Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
Steel building accessories has the advantages of overall light weight, saving foundation, less materials, low cost, short construction period, large span, safety and reliability, beautiful appearance and stable structure. Steel structure workshop is widely used in construction industries such as long-span industrial workshop, warehouse, cold storage, high-rise building, office building, multi-storey parking lot and residential house.
How to use the machine to remove the rust spots on the surface of Steel building accessories?
What are the main Steel building accessories?
How to remove the rust spots on the surface of Steel building accessories?
For Steel building accessories that have been used for a period of time, there are inevitably some attachments on the surface, such as rust, dirt, dust, old paint film, etc. Before painting the surface of Steel building accessories, if these attachments are not completely removed, although they can be temporarily covered after painting, they play a role of isolation, which makes the coating and the component substrate bond If the strength is severely reduced, the paint film will fall off prematurely, which will eventually reduce the corrosion resistance of the surface coating and fail to play the protective role of the coating. Therefore, before painting the surface of the component, the attachments on the surface of Steel building accessories should be thoroughly cleaned.
In order to improve the quality of rust removal and work efficiency. To improve the working conditions of construction workers, the current Steel building accessories derusting work has adopted a large number of wind-driven or electric small equipment. The main rust removal methods using equipment are:
(1) Angle grinder: This small pneumatic equipment is mainly used to clean flat areas. It can use sandpaper, grinding wheels and wire brushes as needed.
(2) Needle Bundle Derusting Machine: This kind of small pneumatic equipment is generally equipped with 30-40 needle bundles, which can be adjusted with different working surfaces, which are mainly suitable for curved, narrow, uneven and cracked places.
(3) Single-head cold air gun: This small pneumatic equipment is also called zinc knocking. It uses the impact of the knocking head to remove rust. The diameter of the shovel head is generally 25-40mm, and it can impact 1000 to 6000 times per minute. Suitable for relatively narrow places.
1. Two-hole connection accessories
One of the main accessories of Steel building accessories is the double-hole connection accessory, which is mainly used to connect with the corners. The corners on both sides of the right-angle connection can reduce the pressure on the alloy. At the same time, the recesses of the building materials can be based on the aluminum alloy frame.
2. Single hole connector
Steel building accessories also has an important accessory, the single-hole connector, which has a completely different function from the double-pipe connector. It is mainly used for the affinity connection between the aluminum alloy frame and the ground in the ground installation. Therefore, the single-hole connector has The role of anchor bolts.
The Steel building accessories have been widely used in daily life and industrial production. Qingdao Xinguangzheng Steel Structure Co., Ltd. can provide the best Steel building accessories for their customers.
The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
Prefab House refers to a building where parts and components produced in a factory are assembled and connected at the construction site. Steel structure prefabricated buildings refer to steel structure components produced in factories and assembled and connected at the construction site.
Different countries have different understandings and practices of the housing system, but Prefab House generally refers to the main project of the house. Different residential products are formed due to the selection of different structural materials, structural types and construction methods, and constitute a number of corresponding residential products ranging from design to The complete technology of construction. The steel structure residential building system uses the steel structure form as the basis for the classification of the building system and becomes a branch of the building system.
The material of Prefab House has good homogeneity and isotropy, which is an ideal elastic body, which is most in line with the basic assumptions of general engineering mechanics; the material has good plasticity and toughness, can have large deformations, and can well withstand dynamic loads; construction period is short ; It has a high degree of industrialization and can be used for specialized production with a high degree of mechanization; it has high processing accuracy, high efficiency, and good airtightness, so it can be used to build gas tanks, oil tanks, and transformers.
In the future, the steel structure of Prefab House should study high-strength steel to greatly increase its yield point strength; in addition, new types of steel should be rolled, such as H-shaped steel (also known as wide flange steel), T-shaped steel and profiled steel plates, etc. The needs of large-span structures and super high-rise buildings.
(1) Light weight and high strength. Due to the use of steel as the load-bearing structure and new building materials as the enclosure structure, Prefab House generally uses steel structure to build residences that weigh about one-half of the weight of reinforced concrete residences, which reduces the weight of the house and reduces the cost of basic engineering. Since the building area occupied by the vertical force-bearing member is relatively small, the use area of the house can be increased. At the same time, because the steel structure residence adopts a large bay and large depth column network, it provides residents with a large space that can be flexibly separated, which can meet the different needs of users.
(2) The degree of industrialization is high and meets the requirements of industrialization. Most of the structural components of Prefab House are made in factories, which are easy to install and suitable for mass production. This has changed the traditional way of housing construction and realized the transformation from "building houses" to "manufacturing houses". Promoted the transformation of the housing industry from extensive to intensive, and at the same time promoted the development of productivity.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has worked on the production of Prefab Houses for several years. You can find the best Prefab House in this company.
What is the purpose of isolation?
The purpose of isolation is to cut off the route of transmission in the infection chain,protect susceptible persons, and ultimately control or eliminate the source of infection.
Therefore, it is an important measure to prevent the spread of infectious diseases.
From a medical point of view, the goal of "isolation" is to prevent the spread of infection and ultimately eliminate or control the source of infection.
That is to prevent and limit the infectious factors of infected patients directly
or indirectly to susceptible persons,
or to those who may pass on such factors to others, and at the same time, enable infected patients to receive timely treatment under control and return to health as soon as possible.
Why choose container house?
In the construction field, it is called an assembled modular container house, also known as a container building or a container house.
It is a single room as a prefabricated unit.
The external wall panels and interior decoration of each unit are shipped to the factory after completion.
A building structure to be installed on site.
Compared with the traditional building structure, the container house has the following advantages:
(1) Convenient transportation, installation and movement, flexible combination;
(2) The cost is low and it can be completed quickly;
(3) The house can be recycled, and no construction waste is generated during use;
(4) The interior is completely renovated and can be used immediately.
Admittedly, it is precisely because of the advantages of rapid assembly and baggage check-in that the container house can be delivered to the Huoshenshan (Fire God Mountain) hospital within 10 days.
Introduction of Qingdao Jiaodong International Steel Structure Building Airport
Qingdao Jiaodong International Airport (comprehensive transportation center and parking building) project is constructed by open cut method. The buried depth of the structure bottom is about 2.5m, and the wall wrapping surface is about 3.5m * 0.85m.
The column is made of Φ 850 * 25 / φ 700 * 16 straight seam concrete-filled steel tubular column, and the upper and lower columns are welded by variable diameter (φ 850 ~ φ 700). The total height is about 30 meters, and the total weight is about 20 tons. It is transported to the construction site in 17m + 13m sections. Each steel pipe column is made of 25 mm or 16 mm thick steel plate.
Factory processing assembly with an error of ± 2mm to meet the requirements, the construction site using a 250t crane for installation.
Project Area: 25000 sqm
Project Detail:
Xinguangzheng Prefabricated Steel Sports Stadium is single span maximum fish belly type box beam, the maximum span is 50 meters.
The maximum weights of a single piece is 109.5 tons
The web height of the maximum box member is 3.6 meters and the wing width is 0.9 meter.
The maximum thickness of the wing plate is 70m.
Project Spotlight:
The overall performance is a horn shape with great tension, and the architecturat form is landsccape architecture.
The roof of the building is full of greening, integrating the building with the park
The building is equipped with children's natatorium, basketball court, gym, study, culturalcenter and so on.