+86-17806251018         qdxgz08@qdxgz.cn
English
http://a0-static.micyjz.com/cloud/lmBplKinlnSRrjnkoproio/zhutu40.jpg
Short Lead Time for Economical Factory Peb Prefabricated Steel Structure Workshop Building Xinguangzheng

Product feature and application for Economical Factory Peb Prefabricated Steel Structure Workshop Building 

Inquire

We goal to see good quality disfigurement within the manufacturing and provide the most effective support to domestic and overseas shoppers wholeheartedly for portable Steel Warehouse , Industrial steel building custom made, Steel Fabrication supplier, Steel Shed direct sales, We warmly welcome all interested customers to contact us for more information.

产品详情图 (3)
产品详情图 (1)
Main Steel StructureWelded&hot-rolled H section, Galvanized C&Z purlin
RoofEPS,glass wool ,fiberglass,PU insulation or steel sheet.
WallEPS,glass wool ,fiberglass,PU insulation or steel sheet.
WindowAluminum power coated & Plastic steel window
DoorWooden or steel entrance door
Stairs and railSteel stairs and power coated rail
GutterGalvanized or color aluminum
  • Quick and flexible assembly.

All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.

  • Cost- effective.

It will significantly shorten the construction period of your buildings, saving a great deal of time and money.

  • High safety and durability.

The steel structure has light weight but high strength, which is also easy to maintain. It can be utilized for over 50 years.

  • Optimal design.

The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.

  • High utilization.

It is easy to move and relocate steel structure, which can also be recycled without pollution.

  • Solid construction.

The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has excellent seismic performance.

Production line for Economical Factory Peb Prefabricated Steel Structure Workshop Building

生产线图片

Packing and delivery for Economical Factory Peb Prefabricated Steel Structure Workshop Building

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

发货照片

Packing and delivery for Economical Factory Peb Prefabricated Steel Structure Workshop Building

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

客户照片

FAQ

 Q: Are you a factory or trading company?

 A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop   service for our customer. And you can get the best price and competitive price.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: what is the terms of payment?

A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)

Q: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Q: How long can the space frame be used?

A: The use life of the main structure is the designed used life, more than 50 years (standard request of GB).

Basic design requirements of Economical Factory Peb Prefabricated Steel Structure Workshop Building 

Basic Design Requirements

1.Project location5.Length (side wall,m)9.Window quantity, size
2.Snow load6.Width (end wall, m)10.Door quantity, size
3.Wind load7.Wall Height (eave, m)11.Brick wall needed or not. If yes, 1.2m high or 1.5m high
4.Seismic magnitude8.Middle column allowed or not12.Crane needed or not
13.Thermal insulation. If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.

We are pleased to establish a long-term business relationship of mutual benefit. We believe that we can be one of the most reliable Chinese suppliers for you, provide high quality products and service. Short Lead Time for Economical Factory Peb Prefabricated Steel Structure Workshop Building Xinguangzheng, The product will supply to all over the world, such as: Paris, Rotterdam, Irish, Bhutan, Our tenet is "integrity first, quality best". Now we have confidence in providing you with excellent service and ideal merchandise. We sincerely hope we can establish win-win business cooperation with you in the future!

Random Products

Reviews

Product Inquiry

SINCE 1997

About Us
Qingdao Xinguangzheng Steel Structure Co., Ltd, founded in 1997 is one of leading steel structure companies in North China. 

Links

Contact Us
CONTACT US
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap