Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
The project of steel structure hangar for African market constructed by Xinguangzheng Group has been completed smoothly. The Niger hangar project need comprehensive consideration, and a severer designing demand. The client has also a higher requirement for the portal.
Given the strictly demand for portal, Xinguangzheng has offered the most specialized blue print as well as installation services, and has finished the project excellently. We have thus gained our clients' trust and support.
Xinguangzheng will continuously seek for technical breakthroughs and new products, offer integrated settlements, and provide our clients with best products and best services, to give our clients more happiness.
Agricultural steel building's adaptable and customizable steel structure provides an ideal environment for agricultural production space. It can be used for storage and background operations, as well as for display and ground retail.
What are the material characteristics of Agricultural steel building?
Why do you choose Agricultural steel building?
What is the current development trend of Agricultural steel building?
1. High material strength and low weight
The steel of the agricultural steelworks has a high strength and a high elasticity module. Compared to concrete and wood, the ratio between density and distance is relatively low. Therefore, under the same load conditions, the steel structure has a small cross section and a low weight, which is convenient for transport and installation. It is suitable for large stretches, large heights and heavy bearing constructions.
2. Steel capacity, good plasticity, uniform material, high structural reliability
Agricultural steel building is suitable for withstanding shocks and dynamic loads and has good seismic performance. The inner structure of the steel is uniform, close to an isotropic homogeneous body. The actual working performance of the steel structure corresponds rather to the calculation theory. The steel structure is therefore highly reliable.
3. High degree of mechanization of steel construction production and assembly
The steel components of Agricultural steel building can easily be manufactured in factories and assembled on site. The mechanised production of steel components in the plant is characterized by high precision, high production efficiency, fast assembly on site and short construction time. Steel construction is the most heavily industrialised construction.
Whether it is used to store hay, equipment, livestock or cars, Agricultural steel buildings and garages have become the preferred structures for farmers and agricultural giants around the world. The use of a transparent frame structure can realize a column-free indoor space, maximize the space, and encourage customization and gradual adjustment. It is the best choice for agricultural construction projects.
In addition, although wooden barns are still particularly generous due to their aesthetic sensitivity, the absolute flexibility of steel allows manufacturers to bend steel into unique, beautiful and modern shapes, which has attracted the attention of contemporary art. In the end, in the face of structural oppositions such as rust, water, insects, and heat, no building material can withstand turmoil better than steel, so Agricultural steel building is the best choice.
At present, Agricultural steel building has been able to design and produce roof tower steel structures according to customer requirements. Agricultural steel building integrates its use and decoration. Agricultural steel building is also multi-functional, equipped with lightning protection, aviation obstruction lights, wireless communication devices, communication dispatching, radio and television and other equipment.
Qingdao Xinguangzheng Steel Structure Co., Ltd. is a Agricultural steel building manufacturer established for more than ten years. We work with customers from design to completion to ensure that all technical requirements are met.
When commercial steel building is widely used, vigorously develop the choice of building energy saving and green building, which can promote the transformation of construction methods.
commercial steel building adopts an innovative building system that integrates industries such as standardized design, industrialized production, assembly construction, integrated decoration, and information management to bring users a safer, more comfortable, energy-saving, and environmentally friendly experience. At present, commercial steel building has been widely used and promoted in many fields such as small and medium office buildings, business clubs, and tourist reception centers, and has been praised and praised by users.
1. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
2. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. The functional conditions, pipeline installation, wall decoration and parts installation are completed in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of the secondary decoration of commercial steel building;
3. The appearance of commercial steel building is diverse, which can meet the requirements of organic integration of various buildings with regional characteristics, traditional culture and living habits. The designer's optimized design, reasonable spatial layout and beautiful architectural appearance make the living more comfortable.
1. Clean room
The cleaning chamber is a box-shaped welding structure of the type of a large chamber plate, the inner wall of the chamber is lined with a wear-resistant protective plate and the cleaning process is carried out in a sealed chamber.
2. Supporting role
It is divided into indoor winding and loading and unloading, which promotes rolling.
The highly chromed wear-resistant coat and the limiting ring are used for the indoor roller strip coat. The highly chromed wear-resistant coat is used to protect the roller tread and to withstand the impact of projectiles. The limiting ring can allow the workpiece to run at a predetermined position to prevent deviations and cause accidents.
3. Lifting gear
Mainly consisting of upper and lower gears, cylinders, belts, funnels, etc.
The upper and lower strap discs of the same diameter take the ribs, the wheel plate and the hub to form a polygonal structure to increase friction, avoid slipping and prolong the life of the belt.
For the repair and replacement of the funnel and the overlapping tape, the lifting eyepiece is bent in shape and the lid is opened at the middle housing of the lifting eyepiece. Open the cover at the bottom of the hoist to remove the blockage of the lower floor.
Set the screws on both sides of the upper shelf of the hoist arch in such a way that the drawbar moves up and down to maintain the stiffness of the hoist belt.
The upper and lower belt discs use external spherical ball bearings with square seats, which can be adjusted automatically for vibrations and shocks and have good sealing performance.
Only the selected high-quality commercial steel building can give full play to its advantages. Qingdao Xinguangzheng Steel Structure Co., Ltd. commits to provide perfect commercial steel buildings and service for every customer.
The development of residential steel building conforms to the industrial technology policy of protecting arable land and saving energy, and is also one of the production methods for realizing residential industrialization. The development of steel structure housing is the general trend.
What is the layout of the residential steel building?
What issues should be paid attention to when designing residential steel building?
Why pay attention to the design of residential steel building?
residential steel building’s column grid layout should be regular, and it is advisable to use residential units or sleeves as the unit to achieve modularity. The modular flat connection, wrong connection and symmetrical concave (convex) connection and other splicing adapt to changes in the overall layout .
When the residential steel building module adopts small column net, it should be combined with the floor and pipeline design; when the module adopts large column net, the facility pipeline should be designed as a fixed-positioned tube bundle, and the electrical and communication lines can be along the cavity and skirting of the partition wall. , Mirror hanging line or top line arrangement.
The kitchen and bathroom are located close to the concrete core tube or concrete shear wall, and avoid steel structure load-bearing components to facilitate the fire prevention and anti-corrosion treatment of steel components.
Vertical pipelines are centrally arranged in pipeline wells or pipeline walls, or installed on site using factory prefabricated tube bundles.
The toilet is drained on the same floor. Use a double pipe system for centralized heating, and use a temperature control valve and a heat meter. Use the equipotential characteristics of the steel structure to make a natural ground connection.
residential steel building should be dominated by construction and design, and other professions should interact closely with each other. In addition to following the general principles of residential building design, residential steel building must also focus on solving:
(1) How to make use of the advantages of steel structure? The beam span can be enlarged, the bays can be more flexible, and more space can be created for residents. But how to avoid the flatness and monotonous facade of the building caused by the steel structure.
(2) It is necessary to solve the fire protection and anti-corrosion problems of steel structure residential buildings. Especially in rainy areas, the quality of anti-corrosion and anti-rust work directly affects the promotion of steel structure housing.
The cost of residential steel building is the most concerned issue of real estate developers. Steel structure residences should be positioned in middle and high-end residences. Steel structure residences are a systematic project. Management and coordination should be strengthened from design, manufacturing, transportation, installation, maintenance and management, so as to reduce costs and improve overall economic benefits. the goal of.
Qingdao Xinguangzheng Steel Structure Co., Ltd. strives to provide top-quality residential steel buildings with reasonable prices, efficient production time, and the most professional customer service.
Step 1: Cutting
Cut steel plate into pieces and connections by flame cutting machines (CNC, Semi-automatic flame cutting machines). Long strips will be used as web and flange plate, connections will be used as connected, reinforced or stiffening plate.
Step 2: Assembly
Combine web and flange plate together through H-beams assembly machine, make tack welding. Keep the web plate in the middle line, do not be off the center line.
Step 3: Gantry automatic submerged arc welding
Make welding by gantry submerged arc welding machine. Make sure the welding sequence and reduce the welding deformation.
Step 4: Flange plate of straightening
Start straightening on welding-finished H steel beams by straightening machine.
Step 5: Connections process
Make holes on connected pieces by drilling machines. Make sure the hole size and precision.
Step 6: Welding
Welding with CO2. Make sure the weld quality without welding flaw.
Step 7: Shot blasting
Make shot blasting on steel profiles. Make sure the blasting grade and quality.
Step 8: Spray painting
Painting or other anti-corrosion surface treatment.
Step 9: Package & Loading
Pack steel structure profiles on steel pallet, which will be easy for loading, transportation and unloading jobs.
Introduction of Zhongjie era Steel Structure Frame Overpass Project
Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.
After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.
Project Introduction:
Solomon office project is a two-story frame structure, with a building area of more than 1500 square meters. The first floor is maintained as aluminum-plastic plate curtain wall and part of glass curtain wall, the second floor is maintained as glass curtain wall, the roof is glass wool composite plate, and the parapet part is aluminum-plastic plate.
Personnel involved in design and construction refinement: Liu Kangning, Jing Yanyan
Total project amount: 2.94 million
Detailed address: Honiara, Solomon Islands
The following project related parameters:
Area: 1500 square meters
Eave height: 7M
Ridge height: 8M
Number of floors: two
Wind speed: 176km / h
Load: second floor load: 450kg / m2, roof: 30kg / m2
Shapes: Framing
Steel consumption: 90 tons
Purpose: Salomon Telekom office and warehouse
Detail of Prefabricated Steel Structure Building Office in Solomon
Main Characters of prefab steel warehouse
· Super Aseismatic
Most part of the structure will be consisted of cold formed steel members, this system aseismatic grade can reachto 8.
· Wind Resistance
Steel structure building has the performance of high strength, solid rigidity and good deformation capacity, can resist strong wind for 50m/s.
·Durable
The steel material will be painted or galvanized as customers' requirement to be more anticorrosion and rustproof, the lifespan of the structure can be reach to 50~70 years.
·Heat Insulation
Sandwich panel can improve the insulation performance of the building, effectively avoid the phenomenon of "cold bridge" wall
·Environment Protection
Little waste for pollution in construction, 100% steel structure materials can be recycled, most of other related materials also can be recycled.
·Easy and Fast Build
Dry construction, will not influenced by the weather and environment, save much time and labor cost. One 300m2 steel structure building, can be finished in 30 days by only 5 workers.