











At present, the construction technology of large-space steel structure construction has made great progress, and the "folding and unfolding" construction technology is a construction method that fully expresses the changes in the construction process of large-span space construction. He turned a large structure into a movable mechanism; the industrial steel building is so popular nowadays mainly because its advantages surpass the previous buildings.
What is the meaning of industrial steel building?
What should I pay attention to when installing steel columns in industrial steel building?
What should be paid attention to when constructing industrial steel building?
The use of steel construction in industrial steel building has the advantages of shorter construction period, higher application rate, sensitive plan, column spacing and large span. As far as the owner is concerned, industrial steel building can shorten the investment construction period and work quickly. The components can be disassembled and re-applied, which promotes environmental protection and saves resources. Therefore, the application in modern industrial design is becoming more and more common.
(1) Due to the heavy weight and long length of the steel column, the industrial steel building cannot be manufactured and transported at one time. Therefore, the method of segmented manufacturing and on-site assembly as a whole is used for hoisting. It is planned to divide the steel column into two sections. The steel column is transported to the site in two sections, the lower lattice part and the upper H-shaped steel column. The weight of the steel column is about 6 tons, and the height in place is about 17 meters. A 50-ton truck crane can meet the hoisting needs, supplemented by a 25-ton truck crane for hoisting.
(2) The hoisting adopts single-machine rotary hoisting. Before lifting, padded wooden squares at the position of the steel column foot plate to prevent the steel column from damaging the foot plate during the lifting process. When the steel column is hoisted, the crane should lift the hook while turning the arm to make the steel column vertically off the ground and put the column into the mouth of the cup.
Ventilation: air exchange in indoor and outdoor areas. Put air vents on the metal roof.
Moisture resistant: Avoid condensation of water vapour in the lower layer of the metal roof and metal roof layer and drain the water vapour in the metal ceiling layer. The solution is to fill the metal roof with thermal insulation cotton, place a waterproof membrane on the metal floor plate and have ventilated knots on the metal roof.
Carrying: construction load, rain, dust, snow pressure, maintenance load. The load bearing capacity of the metal roof depends on the cross-section characteristics of the plate type, the strength and thickness of the material, the power transfer method and the distance of the horses (sub-horses).
Lightning protection: Take the lightning to the ground to prevent the lightning from penetrating the metal roof and entering the room.
After reading this, do you have a better understanding of industrial steel building?? If you want to know more about related products, you can come to the website of Qingdao Xinguangzheng Steel Structure Co., Ltd., they will provide the most considerate service and the highest quality industrial steel building?.
As the strategic decision to develop energy-saving and land-saving housing and construct a conservation-oriented society is further deepened and housing industrialization has become a new growth point for the world’s economic development, the development of residential steel building will be the only way for housing industrialization.
1. residential steel building's structural system is diversified
Many structural systems that can be used for steel structure residences have been developed, steel frame structure, steel frame-support structure, frame-tube structure (steel frame, concrete internal simplified), frame-shear wall structure (shear wall can be steel plate, concrete Or concrete with built-in steel support), light steel structure and staggered truss structure system can all be used as the structural selection of residential steel building.
2. The project cost of residential steel building is slightly higher than that of concrete or equivalent
The cost of steel structure material is higher than that of concrete, but its construction period is short, the use area is large, and the number of floors can be increased under the same conditions. The project cost of residential steel building is slightly higher or equivalent to concrete, and the actual economic benefits are significant, making residential steel building It has become the first choice for high quality and low price, and the best choice for replacing masonry structure houses in the future.
residential steel building has a high technological content. The structure itself is often the architectural expression. The performance and craftsmanship of the steel structure is not only a necessary means to realize the image conception, but also has a significant impact on the architectural image, which determines that the structural conception is the success of the image conception. The key is whether or not. The progress of science and technology and the change of aesthetics will inevitably make steel structure buildings continue to expand their expression vocabulary and seek development. residential steel building sets aside the elements of style, starts from structural rationalism, and absorbs the essence from modern and traditional styles. In the future, it will be possible to create high-quality steel structure buildings with organic integration of technology and art.
The residential steel building of the design structure and the stability calculation of components must cooperate with each other to make them consistent. The consistency between structural calculation and structural design has always been a problem that everyone pays attention to in structural design. For the joint connection requiring to transfer bending moment and not, sufficient stiffness and flexibility shall be given to it respectively, and the eccentricity of members shall be minimized for frame joints, which are often considered by designers when dealing with structural details. However, when it comes to stability, there are often structural requirements or special considerations different from strength. For example, in terms of flexural strength of simply supported beams, the requirement for fixed hinge support is only to prevent displacement and allow rotation in the plane. However, the above requirements are not enough when dealing with the overall stability of the beam. The support shall also be able to prevent the beam from twisting around the longitudinal axis, and allow the beam to rotate in the horizontal plane and the beam end section to warp freely, so as to meet the boundary conditions adopted for stability analysis.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has been committed to providing customers with residential steel buildings and perfect after-sales service so that customers can invest easily, use them with confidence, and have no worries.
Steel building accessories include steel components such as steel wall trusses, steel trusses, steel windshields, steel roof trusses, steel beams, steel columns, steel supports, etc.; specific requirements are corresponding to the quota sub-items, which are calculated separately, and different sub-items are set.
What are the advantages of using Steel building accessories to build houses?
What are the common Steel building accessories on the market?
Why do Steel building accessories need to be fireproofed?
1. The total weight of the building using Steel building accessories is light, which is about half of the concrete structure. At the same time, it can greatly reduce the foundation cost of the house.
2。 The construction speed of Steel building accessories is fast, and the construction period is at least one third shorter than that of the traditional residential system. A 1000 square meter building can be completed in only 20 days and five workers.
3. The house with Steel building accessories has good environmental protection effect. This is because the consumption of sand, stone and ash is greatly reduced during the construction of the residential buildings built by Steel building accessories. The materials used are mainly green, 100% recycled or degraded materials. When the buildings are demolished, most of the materials can be reused or degraded without causing garbage.
4. Steel building accessories is welcomed by everyone for its flexibility and abundance. Large bay design, indoor space can be divided by multiple schemes, which can meet the different needs of users.
5. The use of Steel building accessories meets the requirements of housing industrialization and sustainable development. The steel structure is suitable for mass production in the factory with a high degree of industrialization. It can integrate advanced finished products such as energy saving, waterproof, heat insulation, doors and windows, and apply them in a complete set, integrating design, production and construction, so as to improve the level of construction industry.
1. u-shaped bracket
The u-shaped bracket is also one of the important accessories of Steel building accessories. The bracket is used for the connection between the ground and the main material. In addition to the fixing function, the u-shaped bracket can also balance the overall bearing force.
2. Fishing rod bracket
The fishing rod bracket of the steel structure frame is a single-unit fixing device accessory, which is used for the initial fixing of the single-unit room.
The temperature resistance of steel is poor, and many of its properties change with the rise and fall of temperature. When the temperature reaches between 430-540℃, the yield point, tensile strength and elastic modulus of the steel will drop sharply, and the load-bearing capacity will be lost. Steel building accessories must be maintained with refractory materials.
Qingdao Xinguangzheng Steel Structure Co., Ltd., as a Chinese pioneer in producing Steel building accessories, can ensure the products’ quality and the after-sales service
The light steel structure of commercial steel building is a structure composed of steel materials, and each component or part is connected by welding, bolts or rivets.
commercial steel building is mainly used for low-rise or multi-storey buildings: the prefabricated wall panels are transported to the construction site by special vehicles, hoisted by cranes, connected with the foundation by anchor bolts and connectors, and the wall panels are connected by screws and connectors, and then the light steel floor is installed. The light steel floor is composed of floor beams, profiled steel plates Steel wire mesh and concrete. The construction of the main structure can be completed by constructing the upper floor according to the construction method of one floor and finally installing the roof. The system is applicable to buildings with 6 floors and below. It has the advantages of high assembly rate, short construction cycle, earthquake resistance and typhoon resistance, thermal insulation, large use area in the sleeve, no exposed beams and columns, and recyclable materials.
1. The construction period is short. The construction period of commercial steel building can be shortened by more than 50%;
2. The project quality is stable. The quality of parts and components produced in commercial steel building factory is more stable, which solves many common quality problems of on-site construction technology and human errors in on-site construction, and ensures the project quality;
3. Energy saving and environmental protection, less construction pollution. commercial steel building adopts energy-saving technology, which greatly improves the performance of house thermal insulation and sound insulation, and improves the living comfort of the building. According to statistics, the prefabricated construction method can save about 50% water, 70% wood and 70% construction waste;
4. Integrated decoration, which is carried out simultaneously with architecture, structure and electromechanical design. commercial steel building completes the pre functional conditions, pipeline installation, wall decoration and component installation in place at one time, which not only ensures the decoration quality, but also avoids the repeated waste and secondary pollution of secondary decoration.
1. Variability
The construction quality problems of commercial steel building will continue to evolve and change with external changes and the extension of time, and quality defects will gradually manifest. For example, the welds of steel components cause cracks in the welds that did not originally have cracks due to changes in stress: delayed cracks can occur due to the activity of hydrogen in the welds after welding. In addition, if the component is subjected to long-term overload, the steel component will be bent and deformed under the arch, which will cause hidden dangers.
2. Frequent
When faced with the relatively unfamiliar construction and construction techniques of steel structures, managers and technicians engaged in construction must be very careful and trained before they can take up their posts.
Knowing this, do you also want to order a commercial steel building? Qingdao Xinguangzheng Steel Structure Co., Ltd., which has been a Chinese pioneer in commercial steel building for many years. Their skilled staff can use the best solution for anything, particularly when a custom product is required.
The main structure of the commercial steel building can be installed simultaneously with the wall panel. The main structure and the wall panel are fixed by embedded parts and connectors, which is convenient for installation. It only needs to be hoisted in place, connected and fixed, and the three links of joint treatment are not required. No need for secondary grouting, and has the advantages of short construction period, high assembly rate, good integrity, and good wind pressure resistance.
(1) When the sides of the upper and lower columns without ear plates are symmetrically welded to 1/3 of the plate thickness by two welders on both sides, cut off the ear plates.
(2) Then two welders are symmetrically welded on both sides to 1/3 of the plate thickness on the side where the ear plate is cut off.
(3) Two welders will be responsible for the welding of two adjacent sides.
(4) The joints of the weld bead between every two layers should be staggered with each other, and the weld bead joints welded by two welders should also pay attention to the stagger of each layer. Pay attention to the temperature between the layers during the welding process.
(5) Welding process parameters:
CO2 gas shielded welding: wire diameter Φ1.2mm, current 280~320A, welding speed 350~450mm/min
Extending length of welding wire: about 20mm, gas flow rate 25~80L/min,
Voltage 29~34V, interlayer temperature 120~150℃
We must prefabricate and assemble commercial steel building steel components on the steel platform in accordance with the installation sequence and process requirements, and ensure the quality of welding production.
The spacing between the splicing seam of the splicing flange plate and the splicing seam of the web plate of the section steel should be greater than 200 mm. The splicing length of the flange plate shall not be less than 2 times the plate width; the splicing width of the web shall not be less than 300 mm, and the length shall not be less than 600 mm.
In order to facilitate the welding of commercial steel building and ensure the welding quality, try to weld the reinforcement plates, connecting plates, backing plates, and overhanging beams (beams) on the columns and beams on the ground steel platform according to the dimensions of the construction drawings.
In addition to the fabrication and assembly of steel components prefabricated on the steel platform according to the construction drawings and specifications, the process and installation dimensions of the commercial steel building on-site installation should also be considered.
The construction of commercial steel building has trained a new generation of construction and installation industrial workers. Factory production and mechanized installation avoid the high dependence of the traditional construction industry on labor, moderately reduce the impact of high labor costs brought on by the aging of the global population on the development of the industry, and predictably cultivate a new generation of construction and installation industry workers. It is of far-reaching significance to the sustainable development of the construction industry.
Qingdao Xinguangzheng Steel Structure Co., Ltd. has focused on the development and production of commercial steel buildings for several years. And it commits to provide perfect service for every customer from all over the world.
Project information
15 seconds to show you the speed of XGZ Prefabricated building
Total Building Area 3578.38 ㎡
200 Steel Columns
55 Integrated Floor Slab
Main Construction Completed in 15 days.
Description
Assembly new office building is a comprehensive project. Since the construction, through the development of detailed construction plan, it took only 4 months to complete the various links from the old Office demolition, civil construction, five floor platform assembly, curtain wall and maintenance plate installation, water supply and drainage circuit construction, elevator air conditioning installation and office building decoration, especially the five floor framework assembly link and decoration link which have exceeded the normal construction period On the basis of that, a breakthrough was made.
In the process of construction, all links are locked in close cooperation, construction and installation speed is fast, safety and quality are guaranteed, and a large number of assembly building installation technical details and practical experience have been accumulated.
Introduction of Product:
Steel structure building has a history of several decades in Europe and the United States. It develops rapidly with the
advantages of good seismic resistance, environmental protection and rapid installation. After more than 20 years of
steady development, xinguangzheng steel structure has continuously improved the "turnkey" ability of steel structure
product project from design, construction to decoration completion, providing systematic solutions for enterprises.
Take xinguangzheng apartment building as an example to show the new face of industrial enterprise apartment building.
Xinguangzheng steel structure apartment building
Project structure system:Steel structure light steel structure
Project area:270 square meters
Project size:20*13.5*16m
Project detail: The whole apartment building has 5 floors, from the foundation to the external wall insulation, including water and
electricity system and decoration, are all completed by xinguangzheng steel structure, and equipped with independent
energy-saving central air conditioning.
One is the staff dining room, the other is cement foam board for maintenance. The two - five story is the employee dormitory, the
two outer wall maintenance material is the cement foam board, and the three to five layers of external wall maintenance material
is composite board. There are 4 suites on each floor. The bathroom and toilet of each room are independent rooms. The specific
configuration is 2 rooms, 1 kitchen, 1 hall,1 bath and 1 toilet.
Introduction for Low Price Construction Material Steel Structure Showroom Building Metal Mall Design
Aruba exhibition hall project is a renewal project of Aruba stadium customers, with a building area of 1585 square meters. The exhibition hall is a two-story frame structure, and the warehouse is a portal steel frame structure. Some walls of the exhibition hall are made of glass curtain wall and others. The storehouse is made of cement foam board, and the roof is a polyurethane composite board.
Project location: Aruba
Area: 1585 square meters
Span: 127m
Eaves height: 8.4m
Number of floors: 2
Wind speed: 148km / h
Shapes: Framing
Steel consumption: 92t
Name | Low Price Construction Material Steel Structure Workshop Building Metal Factory Shed Design |
Material | Q235B,Q345B galvanized or painted steel |
Main frame | H-section steel column and steel beam |
Purlin | C/ Z- section steel purlin |
Roof and wall | a) Color-coated corrugated steel sheet, |
Door | a)Rolling up door, |
Window | PVC /Steel or Aluminum Alloy frame window |
Down spout | Round PVC pipe |
Usage | All kinds of industrial workshop, warehouse, poultry shed, supermarket, hangar, etc |
Service life | 50Years |
Detail Information
Roof with a single layer of galvanized steel plate sea blue crown Island, its structure and technical requirements are as follows:
1.V820 type 0.50mm thick galvanized roof panel (sea blue) crown Island
2.75mm thick glass wool with aluminum foil
3.200 * 200 coated steel mesh
4.Q235B C-type steel roof purlin
5.Q345B steel beam
Wall:
1.YX-840 plate type 0.40mm thick galvanized wall panel white gray crown Island
2.Q235B C steel wall purlins
3.Q345B steel column
Paint coating:
1. Shot blasting, rust level Sa2.5
2. In the gray anti-corrosion primer two, each 30 um
Other:
1. Roof panel - sea blue
2. Wall panel - white gray
3. Steel components - medium gray