+86-17806251018         qdxgz08@qdxgz.cn
English
http://a0-static.micyjz.com/cloud/lmBplKinlnSRnjmpklokiq/chanpinzhutu.jpg
Factory Price for Pre-engineered Framing Quick Install Galvanized Steel Workshop Building Xinguangzheng
Inquire

"Control the standard by the details, show the power by quality". Our organization has strived to establish a highly efficient and stable employees team and explored an effective high-quality command method for Construction of livestock farms , Steel Fabrication Wholesale prices, Prefabricated Steel pig farm , quick install galvanized Steel Workshop , We've got professional products knowledge and rich experience on manufacturing. We generally imagine your success is our business enterprise!

1. Specification of Pre-engineered Framing Quick Install Galvanized Steel Workshop Building

Pre-engineered Framing Quick Install Galvanized Steel Workshop Building is high quantity with ISO, CE, BV and SGS certification. It is made of steel structure fame with sandwich panel&single steel sheet wall, usage life is 50 years. It is fast installation and great appearance:

a. Steel structure warehouse has characters of light weight, high strength and large span.

b. Short construction time: For example, a 3,000m2 building can be finished within 30 days by 5 workers. Therefore, it reduce the cost of investment

c. Steel structure warehouse has good fire resistance and corrosion resistance.

d. Steel structure warehouse is easy to move, and cause no pollution to the environment.

e. Steel structure warehouse can assemble cranes to meet your production requirement.


2. Specification of Pre-engineered Framing Quick Install Galvanized Steel Workshop Building

Dimension

Length x width x Eave height

Type

Single slope, double slope, multi slope

Single span,double span, multi span

Beam and column

H&I section Q235B/Q345B(Q355)

Purlin

C/Z section steel with size C100-320, Z160-300,etc

Bracing

Angle steel or round bar

Roof and wall

Single color steel sheet or sandwich panel

Accessory

Skylight band, downpipe, gutter, ventilator,etc

Surface

Anti-corrosive paint or galvanized

Package

Standard steel pallet

 

3. Product details of Pre-engineered Framing Quick Install Galvanized Steel Workshop Building

产品详情图 (2)产品详情图 (1)产品详情图 (4)产品详情图 (3)产品详情图 (5)产品主图

4. Product Certification of Pre-engineered Framing Quick Install Galvanized Steel Workshop Building

H6f53057342bf4d8496427549457e1076E

5. Delivery, shipping and service for Pre-engineered Framing Quick Install Galvanized Steel Workshop Building

a. Shipped in 30 days after drawing confirmed, packed with steel pallets and loading into shipping container.

b. We reply each inquiry within 24 hours  


6. Company Information:

Main products :steel structure building ( including chicken farm , warehouse , workshop , hangar , garage and so on ) . prefab house , container house .

Staff : 100 engineers and 600 production workers .

Area : More than 24000 sqm .

Product Capacity : 1200 TON per mouth.

图片7

7. What we can do?

What we can do

Customer needs, our pursuit. Factory Price for Pre-engineered Framing Quick Install Galvanized Steel Workshop Building Xinguangzheng, The product will supply to all over the world, such as: Venezuela, Seychelles, Seattle, Brunei, As the world economic integration bringing challenges and opportunities to the xxx  industry, our company , by carrying on our teamwork, quality first, innovation and mutual benefit, are confident enough to provide our clients sincerely with qualified products, competitive price and great service, and to build a brighter future under the spirit of higher, faster, stronger with our friends together by carrying on our discipline.

Random Products

Reviews

Product Inquiry

SINCE 1997

About Us
Qingdao Xinguangzheng Steel Structure Co., Ltd, founded in 1997 is one of leading steel structure companies in North China. 

Links

Contact Us
CONTACT US
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap