Prefab House only prefabricates some parts, and it must be poured in the same way as traditional buildings on the construction site. It is not "building blocks" as imagined. Therefore, no difference can be seen from the appearance of the house after it is built. Here we are going to introduce the Prefab House.
What are the reasons why people choose Prefab House?
What are the advantages of steel structure prefabricated houses?
What are the advantages of Prefab House for building plant?
1. Prefab House is of great benefit to energy conservation and environmental protection. Through factory production and on-site assembly construction, it can greatly reduce construction waste and construction sewage, reduce construction noise, reduce harmful gas and dust emissions, and reduce on-site construction and management personnel. Generally, it can save 20% of materials and about 60% of water.
2. The housing industrialization of Prefab House is not only beneficial to the capital flow of development enterprises, but can also increase the speed of housing listing, so it can greatly alleviate the current situation of insufficient market supply and adjust the supply relationship. After large-scale promotion, construction costs can be reduced, and it will also play a role in restraining housing prices.
3. Comprehensive cost accounting shows that the construction cost of Prefab House is higher than that of traditional construction methods, but after large-scale promotion, construction costs can be reduced.
First, the components of prefabricated houses can be industrialized in factories. The components are equivalent to standard products and can be installed directly after being transported to the site. It can be said to be convenient and fast. The construction field during the construction period, especially the unparalleled advantages.
prefabricated houses with steel structure are more stable than those made of welded frame steel. In addition, it is cheaper and more economical. Long service life, 50-70 years. Locked with bolts, it can be used repeatedly without any maintenance.
1. Large span: such Prefab House can realize single span or multi span, and the maximum span without center column is 36m.
2. Low cost: according to the requirements of customers, the unit price of Prefab House ranges from $150 / m2 to $300 / m2.
3. Convenient installation and short construction time: save manpower and cost for customers.
4. Prefab House has a long service life: up to 50 years
5. Environmental protection: such buildings are free of harmful substances.
6. Structural stability: earthquake resistance, wind resistance and snow resistance.
7. Others such as waterproof, heat insulation and energy saving.
The Prefab House produced by Qingdao Xinguangzheng Steel Structure Co., Ltd. has been exported to several countries. And there are several offices in the country, which is convenient for domestic customers to maintain. Based on technological innovation, their company constantly improves product quality and provides you with professional Prefab House.
What is the purpose of isolation?
The purpose of isolation is to cut off the route of transmission in the infection chain,protect susceptible persons, and ultimately control or eliminate the source of infection.
Therefore, it is an important measure to prevent the spread of infectious diseases.
From a medical point of view, the goal of "isolation" is to prevent the spread of infection and ultimately eliminate or control the source of infection.
That is to prevent and limit the infectious factors of infected patients directly
or indirectly to susceptible persons,
or to those who may pass on such factors to others, and at the same time, enable infected patients to receive timely treatment under control and return to health as soon as possible.
Why choose container house?
In the construction field, it is called an assembled modular container house, also known as a container building or a container house.
It is a single room as a prefabricated unit.
The external wall panels and interior decoration of each unit are shipped to the factory after completion.
A building structure to be installed on site.
Compared with the traditional building structure, the container house has the following advantages:
(1) Convenient transportation, installation and movement, flexible combination;
(2) The cost is low and it can be completed quickly;
(3) The house can be recycled, and no construction waste is generated during use;
(4) The interior is completely renovated and can be used immediately.
Admittedly, it is precisely because of the advantages of rapid assembly and baggage check-in that the container house can be delivered to the Huoshenshan (Fire God Mountain) hospital within 10 days.
Commercial steel building is a new type of energy-saving and environmentally-friendly building system. It is known as one of the "green buildings" in the 21st century. It is an energy-saving, environmentally-friendly, and recyclable building structure.
The general sequence of commercial steel building welding is: pre welding inspection → preheating and derusting → installation and welding of base plate and arc striking plate → welding → inspection
1. Before commercial steel building welding, check the groove angle, blunt edge, gap and staggered joint, and remove the rust, oil stain and iron oxide scale in and on both sides of the groove.
2. Preheating. Before commercial steel building welding, gas welding or special baking gun shall be used to heat the groove and the base metal within 100mm on both sides evenly, and the surface thermometer shall be used to measure the temperature to prevent the temperature from meeting the requirements or local oxidation on the surface and preheating temperature.
3. Recheck the preheating temperature. If the temperature is not enough, reheat it to make it meet the requirements.
4. When assembling and welding the backing plate and arc striking plate, the surface cleanliness shall be the same as that of the groove surface, the backing plate shall be close to the base metal, and the arc striking plate shall be firmly welded with the base metal.
1. Welding: the weld bead of the first layer shall seal the connection between the base metal and the backing plate in the groove, and then weld layer by layer until the groove is filled. After each weld is welded, the welding slag and spatter must be removed, and the welding defects shall be ground away and repaired in time.
2. An interface must be welded continuously. If it is necessary to stop welding halfway, it shall be subject to thermal insulation and slow cooling treatment, and shall be heated again according to the regulations before re welding.
3. In case of rain and snow, commercial steel building shall stop welding. There shall be a wind shield and canopy around and above the welded junction of components. When the wind speed is greater than 5m / s, the welding shall be stopped. When the ambient temperature is lower than zero, preheating and post heating measures shall be taken for construction according to regulations.
4. Carbon structural steel shall be subject to weld flaw detection after the weld is cooled to ambient temperature, and low alloy structural steel shall be subject to weld flaw detection 24 hours after completion.
5. Welders and inspectors of commercial steel building shall carefully fill in the operation record form.
When purchasing commercial steel building, we should pay attention to the design of waterproof, heat-insulating and anti-corrosion of the steel structure. The design documents did not specify the steel derusting grade and paint and coating thickness, and did not adopt corresponding measures according to the different fire resistance limits of different parts. commercial steel building of thermal insulation protection measures needs to be avoided.
Commercial steel building has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Production introduction of Steel Structure AUDI Showroom and Workshop
Project Name: Audi Showroom and Workshop
Project Area: 4600 m2
Project address: Montevideo Uruguay
Project Details:
1. Showroom: Roof beam is truss structure, column is Box steel
2. Workshop: Roof beam is H section steel, column is H steel.
3. Wall Panel: Horizontal-Assembling PU Sandwich Panel
4. Roof Panel: EPS Sandwich Panel
Introduction of Algerian layer house building with equipment
Project equipment system:4 rows of 5-layer cage nets
Project building feeding quantity:34800 layers
Project detail: On the basis of the customer's civil chicken house, Xinguang is transformed into a modern chicken house. In terms of animal husbandry equipment and plant, the company has a professional technical research and development team, each kind of equipment designed is more suitable for animal needs, so that animals can enjoy five-star treatment. The mode of "intelligent + intelligent equipment" that we have constructed makes farming easy and simple.
The development of residential steel building conforms to the industrial technology policy of protecting arable land and saving energy, and is also one of the production methods for realizing residential industrialization. The development of steel structure housing is the general trend.
What is the layout of the residential steel building?
What issues should be paid attention to when designing residential steel building?
Why pay attention to the design of residential steel building?
residential steel building’s column grid layout should be regular, and it is advisable to use residential units or sleeves as the unit to achieve modularity. The modular flat connection, wrong connection and symmetrical concave (convex) connection and other splicing adapt to changes in the overall layout .
When the residential steel building module adopts small column net, it should be combined with the floor and pipeline design; when the module adopts large column net, the facility pipeline should be designed as a fixed-positioned tube bundle, and the electrical and communication lines can be along the cavity and skirting of the partition wall. , Mirror hanging line or top line arrangement.
The kitchen and bathroom are located close to the concrete core tube or concrete shear wall, and avoid steel structure load-bearing components to facilitate the fire prevention and anti-corrosion treatment of steel components.
