Project Area: 23408 sqm
Project Usage:Pakistan Cola workshop
Project Location: Lahore, Pakistan
Project weight of steel structures: 760 tons.
Project Detail:
Wall & Roof:0.5mm galvanized steel sheet +50mm glass wool+0.4mm galvanized steel sheet.
Span: Multi-Span 100m and 50m
Total Height: 12m
Project picture of Pakistan Prefabricated Steel Structure Construction Cola Workshop :
Company information
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Introduction of Ethiopian Prefabricated steel structural water bottling processing workshop
Located: Ethiopia
Construction area: 2000㎡
Cladding: 0.5mm galvanized sheet (No insolution)
XGZ provide design,fabrication and installation guidance as client's required.
Company information of Ethiopian Prefabricated steel structural water bottling processing workshop
A brief introduction to you about our company first, then you can contact me if there is suitable project in the future.
1200 workers, 360000 ㎡ non-dust workshop, 25 years experience, CE, ISO9001, ISO9712, ISO3834, BV, SGS certificated, one
hour reach Qingdao port, our company, as a manufacture, this is how we keep good quality and competitive prices for global
valued customers.
We provide steel building design, farm house design, manufacture and installation service.
Color steel insulation sandwich panel is the basic materials for steel structure buildings, which is suitable for steel structure industrial plant. It is composed of two layers of formed metal panel and directly foaming, curing molding polymer heat insulation inner core. Color steel insulation sandwich panel commonly used insulation materials are: glass wool, polystyrene(EPS), polyurethane(PU), Rock wool and other insulation materials.
Then, what's the difference between these three insulation materials?
1) Glass wool sandwich panel. Glass wool is a good inorganic thermal insulation material, glass wool is obviously characterized by good fire resistance, flame retardant and moisture absorption, and its price is cheap. The thermal conductivity of the glass wool sandwich board is not greater than 0.038 W/(m2•K).
2) Polystyrene (EPS) sandwich panel. Polystyrene is a polystyrene resin as the main raw material, through the foaming agent foaming and made of internal with numerous closed micropores. Its insulation effect is good, the price is cheap, the strength is slightly poor. Polystyrene (EPS) sandwich board, thermal conductivity is not greater than 0.038W/(m2•K).
3) Polyurethane(PU)sandwich panel. The thermal conductivity of polyurethane sandwich board is no more than 0.033 W/(m2•K), with good thermal insulation performance, good water resistance, good thermal insulation effect, high strength, foam can be made into any shape, suitable for site construction, but the price is expensive.
To meet different thermal insulation requirements, consider the thermal conductivity of the steel structure material and the thickness of the insulation layer. The thermal conductivity of commonly used steel structure insulation materials is as follows: polyurethane foam> polystyrene foam >glass wool > rock wool.
Xinguangzheng steel structure provide you professional technical service for steel structure buildings.
Prefab House refers to a building where parts and components produced in a factory are assembled and connected at the construction site. Steel structure prefabricated buildings refer to steel structure components produced in factories and assembled and connected at the construction site.
Different countries have different understandings and practices of the housing system, but Prefab House generally refers to the main project of the house. Different residential products are formed due to the selection of different structural materials, structural types and construction methods, and constitute a number of corresponding residential products ranging from design to The complete technology of construction. The steel structure residential building system uses the steel structure form as the basis for the classification of the building system and becomes a branch of the building system.
The material of Prefab House has good homogeneity and isotropy, which is an ideal elastic body, which is most in line with the basic assumptions of general engineering mechanics; the material has good plasticity and toughness, can have large deformations, and can well withstand dynamic loads; construction period is short ; It has a high degree of industrialization and can be used for specialized production with a high degree of mechanization; it has high processing accuracy, high efficiency, and good airtightness, so it can be used to build gas tanks, oil tanks, and transformers.
In the future, the steel structure of Prefab House should study high-strength steel to greatly increase its yield point strength; in addition, new types of steel should be rolled, such as H-shaped steel (also known as wide flange steel), T-shaped steel and profiled steel plates, etc. The needs of large-span structures and super high-rise buildings.
(1) Light weight and high strength. Due to the use of steel as the load-bearing structure and new building materials as the enclosure structure, Prefab House generally uses steel structure to build residences that weigh about one-half of the weight of reinforced concrete residences, which reduces the weight of the house and reduces the cost of basic engineering. Since the building area occupied by the vertical force-bearing member is relatively small, the use area of the house can be increased. At the same time, because the steel structure residence adopts a large bay and large depth column network, it provides residents with a large space that can be flexibly separated, which can meet the different needs of users.
