Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Steel building accessories are constructed of steel materials. It is one of the main types of building structures. The structure consists mainly of steel bearings, steel columns, steel joints and other components made of profile steel and steel plates and uses rust removal and rust protection methods such as silylation, pure manganese phosphation, water washing and drying, galvanizing and so on.
Prefabricate and assemble Steel building accessories on the steel platform according to the installation sequence and process requirements to ensure the welding quality.
The spacing between the splicing joint of flange plate and web plate of section steel shall be greater than 200mm. The splicing length of flange plate shall not be less than 2 times of plate width; The web splicing width shall not be less than 300 mm and the length shall not be less than 600 mm.
In order to facilitate welding and ensure welding quality, the stiffener plates, connecting plates, base plates and cantilever beams (beams) on columns and beams shall be assembled and welded on the ground steel platform according to the dimensions of the construction drawing.
The Steel building accessories prefabricated on the steel platform shall not only be fabricated and assembled according to the construction drawings and specifications, but also consider the process of on-site installation and the change of installation size.
Some Steel building accessories users do not know that steel structures still need to be maintained and maintained. As a result, there is serious corrosion that users often can't find out, which makes steel products appear many unsafe hidden dangers, reduces the safety of Steel building accessories in use, and even affects normal use functions. It is recommended that the design unit not only put forward the painting requirements of the steel structure in the painting design description of the steel structure, but also put forward the maintenance and maintenance requirements of the Steel building accessories according to its use.
There are many ways to prevent Steel building accessories from rusting, and the following are usually used.
The steel structure is made of alloy steel that is not easy to rust
Chemical oxide layer protection method
Using metal coating protection method
Non-metallic coating protection law
In the later maintenance and maintenance process, non-metallic coating protection method is especially commonly used. The surface of the component is protected by paint and plastic, so that it does not contact the surrounding corrosive medium, so as to achieve the purpose of anti-corrosion. This method has good effect, low price, and has a wide range of paint varieties, a wide range of options, and strong applicability. It is not limited by the shape and size of the component. It can form a film with any shape on the surface of the component. The adhesion is firm. It can also follow the temperature change. The components are telescopic and easy to use. It is also possible to give the component a beautiful color.
Great products begin with the best engineering staff, and Qingdao Xinguangzheng Steel Structure Co., Ltd. is ready to assist you with your technical requirements for Steel building accessories.
Prefab house is a structure mainly made of steel, which is one of the main building structure types. The characteristics of steel are high strength, light weight, and high rigidity, so it is especially suitable for the construction of large-span, super-high and super-heavy buildings.
Compared with traditional concrete buildings, what are the advantages of Prefab house?
What are the advantages of Prefab house?
What is the installation process of Prefab house?
Compared with prefabricated concrete buildings, Prefab houses have the following advantages:
1. There is no on-site cast-in-place node, the installation speed is faster, and the construction quality is easier to be guaranteed;
2. The steel structure is a ductile material with better seismic performance;
3. Compared with concrete structure, steel structure has lighter weight and lower foundation cost;
4. The steel structure is a recyclable material, which is more green and environmentally friendly;
5. Well-designed steel structure prefabricated buildings are more economical than prefabricated concrete buildings.
6. The cross-section of beams and columns is smaller, and more usable area can be obtained.
Save heating costs
Prefab house is more energy-efficient and environmentally friendly when used in the home, such as a new type of thermal insulation layer that has a better thermal insulation effect. When a household measurement is implemented and the heating has the same temperature, the room temperature of the "assembled" space is higher. The head of household may consider lowering the heating temperature, saving heating costs and, at the same time, reducing energy consumption.
Save energy
Finished house is of great benefit for energy saving and environmental protection. Through factory production and on-site assembly, it can significantly reduce building protection and waste water, reduce building noise, reduce harmful gas and dust emissions and reduce building and management personnel on site.
The assembly procedure for the steel construction of the Prefab house: steel column assembly -Installation of the supports between the columns -temporary installation of the steel bearer -roof bearings, roof bearings -correction and fixing of the steel bearer -Installation of the maintenance structure.
1. Contamination protection: Avoid rain water entering the metal roof from the outside. Rainwater enters the metal roof mainly through overlapping joints or knots. In order to achieve the function of the centrifuge, it is necessary to use a sealing disc at the screw connection and to make a concealed fixation. Use sealants or welds on the top of the plate. Best use a long board to remove the overlap. Close water-tight treatment for bleeding.
2. Moisture resistant: Avoid condensation of water vapour in the soil and metal wax layer and drain the water vapour in the metal wax layer. The solution is to fill the metal roof with thermal insulation cotton, place a waterproof membrane on the metal floor plate and have ventilated knots on the metal roof.
3. Daylight: Improve indoor lighting during the day by means of skylights and save energy. When installing daylight panels or daylight glass at certain points on the metal roof, the duration of use of the daylight should be aligned with the metal ceiling panel and the connection between the daylight and the metal ceiling panel should be treated watertight.
Seeing this, do you also want to order an Prefab House? If necessary, you can contact Qingdao Xinguangzheng Steel Structure Co., Ltd. they will provide the Prefab House of the best quality.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Mexico galvanized prefab steel layer house building with cages Project
Project address: Mexico
Area: 120m * 16m * 7m
Detailed parameters: Hot-dipped galvanized steel beam, steel column with zinc thickness 100um. Purlins are 275g/m² zinc which
life span can reach 15-20 years.The reasonable design of the feeding regulator ensures the regulator move stably, and the birds will not run away and get stuck.