Vertical pipelines are centrally arranged in pipeline wells or pipeline walls, or installed on site using factory prefabricated tube bundles.
The toilet is drained on the same floor. Use a double pipe system for centralized heating, and use a temperature control valve and a heat meter. Use the equipotential characteristics of the steel structure to make a natural ground connection.
residential steel building should be dominated by construction and design, and other professions should interact closely with each other. In addition to following the general principles of residential building design, residential steel building must also focus on solving:
(1) How to make use of the advantages of steel structure? The beam span can be enlarged, the bays can be more flexible, and more space can be created for residents. But how to avoid the flatness and monotonous facade of the building caused by the steel structure.
(2) It is necessary to solve the fire protection and anti-corrosion problems of steel structure residential buildings. Especially in rainy areas, the quality of anti-corrosion and anti-rust work directly affects the promotion of steel structure housing.
The cost of residential steel building is the most concerned issue of real estate developers. Steel structure residences should be positioned in middle and high-end residences. Steel structure residences are a systematic project. Management and coordination should be strengthened from design, manufacturing, transportation, installation, maintenance and management, so as to reduce costs and improve overall economic benefits. the goal of.
Qingdao Xinguangzheng Steel Structure Co., Ltd. strives to provide top-quality residential steel buildings with reasonable prices, efficient production time, and the most professional customer service.
Production introduction
Project Name: Sri Lanka Steel Structure Senior Resort Hotel
Project area: 110 square meter per unit
Project location: Sri lanka
Project Overview: As a second floor Resort, wall panel is cement sandwich panel as insulation, and the surface is painting with real stone paint. The roof is UPVC composite tile. Iron fences and stairs also is our company product.
The beam-column joints of Prefab House are mainly connected by bolt welding. However, bolted joints are recommended for fabricated steel structures. The advantage of bolted connection (weld-free connection) is that the installation speed is fast and the construction quality is easier to control.
1. The construction period is short. Generally, the first floor of Prefab House can be built in three or four days, and it only takes one or two days. Steel structure residential systems are mostly manufactured in factories and installed on-site. The amount of on-site work is greatly reduced. Therefore, the construction period can be greatly shortened, and the noise and dust generated during the construction, as well as the consumption of on-site resources and various on-site expenses are correspondingly reduced. Compared with reinforced concrete structures, the construction period can generally be shortened by one-half, the investment benefits can be brought into play in advance, capital turnover can be accelerated, and construction costs can be reduced by 3%-5%.
2. Good seismic performance. Because the steel of Prefab House is an elastically deformable material, it can greatly improve the safety and reliability of the house. The steel structure has high strength, good ductility and light weight, which can greatly improve the mechanical performance of the structure, especially the seismic performance. Judging from the situation after the earthquake at home and abroad, the number of collapsed steel structure residential buildings is very small.
In line with the development direction of building energy efficiency. Prefab House uses steel as the frame and thermal insulation wallboard as the enclosure structure, which can replace clay bricks, reduce the amount of cement, sand, stone, and lime, and reduce the damage to non-renewable resources. On-site wet construction is reduced, and the construction environment is better. At the same time, steel can be recycled and reused, and the environmental pollution during construction and dismantling is small, and its energy saving index can reach more than 50%, which belongs to the green building system.
The application of steel structure in Prefab House has opened up a new application market for my country's steel industry. It can also drive the research and application of related new building materials.
Steel-finished house is generally a residential building constructed with factory-made, economical steel profiles as a supporting work and new lightweight, heat-conserving, heat-insulating and high-strength wall materials as a home. The industrialisation of the steel building house refers to the use of steel construction houses as the final product. Through socialized mass production, the process of investment, development, construction, construction and customer service of steel dwellings is centralised and unified into an overall organisational form. The industrialization of the steel building house is the development trend of the steel building house.
Knowing this, do you also need to order a Prefab House? Qingdao Xinguangzheng Steel Structure Co., Ltd. is committed to providing various Prefab Houses with high quality for all customers from all over the world.