(2) The degree of industrialization is high and meets the requirements of industrialization. Most of the structural components of Prefab House are made in factories, which are easy to install and suitable for mass production. This has changed the traditional way of housing construction and realized the transformation from "building houses" to "manufacturing houses". Promoted the transformation of the housing industry from extensive to intensive, and at the same time promoted the development of productivity.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has worked on the production of Prefab Houses for several years. You can find the best Prefab House in this company.
Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.
Steel structures are a new type of construction system that offers the benefits of low weight, easy installation, short construction time, good seismic performance, fast investment recovery and low environmental pollution. It is therefore generally preferred by all parties in the industry. Under the call for green construction, energy saving, environmental protection and resource recycling, steel structures have gradually become widespread in agricultural steel building and the scale of the steel construction industry has expanded further.
What are the requirements for the operating equipment of agricultural steel building?
What are the technical requirements for agricultural steel building?
What are the construction requirements for agricultural steel building?
1. The machinery and equipment of the agricultural steel building are operated and maintained by designated personnel, and the operating certificates are complete.
2. Mechanical operation part and on-site electricity requirements:
a. The rotation and dangerous parts of various machines and electric machinery must be equipped with protective devices.
b. Electrical equipment and wiring must be well insulated, with rain-proof and moisture-proof facilities.
c. The electrical box has a door, color code and number, which meet the installation height. The high-voltage leakage protector and zero grounding are complete. The switch box and electrical equipment must be "one machine, one switch, one leakage", and the fuse and actual equipment load Match.
d. When installing electrical equipment, the switches, circuits, grounding devices, etc. must be inspected, and they must be intact and undamaged, with good insulation.
(1) The agricultural steel building has a reasonable structure, a 360-degree undercut connection, and no bolts on the roof, which completely avoids water seepage and water leakage.
(2) Adopt self-fixing bolts to fix, simplify the operation and greatly reduce the labor intensity of workers. There is no need to set up a scaffold fixing nut, which improves the safety of operation.
(3) The boom of agricultural steel building is detachable and the angle can be adjusted freely, which is suitable for simultaneous construction of arch roofs with multiple spans.
1. First, according to the functional requirements of agricultural steel building, adopt a corresponding reasonable structure system. Achieve advanced technology, novel structure, and achieve the unity of architecture and structure.
2. The agricultural steel building is mostly based on rods, so the size of the rods is as modular and standardized as possible, which is convenient for mechanized manufacturing, transportation, installation, and improves productivity.
3. The agricultural steel building adopts high-efficiency steel with high economic indicators.
4. The nodes of agricultural steel building are very important. Appropriate connection methods should be adopted to make the node design consistent with the simplified structural calculation model. In the past, most of the structural damage occurred at the nodes, so the nodes must be carefully designed and constructed. Advanced and reliable connection methods are used.
Qingdao Xinguangzheng Steel Structure Co., Ltd. employs more than 100 workers, through the efforts of their entire staff, the agricultural steel buildings of high quality, widely used in a variety of architecture, have shared the broad masses of the worldwide market for over a decade.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Introduction of Product:
Steel structure building has a history of several decades in Europe and the United States. It develops rapidly with the
advantages of good seismic resistance, environmental protection and rapid installation. After more than 20 years of
steady development, xinguangzheng steel structure has continuously improved the "turnkey" ability of steel structure
product project from design, construction to decoration completion, providing systematic solutions for enterprises.
Take xinguangzheng apartment building as an example to show the new face of industrial enterprise apartment building.
Xinguangzheng steel structure apartment building
Project structure system:Steel structure light steel structure
Project area:270 square meters
Project size:20*13.5*16m
Project detail: The whole apartment building has 5 floors, from the foundation to the external wall insulation, including water and
electricity system and decoration, are all completed by xinguangzheng steel structure, and equipped with independent
energy-saving central air conditioning.
One is the staff dining room, the other is cement foam board for maintenance. The two - five story is the employee dormitory, the
two outer wall maintenance material is the cement foam board, and the three to five layers of external wall maintenance material
is composite board. There are 4 suites on each floor. The bathroom and toilet of each room are independent rooms. The specific
configuration is 2 rooms, 1 kitchen, 1 hall,1 bath and 1 toilet.