Publish Time: 2025-06-20 Origin: Site
On June 13, 2025, at the Xinguangzheng Main Plant Area, the installation of the beam for the large 36-meter span gantry crane was completed, officially entering the commissioning and operational phase. This gantry crane possesses the capability to load entire pallets into containers. It can directly lift pallets, replacing the traditional mobile crane method. This will significantly reduce lifting costs while simultaneously improving logistics turnover efficiency, laying a solid hardware foundation for cost reduction and efficiency enhancement throughout the project lifecycle.