Steel structures are a new type of construction system that offers the benefits of low weight, easy installation, short construction time, good seismic performance, fast investment recovery and low environmental pollution. It is therefore generally preferred by all parties in the industry. Under the call for green construction, energy saving, environmental protection and resource recycling, steel structures have gradually become widespread in agricultural steel building and the scale of the steel construction industry has expanded further.
What are the requirements for the operating equipment of agricultural steel building?
What are the technical requirements for agricultural steel building?
What are the construction requirements for agricultural steel building?
1. The machinery and equipment of the agricultural steel building are operated and maintained by designated personnel, and the operating certificates are complete.
2. Mechanical operation part and on-site electricity requirements:
a. The rotation and dangerous parts of various machines and electric machinery must be equipped with protective devices.
b. Electrical equipment and wiring must be well insulated, with rain-proof and moisture-proof facilities.
c. The electrical box has a door, color code and number, which meet the installation height. The high-voltage leakage protector and zero grounding are complete. The switch box and electrical equipment must be "one machine, one switch, one leakage", and the fuse and actual equipment load Match.
d. When installing electrical equipment, the switches, circuits, grounding devices, etc. must be inspected, and they must be intact and undamaged, with good insulation.
(1) The agricultural steel building has a reasonable structure, a 360-degree undercut connection, and no bolts on the roof, which completely avoids water seepage and water leakage.
(2) Adopt self-fixing bolts to fix, simplify the operation and greatly reduce the labor intensity of workers. There is no need to set up a scaffold fixing nut, which improves the safety of operation.
(3) The boom of agricultural steel building is detachable and the angle can be adjusted freely, which is suitable for simultaneous construction of arch roofs with multiple spans.
1. First, according to the functional requirements of agricultural steel building, adopt a corresponding reasonable structure system. Achieve advanced technology, novel structure, and achieve the unity of architecture and structure.
2. The agricultural steel building is mostly based on rods, so the size of the rods is as modular and standardized as possible, which is convenient for mechanized manufacturing, transportation, installation, and improves productivity.
3. The agricultural steel building adopts high-efficiency steel with high economic indicators.
4. The nodes of agricultural steel building are very important. Appropriate connection methods should be adopted to make the node design consistent with the simplified structural calculation model. In the past, most of the structural damage occurred at the nodes, so the nodes must be carefully designed and constructed. Advanced and reliable connection methods are used.
Qingdao Xinguangzheng Steel Structure Co., Ltd. employs more than 100 workers, through the efforts of their entire staff, the agricultural steel buildings of high quality, widely used in a variety of architecture, have shared the broad masses of the worldwide market for over a decade.
At present, the construction technology of large-space steel structure construction has made great progress, and the "folding and unfolding" construction technology is a construction method that fully expresses the changes in the construction process of large-span space construction. He turned a large structure into a movable mechanism; the industrial steel building is so popular nowadays mainly because its advantages surpass the previous buildings.
What is the meaning of industrial steel building?
What should I pay attention to when installing steel columns in industrial steel building?
What should be paid attention to when constructing industrial steel building?
The use of steel construction in industrial steel building has the advantages of shorter construction period, higher application rate, sensitive plan, column spacing and large span. As far as the owner is concerned, industrial steel building can shorten the investment construction period and work quickly. The components can be disassembled and re-applied, which promotes environmental protection and saves resources. Therefore, the application in modern industrial design is becoming more and more common.
(1) Due to the heavy weight and long length of the steel column, the industrial steel building cannot be manufactured and transported at one time. Therefore, the method of segmented manufacturing and on-site assembly as a whole is used for hoisting. It is planned to divide the steel column into two sections. The steel column is transported to the site in two sections, the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height in place is about 17 meters. A 50-ton truck crane can meet the hoisting needs, supplemented by a 25-ton truck crane for hoisting.
(2) The hoisting adopts single-machine rotary hoisting. Before lifting, padded wooden squares at the position of the steel column foot plate to prevent the steel column from damaging the foot plate during the lifting process. When the steel column is hoisted, the crane should lift the hook while turning the arm to make the steel column vertically off the ground and put the column into the mouth of the cup.
Ventilation: air exchange in indoor and outdoor areas. Put air vents on the metal roof.
Moisture resistant: Avoid condensation of water vapour in the lower layer of the metal roof and metal roof layer and drain the water vapour in the metal ceiling layer. The solution is to fill the metal roof with thermal insulation cotton, place a waterproof membrane on the metal floor plate and have ventilated knots on the metal roof.
Carrying: construction load, rain, dust, snow pressure, maintenance load. The load bearing capacity of the metal roof depends on the cross-section characteristics of the plate type, the strength and thickness of the material, the power transfer method and the distance of the horses (sub-horses).
Lightning protection: Take the lightning to the ground to prevent the lightning from penetrating the metal roof and entering the room.
After reading this, do you have a better understanding of industrial steel building?? If you want to know more about related products, you can come to the website of Qingdao Xinguangzheng Steel Structure Co., Ltd., they will provide the most considerate service and the highest quality industrial steel building?.