ceiling panel and the connection between the daylight and the metal ceiling panel should be treated watertight.
Beautiful: The metal roof of the industrial steel building has a good texture and a pleasant color.
Check the heat expansion and contraction: check the contraction shift and direction of the metal roof plate. Make sure that in areas with high temperature differences the metal roof plate is not damaged by heat expansion and contraction.
Anti-avalanche: install snow barriers on the metal roof in snow-covered areas to prevent a sudden fall of snow.
Anti-ice caps: industrial steel building can prevent rain and snow from forming ice caps on the mould.
The frame of the industrial steel building is the main structure of the system frame. It is a flat structure consisting of columns and frames. All horizontal water loads and most vertical loads are transferred to the foundation via the plant frame. In industrial buildings, the industrial steel building frame has the following three most common types of construction;
1. The single-storey steel structure factory building frame is a single-storey frame formed from the stacked column of the factory building and the frames anchored to the top of the column (the column top can be called the system bent when the column top is foldable).
2. A rigid one-storey frame, a one-storey frame formed by a rigid connection of columns with an equal or gradual cross-section and frames on the top of the column.
3. Multi-layered frame, a multi-layered frame formed by joining columns and floor supports (or specialist works) and roof supports or roof supports.
Having learned so much about industrial steel building, it is also a difficult problem to select from many manufacturers the one with high quality and low price. Qingdao Xinguangzheng Steel Structure Co., Ltd. has been a Chinese pioneer in industrial steel building for several years. You can work with customers from design to completion to ensure that all technical requirements are met.
Agricultural steel building components or parts are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in various fields of agricultural production. Steel structure is easy to rust. Generally, steel structure needs to be derusted, galvanized or painted, and it needs to be maintained regularly. Here we are going to know more about the Agricultural steel building.
What are the architectural characteristics of Agricultural steel buildings?
What are the appearance characteristics of Agricultural steel building?
What should be paid attention to when constructing Agricultural steel building?
1. Industrialization of the production process. The steel structure is only connected by high-strength bolts. It also has the advantages of quick installation and return on investment.
2. Use high-quality materials with high toughness and plasticity. The quality is safe and reliable.
3. It also has the advantages of flexible design and decoration, low cost, and various colors.
The Agricultural steel building has no beams and no purlins, wide space, large spanning capacity, and the span of 6-32 meters can be chosen at will. Low cost, low investment, economical. The design and construction period is short,
The roof construction of Agricultural steel building can be completed in 20 days. Colored galvanized steel sheet, mechanical seam connection, natural waterproof, no leakage.
The Agricultural steel building is beautiful in appearance, sturdy and durable, and requires no maintenance.
The Agricultural steel building is light in weight, the overall structure is scientific and reasonable, and the wind and seismic performance is superior. Wind resistance and snow load, can withstand strong winds of 160km/n per hour, and can withstand a snow load of 148kg.
The shape of Agricultural steel building is beautiful, colorful, novel and full of rhythm. Rich and diverse roof forms give the building a new appearance.
The Agricultural steel building has complete functions, the roof slab and beam are integrated, and it integrates multiple functions such as heat preservation, heat insulation, ventilation, and lighting.
1 Personnel engaged in high-altitude operations must hold a certificate to work, and earnestly abide by the safety construction regulations, wear flexible clothing, and it is forbidden to wear hard-soled and slippery shoes with nails;
2 Workers of Agricultural steel building wear safety belts;
3 A safety net is set under the working surface of Agricultural steel building;
4 Materials for high-altitude operations should be stacked steadily. They should not be placed on the edge or attached to the opening of the hole. If there is a possibility of falling, they should be withdrawn or fixed in time to prevent falling objects from injuring people.
The Agricultural steel buildings made by Qingdao Xinguangzheng Steel Structure Co., Ltd. feature attractive appearance, excellent performance, easy maintenance, and internationally advanced performance indicators, and are exported to more than 10 countries and regions.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Industrial steel building mainly means that the main load-bearing components are composed of steel. Including steel pillars, steel beams, steel structure foundations, steel roof trusses (of course, the span of the factory building is relatively large, and it is basically steel structure roof trusses now), steel roof, note that steel structure walls can also be surrounded by brick walls.
What are the characteristics of Industrial steel building?
What are the industrial characteristics of Industrial steel building?
Why do we have to carry out daily maintenance on Industrial steel buildings?
The characteristics of the steel construction workshop are:
1. Industrial steel building is light, high-strength and has a large span width.
2.The construction time of industrial steelworks is short, reducing investment costs accordingly.
3. Industrial steel buildings have poor fire resistance and corrosion resistance and steel structures should not be used in areas with low temperatures.
4. Industrial steel building is easy to move and recycle without contamination.
Impact
The roofs of flat buildings are mostly inclined roofs, so that the roof construction essentially uses a triangular roof chair system made of cold-formed steel components. The light steel components form a very strong structure after sealing the building plates and plasterboard plates. "Plate-rib structural system", the industrial steel structure of this structure has a stronger earthquake resistance and resistance to horizontal loads and is suitable for areas with earthquake intensities above 8-degree.
Air resistance
The Industrial steel building has a low weight, a high strength, a good overall stiffness and a strong deformability. The building weighs only a fifth of the brick concrete construction and holds a hurricane of 70 meters per second so that life and property can be effectively protected.
Durability
The housing structure of the Industrial steel building consists entirely of cold-formed thin-walled steel component systems. The steel frame consists of a high-strength, cold-rolled, fire-soaked super-corrosion protection sheet which effectively avoids the influence of steel sheet corrosion during construction and use and increases the durability of light steel components. The durability of the structure can reach 100 years.
Industrial steel buildings must be regularly cleaned and maintained. Under normal circumstances, it must be inspected and maintained once a year. When cleaning the outer wall of the Industrial steel building, you must be careful not to contaminate anything. Do not use steel wire balls, brushes and other abrasive cleaning agents. If you use clean water, you should rinse from top to bottom. The branches, leaves and similar objects on the Industrial steel building should be cleaned in time to avoid unnecessary problems due to the delay. If the surface of the metal plate for industrial steelmaking is damaged, it should be repaired in time to prevent the surface of the metal plate from corroding by sun and rain. If necessary, use all coated high-elastic nanomaterials to protect the metal roof plate, act effectively in thermal insulation and sealing and save energy for room climate.
Seeing this, do you also want to order a Industrial steel building? If necessary, you can contact Qingdao Xinguangzheng Steel Structure Co., Ltd. they will provide the Industrial steel building of the best quality.
Generally speaking, the installation procedures of industrial steel building include installation of steel columns, installation of inter-column supports, temporary installation of steel crane beams, roof beams, roof supports, steel crane beams, etc., correction, fixation, and structural installation of maintenance.
What is the specific process of industrial steel building construction?
How to regularly maintain industrial steel building?
How to consider the cost of industrial steel building construction?
1. Lifting the main structure of industrial steel buildings: connecting steel carriers on the ground, erecting steel columns, lifting steel carriers, connecting secondary structures, correcting the deviation of the main structure, installing crane carriers (optional), lifting intermediate layers (optional), and coating with fire resistant paint pack.
Main control quality: The deviation of the main structure should meet the specifications and design requirements and the initial and final application of high-strength screws should meet the requirements.
2. Installation of secondary structure: roofing posts, roof wall supports, flange supports, etc.
3. Laying of roof plate and insulation layer: first lay insulation layer, then assemble roof plate (in some projects a position of steel fabric is also placed under the insulation layer to prevent a fall of the insulation layer, this mainly depends on insulation layer level)
Main quality control: The roof is mainly waterproof, therefore the plate should be covered with the plate, the nail position, the glue coating should be full or not, the glue should be wiped clean and the coating on the surface of the plate should not be damaged to rust etc. to avoid.
industrial steel building wall maintenance and installation: mainly the installation of wall insulation and wall panels.
The main quality control of industrial steel building: the wall is mainly an aesthetic problem, and a window area is waterproof. There is also the problem of installation deviation. For example, the bottom should be flat, the entire plane should be flat, the flatness deviation between the board and the board should meet the requirements, and so on.
The detailed structure of the industrial steel building: mainly the installation of some trims, such as the wrap angle between the roof and the wall, the wrap angle at the corner of the wall, the flooding board between the wall panel and the brick wall, the door and window trim, etc.
The price of industrial steel building can only be compared with certain basic conditions, such as whether it is imported or domestic color panels, its thickness, coating; insulation material and thickness; whether there is a skylight; workshop bays and spans; whether there are cranes, crane tonnage, Many factors such as the level of the work system are related, and the impact of the price difference in other regions and the qualification level of the construction unit cannot be ignored.
The industrial steel building has achieved an irreplaceable position in industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing different kinds industrial steel buildings of high quality for all customers from all over the world.